Update

Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects

Business Studies

Techniques of scientific management

In Class 12 Business Studies, this topic explains how Frederick Winslow Taylor applied scientific methods to improve efficiency and productivity in the workplace. Students learn about functional foremanship, standardisation and simplification of work, method study, motion study, time study, fatigue study, and the differential piece wage system. The chapter connects these techniques with work planning, employee performance, time management, cost control, and the systematic application of management principles.

Easy · Level 3 · 25 questions

Practice questions

01Which technique fixes definite quality and size standards?

0 reads0 helpful★ – (0)

Answer and explanation

02If rules are not being followed at the workplace which specialist is related in functional foremanship?

0 reads0 helpful★ – (0)

Answer and explanation

03If defects are found in finished goods which specialist will check them?

0 reads0 helpful★ – (0)

Answer and explanation

04Which study in work study is related to reducing worker fatigue?

0 reads0 helpful★ – (0)

Answer and explanation

05If the same safety rules are fixed for all machines in a factory which technique is this?

0 reads0 helpful★ – (0)

Answer and explanation

06Which post does not belong to the planning department in functional foremanship?

0 reads0 helpful★ – (0)

Answer and explanation

07If the whole working method of a worker is changed to save time which study is mainly used?

0 reads0 helpful★ – (0)

Answer and explanation

08If 1 unit takes 5 minutes and 250 minutes are available what will be the standard output?

0 reads0 helpful★ – (0)

Answer and explanation

09If the standard is 60 units and a worker produces 65 units, which rate may be received under differential wages?

0 reads0 helpful★ – (0)

Answer and explanation

10If tools kept far away increase hand movement at the workplace which study will be useful?

0 reads0 helpful★ – (0)

Answer and explanation

11Which technique simplifies work by reducing too many product types?

0 reads0 helpful★ – (0)

Answer and explanation

12Who is responsible for checking whether workers are working at proper speed?

0 reads0 helpful★ – (0)

Answer and explanation

13If materials and tools are arranged before work starts which foreman’s role is shown?

0 reads0 helpful★ – (0)

Answer and explanation

14If the machine is proper but defects are found in finished goods which specialist is mainly needed for checking?

0 reads0 helpful★ – (0)

Answer and explanation

15In which technique of scientific management is work divided among specialist foremen?

0 reads0 helpful★ – (0)

Answer and explanation

16How many specialists are there in total in planning and production sides under functional foremanship?

0 reads0 helpful★ – (0)

Answer and explanation

17Which of the following is a planning department specialist?

0 reads0 helpful★ – (0)

Answer and explanation

18Who is the specialist that decides the route and sequence of work?

0 reads0 helpful★ – (0)

Answer and explanation

19Who is the specialist that prepares written work instructions?

0 reads0 helpful★ – (0)

Answer and explanation

20Who keeps the details of time and cost?

0 reads0 helpful★ – (0)

Answer and explanation

21Who is responsible for maintaining discipline at the workplace?

0 reads0 helpful★ – (0)

Answer and explanation

22Who arranges tools and material before work starts?

0 reads0 helpful★ – (0)

Answer and explanation

23Which specialist is related to maintaining proper speed of work?

0 reads0 helpful★ – (0)

Answer and explanation

24Whose work is to keep machines and tools in proper condition?

0 reads0 helpful★ – (0)

Answer and explanation

25Who is the specialist that checks the quality of finished goods?

0 reads0 helpful★ – (0)

Answer and explanation

Was this question useful?

No ratings yetWrite a review / Rate this question

Student Reviews

No published reviews yet.

Add Muft Shiksha to your Home Screen

In Safari, tap Share, then Add to Home Screen.