Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects

Business Studies

Techniques of scientific management

In Class 12 Business Studies, this topic explains how Frederick Winslow Taylor applied scientific methods to improve efficiency and productivity in the workplace. Students learn about functional foremanship, standardisation and simplification of work, method study, motion study, time study, fatigue study, and the differential piece wage system. The chapter connects these techniques with work planning, employee performance, time management, cost control, and the systematic application of management principles.

Hard · Level 6 · 24 questions

Practice questions

01If a common height for tools is prescribed and suitable rest pauses are also planned, which two techniques are being used?

0 reads0 helpful★ – (0)

Answer and explanation

02A worker has high output, but the actual cost is also high. Which functional foremanship clerk’s records would help compare the time taken and the cost incurred?

0 reads0 helpful★ – (0)

Answer and explanation

03If actual time is high but quality is much better why may a decision based only on time record be wrong?

0 reads0 helpful★ – (0)

Answer and explanation

04A new output standard is announced, but workers are not told how the time study was carried out. What practical risk may result?

0 reads0 helpful★ – (0)

Answer and explanation

05If workers are trained but the manual of the new standard tool is outdated what gap exists?

0 reads0 helpful★ – (0)

Answer and explanation

06A quality standard has been written, but workers have not been taught the required quality limits. What support is needed to help them apply it correctly?

0 reads0 helpful★ – (0)

Answer and explanation

07If output is increased only by asking workers to move faster, while unnecessary steps in the process remain, which improvement is missing?

0 reads0 helpful★ – (0)

Answer and explanation

08The planned route is correct, but the old workplace layout makes materials travel an unnecessarily long distance. Which study could help improve the work process?

0 reads0 helpful★ – (0)

Answer and explanation

09If a worker produces 160 units and 12 units are on quality hold what is the accepted output?

0 reads0 helpful★ – (0)

Answer and explanation

10If the product mix changes but the old output standard is kept unchanged, what may happen to that standard?

0 reads0 helpful★ – (0)

Answer and explanation

11Under Taylor’s functional foremanship, a worker may receive instructions from several specialist foremen. Which Fayol principle does this arrangement conflict with?

0 reads0 helpful★ – (0)

Answer and explanation

12A worker has the aptitude for a task but is repeatedly moved to other jobs before gaining steady practice. Which management practice would best support efficient performance?

0 reads0 helpful★ – (0)

Answer and explanation

13Production flow improves, but total cost does not fall because rework has increased. Which data should managers also examine?

0 reads0 helpful★ – (0)

Answer and explanation

14Standardisation and simplification are already in place, but a bottleneck remains because the sequence of work is inefficient. Which scientific management technique can help identify a better way of doing the work?

0 reads0 helpful★ – (0)

Answer and explanation

15A case describes an updated route plan and instruction card, standardised materials, reduced unnecessary motion, revised task times, balanced rest periods, and wages linked to accepted output. What does this combination show?

0 reads0 helpful★ – (0)

Answer and explanation

16If workers deliberately ignore standard instructions and rejection increases, which specialist is needed along with the inspector?

0 reads0 helpful★ – (0)

Answer and explanation

17A worker produces 142 units, of which 5 are rejected. If each accepted unit is paid at the stated high rate of ₹9, what wage is payable on accepted output?

0 reads0 helpful★ – (0)

Answer and explanation

18If standards and variances are appropriate but a bottleneck remains in the production process, which scientific-management technique is still required?

0 reads0 helpful★ – (0)

Answer and explanation

19Which option correctly matches a scientific-management technique with its expert cue?

0 reads0 helpful★ – (0)

Answer and explanation

20A worker produces 156 units, of which 8 are rejected. If each accepted unit is paid at the high rate of ₹9, what wage is payable on accepted output?

0 reads0 helpful★ – (0)

Answer and explanation

21Which option correctly matches a scientific-management technique with its expert cue?

0 reads0 helpful★ – (0)

Answer and explanation

22If speed is increased to earn a high rate but safety incidents also rise, what should the best work method include?

0 reads0 helpful★ – (0)

Answer and explanation

23If defects rise after increasing production speed, the speed boss's decision should be balanced with what?

0 reads0 helpful★ – (0)

Answer and explanation

24If the machine is proper but workers deliberately ignore instructions and defects rise, which specialist will be central?

0 reads0 helpful★ – (0)

Answer and explanation

Was this question useful?

No ratings yetWrite a review / Rate this question

Student Reviews

No published reviews yet.

Add Muft Shiksha to your Home Screen

In Safari, tap Share, then Add to Home Screen.