Update

Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects

Business Studies

Techniques of scientific management

In Class 12 Business Studies, this topic explains how Frederick Winslow Taylor applied scientific methods to improve efficiency and productivity in the workplace. Students learn about functional foremanship, standardisation and simplification of work, method study, motion study, time study, fatigue study, and the differential piece wage system. The chapter connects these techniques with work planning, employee performance, time management, cost control, and the systematic application of management principles.

Hard · Level 3 · 25 questions

Practice questions

01In a factory the production route was shortened but workers did not receive the new route in written instructions. Which coordination is weak?

0 reads0 helpful★ – (0)

Answer and explanation

02A worker received correct written instruction but material and jig were not available when work started. Which production specialist will be responsible?

0 reads0 helpful★ – (0)

Answer and explanation

03If defects are seen in finished goods but the defect report does not show time and cost impact which record is weak?

0 reads0 helpful★ – (0)

Answer and explanation

04A task has 840 minutes available and time per unit is 14 minutes. What will be the standard output?

0 reads0 helpful★ – (0)

Answer and explanation

05Standard is 108 units. A worker produces 104 units and the low rate is ₹11. What will be the wage?

0 reads0 helpful★ – (0)

Answer and explanation

06A worker produces 132 units. Standard is 125 and high rate is ₹6. 7 units are rejected. If payment is on accepted output what will be the wage?

0 reads0 helpful★ – (0)

Answer and explanation

07If standard method is applied but suppliers provide material of different density which conclusion is correct?

0 reads0 helpful★ – (0)

Answer and explanation

08If 28 product variants were reduced to 9 but the market complained that a high demand variant was removed where is the mistake?

0 reads0 helpful★ – (0)

Answer and explanation

09If product size is standard but too many packaging colours are increasing storage bins which technique is still needed?

0 reads0 helpful★ – (0)

Answer and explanation

10If product variants are few but every packet has different weight which standard is weak?

0 reads0 helpful★ – (0)

Answer and explanation

11If production flow is shortened but workers have to lift heavier trays which combined analysis is needed?

0 reads0 helpful★ – (0)

Answer and explanation

12If machine layout changed and walking reduced but workers have to bend repeatedly what should be checked?

0 reads0 helpful★ – (0)

Answer and explanation

13If workers’ wrist movement reduced and per unit time changed from 10 minutes to 8 minutes what should be revised?

0 reads0 helpful★ – (0)

Answer and explanation

14Which option correctly matches a work study technique with a case cue?

0 reads0 helpful★ – (0)

Answer and explanation

15Which option has an incorrect match between technique and clue?

0 reads0 helpful★ – (0)

Answer and explanation

16If standard time is fixed only on the basis of the fastest worker what is the biggest risk?

0 reads0 helpful★ – (0)

Answer and explanation

17If work method is changed but the target remains the same what weakness may exist?

0 reads0 helpful★ – (0)

Answer and explanation

18If wrist pain and errors increase after a high output target which study seems ignored?

0 reads0 helpful★ – (0)

Answer and explanation

19If actual output is high but accepted output is low which data is necessary for wage decision?

0 reads0 helpful★ – (0)

Answer and explanation

20If inspector detects a defect but the cause is a worker deliberately breaking safety rules which specialist is also necessary?

0 reads0 helpful★ – (0)

Answer and explanation

21If instruction card is correct but workers chose wrong route because the route board was not updated what issue is shown?

0 reads0 helpful★ – (0)

Answer and explanation

22If a worker receives conflicting priorities from route clerk and speed boss which problem of functional foremanship is shown?

0 reads0 helpful★ – (0)

Answer and explanation

23If increasing production speed doubles the rejection rate which combined review is needed?

0 reads0 helpful★ – (0)

Answer and explanation

24If workers are trained but the version of standard tools changed and training was not updated what gap exists?

0 reads0 helpful★ – (0)

Answer and explanation

25If actual cost is high because material flow has extra handling which study will be useful first?

0 reads0 helpful★ – (0)

Answer and explanation

Was this question useful?

No ratings yetWrite a review / Rate this question

Student Reviews

No published reviews yet.

Add Muft Shiksha to your Home Screen

In Safari, tap Share, then Add to Home Screen.