Update

Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects

Business Studies

Techniques of scientific management

In Class 12 Business Studies, this topic explains how Frederick Winslow Taylor applied scientific methods to improve efficiency and productivity in the workplace. Students learn about functional foremanship, standardisation and simplification of work, method study, motion study, time study, fatigue study, and the differential piece wage system. The chapter connects these techniques with work planning, employee performance, time management, cost control, and the systematic application of management principles.

Medium · Level 2 · 25 questions

TOPIC PRACTICE

Quiz this set

Up to 25 questions from this page. Select your focus, then start.

25 questions

Choose questions
View options
  1. Repair boss
  2. Speed boss
  3. Inspector
  4. Route clerk
View options
  1. Repair boss
  2. Route clerk
  3. Gang boss
  4. Inspector
View options
  1. Speed boss
  2. Gang boss
  3. Repair boss
  4. Disciplinarian
View options
  1. Route clerk — planning side
  2. Speed boss — planning side
  3. Time and cost clerk — production side
  4. Disciplinarian — production side
View options
  1. Inspector — production side
  2. Gang boss — production side
  3. Repair boss — production side
  4. Instruction card clerk — production side
View options
  1. Time study
  2. Method study
  3. Motion study
  4. Simplification
View options
  1. Standardisation
  2. Simplification
  3. Fatigue study
  4. Differential piece-rate system
View options
  1. The lower rate for output below standard
  2. The higher rate for meeting the standard
  3. No piece rate, because output must exceed the standard
  4. A rate determined by the machine’s colour
View options
  1. 50 units
  2. 55 units
  3. 60 units
  4. 65 units
View options
  1. Motion study
  2. Time study
  3. Standardisation
  4. Fatigue study
View options
  1. Motion study
  2. Method study
  3. Simplification
  4. Time study
View options
  1. Motion study
  2. Method study
  3. Fatigue study
  4. Differential wage
View options
  1. More confusion
  2. No need for training
  3. Uniformity
  4. Work stoppage
View options
  1. Standardisation
  2. Motion study
  3. Fatigue study
  4. Simplification
View options
  1. Quality standards and inspection
  2. A higher wage rate only
  3. Simplification only
  4. Bank loan
View options
  1. ₹480
  2. ₹456
  3. ₹460
  4. ₹486
View options
  1. 54
  2. 58
  3. 60
  4. 65
View options
  1. Method study
  2. Standardisation
  3. Simplification
  4. Fatigue study
View options
  1. Disciplinarian
  2. Route clerk
  3. Time and cost clerk
  4. Gang boss
View options
  1. The machine has stopped
  2. The written method of work is unclear
  3. Production speed is low
  4. A scratch is visible on the finished product
View options
  1. Repair boss
  2. Gang boss
  3. Speed boss
  4. Inspector
View options
  1. Route clerk
  2. Speed boss
  3. Time and cost clerk
  4. Repair boss
View options
  1. Confusion may arise
  2. Costs always become zero
  3. Simplification is completed
  4. Standard time is eliminated
View options
  1. Time study unnecessary movement
  2. Fatigue study rest and fatigue causes
  3. Motion study standard time
  4. Method study wage rate
View options
  1. Simplification — uniform quality
  2. Standardisation — reduction of unnecessary varieties
  3. Time study — standard time
  4. Motion study — rest intervals

Add Muft Shiksha to your Home Screen

In Safari, tap Share, then Add to Home Screen.