Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects

Business Studies

Techniques of scientific management

In Class 12 Business Studies, this topic explains how Frederick Winslow Taylor applied scientific methods to improve efficiency and productivity in the workplace. Students learn about functional foremanship, standardisation and simplification of work, method study, motion study, time study, fatigue study, and the differential piece wage system. The chapter connects these techniques with work planning, employee performance, time management, cost control, and the systematic application of management principles.

Medium · Level 7 · 25 questions

Practice questions

01A motion study removes unnecessary movements, reducing the time needed per unit. Which standard should be reviewed to reflect the improved method?

0 reads0 helpful★ – (0)

Answer and explanation

02After a process chart is used to select a better method, which study is normally carried out to determine the standard time?

0 reads0 helpful★ – (0)

Answer and explanation

03If output increases but rejected units also increase, what should be kept clear when applying differential piece-rate wages?

0 reads0 helpful★ – (0)

Answer and explanation

04If output is 110 and 5 units are rejected what will be accepted output?

0 reads0 helpful★ – (0)

Answer and explanation

05If actual time is greater than standard time, which functional foreman’s records can be used to compare the two?

0 reads0 helpful★ – (0)

Answer and explanation

06If the route clerk and instruction card clerk do not coordinate, what problem may arise?

0 reads0 helpful★ – (0)

Answer and explanation

07If materials are not standardised, why may performance comparisons be unreliable even when the same method is used?

0 reads0 helpful★ – (0)

Answer and explanation

08If a high work target is set without a suitable rest plan, which risk is more likely to increase?

0 reads0 helpful★ – (0)

Answer and explanation

09A new target is set after work study, but workers are not trained in the prescribed method. What important support is missing?

0 reads0 helpful★ – (0)

Answer and explanation

10A case describes improved material flow, reduced hand movements, a changed time standard, and a planned rest interval. What does this combination indicate?

0 reads0 helpful★ – (0)

Answer and explanation

11Standard is 120 units. A worker produces 124 units but 6 units are rejected. If payment is on accepted output which output will be counted?

0 reads0 helpful★ – (0)

Answer and explanation

12If machine is ready and route is correct but workers did not get proper tools before starting work which specialist was weak?

0 reads0 helpful★ – (0)

Answer and explanation

13If the same product has a quality standard but different grades of material come from suppliers which technique has not been fully applied?

0 reads0 helpful★ – (0)

Answer and explanation

14Total time is 660 minutes including 60 minutes necessary rest and time per unit is 12 minutes. What will be standard output?

0 reads0 helpful★ – (0)

Answer and explanation

15A firm reduced 25 designs to 6 but customers complain that essential designs were also removed. What is the correct analysis?

0 reads0 helpful★ – (0)

Answer and explanation

16If workstation height is wrong and workers get tired quickly, which study is most suitable?

0 reads0 helpful★ – (0)

Answer and explanation

17A worker produces 126 units. Standard is 120 units. High rate is ₹5 and 3 units are rejected. If payment is on accepted output, what will be the wage?

0 reads0 helpful★ – (0)

Answer and explanation

18If walking distance is reduced and then the daily target is changed, what interaction is shown?

0 reads0 helpful★ – (0)

Answer and explanation

19If the machine is proper but workers do not reach the target because speed is too slow, which specialist, not the repair boss, will be central?

0 reads0 helpful★ – (0)

Answer and explanation

20Total time is 720 minutes, including 80 minutes of necessary rest, and the time per unit is 16 minutes. What will be the standard output?

0 reads0 helpful★ – (0)

Answer and explanation

21The standard is 115 units. A worker produces 119 units, and the high rate is ₹12 per unit. What will be the wage?

0 reads0 helpful★ – (0)

Answer and explanation

22A worker produces 132 units. The standard is 125 units and the high rate is ₹6 per unit. Seven units are rejected. If payment is based on gross output, what will be the wage?

0 reads0 helpful★ – (0)

Answer and explanation

23A worker produces 150 units. The standard is 145 units and the high rate is ₹7 per unit. Six units are rejected. What will be the wage on gross output?

0 reads0 helpful★ – (0)

Answer and explanation

24Which option gives the correct sequence of method study and time study?

0 reads0 helpful★ – (0)

Answer and explanation

25If the production target is high and no rest plan is provided, what is the most practical risk?

0 reads0 helpful★ – (0)

Answer and explanation