Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects

Business Studies

Techniques of scientific management

In Class 12 Business Studies, this topic explains how Frederick Winslow Taylor applied scientific methods to improve efficiency and productivity in the workplace. Students learn about functional foremanship, standardisation and simplification of work, method study, motion study, time study, fatigue study, and the differential piece wage system. The chapter connects these techniques with work planning, employee performance, time management, cost control, and the systematic application of management principles.

Expert · Level 4 · 25 questions

Practice questions

01If workers are trained but job rotation is so frequent that speed does not stabilise what is the practical issue?

0 reads0 helpful★ – (0)

Answer and explanation

02If high standard output is given but method training is not done what is the most serious gap?

0 reads0 helpful★ – (0)

Answer and explanation

03If accepted output is 144 and high rate is ₹13 what will be the wage?

0 reads0 helpful★ – (0)

Answer and explanation

04If 72 units are produced in 1080 minutes what is per unit standard time?

0 reads0 helpful★ – (0)

Answer and explanation

05If route is correct but an old route board makes workers walk extra distance what is the root issue?

0 reads0 helpful★ – (0)

Answer and explanation

06If actual cost is high because material is handled multiple times which study will give root correction?

0 reads0 helpful★ – (0)

Answer and explanation

07If a new output standard is announced but workers are not told the time study process what risk exists?

0 reads0 helpful★ – (0)

Answer and explanation

08If product varieties are few and input is standard but workstation layout is a bottleneck which study is needed?

0 reads0 helpful★ – (0)

Answer and explanation

09If output is 210 and 17 units are rejected what will be accepted output?

0 reads0 helpful★ – (0)

Answer and explanation

10If machine route and material are correct but final product is defective whose checking role comes first?

0 reads0 helpful★ – (0)

Answer and explanation

11If defects are caused by a wrong measuring gauge which pair of weak technique and correction role is correct?

0 reads0 helpful★ – (0)

Answer and explanation

12If rest plan is not revised after higher output and errors rise what is the integrated action?

0 reads0 helpful★ – (0)

Answer and explanation

13If different inspectors pass or fail the same product using different criteria what should be standardised first?

0 reads0 helpful★ – (0)

Answer and explanation

14If an automated machine is installed but the old manual method time standard is still applied what is the most correct action?

0 reads0 helpful★ – (0)

Answer and explanation

15If a new automated machine is installed but production targets are still based on the old manual time standard, what is the most scientific step?

0 reads0 helpful★ – (0)

Answer and explanation

16In a factory, the correct work route has been set, but the written instructions still list obsolete tools. Which pair of functional foremen needs better coordination?

0 reads0 helpful★ – (0)

Answer and explanation

17Materials have arrived on time, but work cannot begin because a clamp of the required size is unavailable. Which functional foreman is mainly responsible for this preparation?

0 reads0 helpful★ – (0)

Answer and explanation

18A worker produces 168 units. Standard is 160 and high rate is ₹11. What will be wage on gross output?

0 reads0 helpful★ – (0)

Answer and explanation

19A worker produces 168 units. Standard is 160 and high rate is ₹11. 10 units are rejected. What will be wage on accepted output?

0 reads0 helpful★ – (0)

Answer and explanation

20Standard is 150 units. A worker produces 147 units and low rate is ₹13. What will be the wage?

0 reads0 helpful★ – (0)

Answer and explanation

21If the tools and work method are the same but the purity of the raw material differs, why is a fair comparison of performance difficult?

0 reads0 helpful★ – (0)

Answer and explanation

22A company reduced its 42 product designs to 12 but eliminated its two best-selling designs. What was the main mistake?

0 reads0 helpful★ – (0)

Answer and explanation

23There are few product varieties, but the volume of each box differs. Which standard is still incomplete?

0 reads0 helpful★ – (0)

Answer and explanation

24Small hand movements have been reduced, but materials still pass through the wrong departments. Which study is still needed?

0 reads0 helpful★ – (0)

Answer and explanation

25A new layout reduces walking, but the job still requires repeated shoulder rotation. Which combined review is needed?

0 reads0 helpful★ – (0)

Answer and explanation

Was this question useful?

No ratings yetWrite a review / Rate this question

Student Reviews

No published reviews yet.

Add Muft Shiksha to your Home Screen

In Safari, tap Share, then Add to Home Screen.