Class 12 Business Studies - Business Environment - Legal environment Hard Quiz

Level 43 • 50/50 questions • 30 seconds per question.

Level readiness 50/50 Questions
Time Left 25:00 30 sec/question
RewardsCoins + XP
ModeClassic Quiz
Share
Question 1 / 50 0 score
Answered 0/50 Correct 0 Time 25:00

एक कारखाने ने पहले स्टॉपवॉच से समय मापा और बाद में पाया कि कार्य विधि में कई अनावश्यक चरण थे। सबसे सही सुधार क्या होगा?

A factory first measured time by stopwatch and later found many unnecessary steps in the work method. What is the most correct correction?

Explanation opens after your attempt
Correct Answer

B. पहले विधि अध्ययन कर फिर समय अध्ययन दोहरानाFirst do method study and then repeat time study

Step 1

Concept

Time standard may be weak without deciding the best method. Exam tip: place method study before time study.

Step 2

Why this answer is correct

The correct answer is B. पहले विधि अध्ययन कर फिर समय अध्ययन दोहराना / First do method study and then repeat time study. Time standard may be weak without deciding the best method. Exam tip: place method study before time study.

Step 3

Exam Tip

सर्वोत्तम विधि तय किए बिना समय मानक कमजोर हो सकता है। परीक्षा में विधि अध्ययन को समय अध्ययन से पहले रखें।

Open Question Page
Ask Friends

एक श्रमिक को रूट क्लर्क सही मार्ग देता है लेकिन गैंग बॉस सामग्री देर से उपलब्ध कराता है। देरी का मुख्य कारण किससे जुड़ा है?

A worker receives the correct route from the route clerk but the gang boss provides material late. The main cause of delay is related to whom?

Explanation opens after your attempt
Correct Answer

B. गैंग बॉसGang boss

Step 1

Concept

The route is correct so the delay is related to material arrangement. Exam tip: distinguish route from material readiness.

Step 2

Why this answer is correct

The correct answer is B. गैंग बॉस / Gang boss. The route is correct so the delay is related to material arrangement. Exam tip: distinguish route from material readiness.

Step 3

Exam Tip

मार्ग सही है इसलिए देरी सामग्री व्यवस्था से जुड़ी है। परीक्षा में मार्ग और सामग्री तैयारी को अलग पहचानें।

Open Question Page
Ask Friends

यदि लिखित निर्देश सही हैं लेकिन श्रमिक जानबूझकर उनका पालन नहीं करते और दोष बढ़ते हैं तो कौन सा विशेषज्ञ निरीक्षक के साथ जरूरी है?

If written instructions are correct but workers deliberately do not follow them and defects increase which specialist is needed along with inspector?

Explanation opens after your attempt
Correct Answer

A. डिसिप्लिनेरियनDisciplinarian

Step 1

Concept

Inspector detects defects but deliberate non compliance is a discipline issue. Exam tip: always read the cause of defect.

Step 2

Why this answer is correct

The correct answer is A. डिसिप्लिनेरियन / Disciplinarian. Inspector detects defects but deliberate non compliance is a discipline issue. Exam tip: always read the cause of defect.

Step 3

Exam Tip

दोष निरीक्षक पकड़ेगा पर जानबूझकर नियम न मानना अनुशासन का विषय है। परीक्षा में दोष के कारण को जरूर पढ़ें।

Open Question Page
Ask Friends

यदि दोषों का कारण मशीन की गलत सेटिंग है तो केवल अंतिम निरीक्षण क्यों पर्याप्त नहीं होगा?

If defects are caused by wrong machine setting why will only final inspection not be enough?

Explanation opens after your attempt
Correct Answer

A. क्योंकि मूल सुधार मरम्मत बॉस से जुड़ा हैBecause root correction is linked with repair boss

Step 1

Concept

Inspection reveals defects but correcting machine condition is repair boss work. Exam tip: separate detection and correction.

Step 2

Why this answer is correct

The correct answer is A. क्योंकि मूल सुधार मरम्मत बॉस से जुड़ा है / Because root correction is linked with repair boss. Inspection reveals defects but correcting machine condition is repair boss work. Exam tip: separate detection and correction.

Step 3

Exam Tip

निरीक्षण दोष बताता है लेकिन मशीन की स्थिति सुधारना मरम्मत बॉस का काम है। परीक्षा में पहचान और सुधार अलग रखें।

Open Question Page
Ask Friends

कंपनी ने समान उपकरण तय किए लेकिन कर्मचारियों को अलग अलग निजी विधियों से काम करने दिया। कौन सा लाभ कमजोर रहेगा?

A company fixed uniform tools but allowed employees to work by different personal methods. Which benefit will remain weak?

Explanation opens after your attempt
Correct Answer

A. विधि की एकरूपता और प्रदर्शन तुलनाUniformity of method and performance comparison

Step 1

Concept

Standardisation should include work method along with tools. Exam tip: see uniform tools and uniform method together.

Step 2

Why this answer is correct

The correct answer is A. विधि की एकरूपता और प्रदर्शन तुलना / Uniformity of method and performance comparison. Standardisation should include work method along with tools. Exam tip: see uniform tools and uniform method together.

Step 3

Exam Tip

मानकीकरण में उपकरणों के साथ कार्य विधि भी समान होनी चाहिए। परीक्षा में समान औजार और समान विधि को साथ देखें।

Open Question Page
Ask Friends

मानक 95 इकाई है। श्रमिक 98 इकाई बनाता है लेकिन 4 इकाई अस्वीकृत हो जाती हैं। यदि भुगतान स्वीकृत उत्पादन पर है तो कौन सा उत्पादन गिना जाएगा?

The standard is 95 units. A worker produces 98 units but 4 units are rejected. If payment is based on accepted output which output will be counted?

Explanation opens after your attempt
Correct Answer

C. 94 इकाई94 units

Step 1

Concept

Rejected units are deducted from accepted output. Exam tip: keep gross output and accepted output separate.

Step 2

Why this answer is correct

The correct answer is C. 94 इकाई / 94 units. Rejected units are deducted from accepted output. Exam tip: keep gross output and accepted output separate.

Step 3

Exam Tip

स्वीकृत उत्पादन में अस्वीकृत इकाइयां घटती हैं। परीक्षा में कुल उत्पादन और स्वीकृत उत्पादन अलग रखें।

Open Question Page
Ask Friends

कुल 660 मिनट में 60 मिनट आवश्यक विश्राम है और प्रति इकाई समय 12 मिनट है। मानक उत्पादन कितना होगा?

Total time is 660 minutes including 60 minutes necessary rest and time per unit is 12 minutes. What will be standard output?

Explanation opens after your attempt
Correct Answer

B. 50 इकाई50 units

Step 1

Concept

Working time is 600 minutes so standard output is \(600 \div 12 = 50\) units. Exam tip: deduct rest before calculation.

Step 2

Why this answer is correct

The correct answer is B. 50 इकाई / 50 units. Working time is 600 minutes so standard output is \(600 \div 12 = 50\) units. Exam tip: deduct rest before calculation.

Step 3

Exam Tip

कार्य समय 600 मिनट है इसलिए मानक उत्पादन 50 इकाई होगा। परीक्षा में विश्राम घटाकर गणना करें।

Open Question Page
Ask Friends

यदि श्रमिकों की अनावश्यक हाथ गति हट गई लेकिन पूरी सामग्री प्रवाह में अब भी लंबा मार्ग है तो अगला अध्ययन कौन सा होगा?

If unnecessary hand movement of workers is removed but the overall material flow still has a long route which study should come next?

Explanation opens after your attempt
Correct Answer

B. विधि अध्ययनMethod study

Step 1

Concept

Hand movement is motion study but overall process flow is method study. Exam tip: distinguish micro movement from process flow.

Step 2

Why this answer is correct

The correct answer is B. विधि अध्ययन / Method study. Hand movement is motion study but overall process flow is method study. Exam tip: distinguish micro movement from process flow.

Step 3

Exam Tip

हाथ की गति गति अध्ययन है लेकिन पूरी प्रक्रिया का प्रवाह विधि अध्ययन है। परीक्षा में सूक्ष्म गति और प्रक्रिया प्रवाह अलग रखें।

Open Question Page
Ask Friends

एक फर्म ने 25 डिजाइन घटाकर 6 किए पर ग्राहक शिकायत करते हैं कि जरूरी डिजाइन भी हटा दिए गए। सही विश्लेषण क्या है?

A firm reduced 25 designs to 6 but customers complain that essential designs were also removed. What is the correct analysis?

Explanation opens after your attempt
Correct Answer

A. सरलीकरण संतुलित नहीं थाSimplification was not balanced

Step 1

Concept

Simplification reduces unnecessary varieties not essential demand. Exam tip: check both demand and variety.

Step 2

Why this answer is correct

The correct answer is A. सरलीकरण संतुलित नहीं था / Simplification was not balanced. Simplification reduces unnecessary varieties not essential demand. Exam tip: check both demand and variety.

Step 3

Exam Tip

सरलीकरण अनावश्यक किस्में घटाता है जरूरी मांग नहीं। परीक्षा में मांग और विविधता दोनों देखें।

Open Question Page
Ask Friends

यदि एक ही उत्पाद के लिए गुणवत्ता मानक तय हैं लेकिन सप्लायर अलग अलग ग्रेड का कच्चा माल भेजते हैं तो कौन सी तकनीक अधूरी है?

If quality standards are fixed for the same product but suppliers send different grades of raw material which technique is incomplete?

Explanation opens after your attempt
Correct Answer

C. मानकीकरणStandardisation

Step 1

Concept

Uniform raw material quality is also linked with standardisation. Exam tip: connect input quality with standardisation.

Step 2

Why this answer is correct

The correct answer is C. मानकीकरण / Standardisation. Uniform raw material quality is also linked with standardisation. Exam tip: connect input quality with standardisation.

Step 3

Exam Tip

कच्चे माल की समान गुणवत्ता भी मानकीकरण से जुड़ी है। परीक्षा में input quality को standardisation से जोड़ें।

Open Question Page
Ask Friends

मानक 110 इकाई है। श्रमिक 112 इकाई बनाता है और उच्च दर ₹13 है। मजदूरी कितनी होगी?

Standard is 110 units. A worker produces 112 units and the high rate is ₹13. What will be the wage?

Explanation opens after your attempt
Correct Answer

B. ₹1456

Step 1

Concept

Output above standard gets high rate on all units. Exam tip: calculate \(112 \times 13\).

Step 2

Why this answer is correct

The correct answer is B. ₹1456. Output above standard gets high rate on all units. Exam tip: calculate \(112 \times 13\).

Step 3

Exam Tip

मानक से अधिक उत्पादन पर उच्च दर पूरी इकाइयों पर लगती है। परीक्षा में \(112 \times 13\) करें।

Open Question Page
Ask Friends

मानक 100 इकाई है। श्रमिक 97 इकाई बनाता है और निम्न दर ₹9 है। मजदूरी कितनी होगी?

Standard is 100 units. A worker produces 97 units and the low rate is ₹9. What will be the wage?

Explanation opens after your attempt
Correct Answer

A. ₹873

Step 1

Concept

Output below standard gets the low rate. Exam tip: calculate \(97 \times 9 = 873\).

Step 2

Why this answer is correct

The correct answer is A. ₹873. Output below standard gets the low rate. Exam tip: calculate \(97 \times 9 = 873\).

Step 3

Exam Tip

मानक से कम उत्पादन पर निम्न दर लागू होती है। परीक्षा में \(97 \times 9 = 873\) करें।

Open Question Page
Ask Friends

यदि श्रमिक ठीक मानक के बराबर उत्पादन करता है पर नीति में मानक पर दर नहीं बताई गई तो उत्तर क्यों अधूरा होगा?

If a worker produces exactly equal to standard but the policy does not state the rate at standard why will the answer be incomplete?

Explanation opens after your attempt
Correct Answer

A. क्योंकि बराबर उत्पादन पर दर नीति जानना जरूरी हैBecause rate policy at equal output is necessary

Step 1

Concept

For output equal to standard the payment policy must be clear. Exam tip: read policy in equal cases.

Step 2

Why this answer is correct

The correct answer is A. क्योंकि बराबर उत्पादन पर दर नीति जानना जरूरी है / Because rate policy at equal output is necessary. For output equal to standard the payment policy must be clear. Exam tip: read policy in equal cases.

Step 3

Exam Tip

मानक के बराबर उत्पादन पर भुगतान नीति स्पष्ट होनी चाहिए। परीक्षा में बराबर मामले में नीति पढ़ें।

Open Question Page
Ask Friends

यदि उच्च उत्पादन के साथ श्रमिक विश्राम छोड़ देते हैं और तीसरे दिन गलती दर बढ़ती है तो कौन सा संतुलन आवश्यक है?

If workers skip rest for high output and error rate rises on the third day which balance is necessary?

Explanation opens after your attempt
Correct Answer

A. विभेदात्मक मजदूरी और थकान अध्ययनDifferential wage and fatigue study

Step 1

Concept

Human fatigue must be controlled along with incentives. Exam tip: consider both short term output and sustainable efficiency.

Step 2

Why this answer is correct

The correct answer is A. विभेदात्मक मजदूरी और थकान अध्ययन / Differential wage and fatigue study. Human fatigue must be controlled along with incentives. Exam tip: consider both short term output and sustainable efficiency.

Step 3

Exam Tip

प्रोत्साहन के साथ मानव थकान का नियंत्रण जरूरी है। परीक्षा में अल्पकालीन उत्पादन और टिकाऊ दक्षता दोनों देखें।

Open Question Page
Ask Friends

यदि कार्य केंद्र की ऊंचाई गलत है और श्रमिक जल्दी थकते हैं तो कौन सा अध्ययन सबसे उपयुक्त है?

If workstation height is wrong and workers get tired quickly which study is most suitable?

Explanation opens after your attempt
Correct Answer

B. थकान अध्ययनFatigue study

Step 1

Concept

Wrong working condition can increase fatigue. Exam tip: connect working condition and tiredness with fatigue study.

Step 2

Why this answer is correct

The correct answer is B. थकान अध्ययन / Fatigue study. Wrong working condition can increase fatigue. Exam tip: connect working condition and tiredness with fatigue study.

Step 3

Exam Tip

गलत कार्य दशा थकान बढ़ा सकती है। परीक्षा में कार्य दशा और थकान को fatigue study से जोड़ें।

Open Question Page
Ask Friends

यदि काम में waiting time घटाने के बाद प्रति इकाई समय बदल गया तो कौन सा मानक दोबारा देखना चाहिए?

If per unit time changes after reducing waiting time in work which standard should be reviewed again?

Explanation opens after your attempt
Correct Answer

A. समय मानकTime standard

Step 1

Concept

When process changes the time standard may change. Exam tip: remember the link between method change and time standard.

Step 2

Why this answer is correct

The correct answer is A. समय मानक / Time standard. When process changes the time standard may change. Exam tip: remember the link between method change and time standard.

Step 3

Exam Tip

प्रक्रिया बदलने पर समय मानक बदल सकता है। परीक्षा में विधि परिवर्तन और समय मानक का संबंध याद रखें।

Open Question Page
Ask Friends

किस विकल्प में कार्य अध्ययन की तकनीक और उसका गहरा संकेत सही है?

Which option correctly matches a work study technique with its deeper clue?

Explanation opens after your attempt
Correct Answer

A. विधि अध्ययन पूरी प्रक्रिया का सर्वोत्तम प्रवाहMethod study best flow of whole process

Step 1

Concept

Method study is linked with the best way of the whole process. Exam tip: connect process flow with method study.

Step 2

Why this answer is correct

The correct answer is A. विधि अध्ययन पूरी प्रक्रिया का सर्वोत्तम प्रवाह / Method study best flow of whole process. Method study is linked with the best way of the whole process. Exam tip: connect process flow with method study.

Step 3

Exam Tip

विधि अध्ययन पूरी प्रक्रिया के सर्वोत्तम तरीके से जुड़ा है। परीक्षा में process flow को method study से जोड़ें।

Open Question Page
Ask Friends

किस विकल्प में तकनीक और संकेत का गलत मिलान है?

Which option is an incorrect match of technique and clue?

Explanation opens after your attempt
Correct Answer

C. समय अध्ययन विश्राम अंतराल तय करनाTime study fixing rest intervals

Step 1

Concept

Rest intervals are related to fatigue study not time study. Exam tip: keep the main clue of each technique separate.

Step 2

Why this answer is correct

The correct answer is C. समय अध्ययन विश्राम अंतराल तय करना / Time study fixing rest intervals. Rest intervals are related to fatigue study not time study. Exam tip: keep the main clue of each technique separate.

Step 3

Exam Tip

विश्राम अंतराल थकान अध्ययन से संबंधित है समय अध्ययन से नहीं। परीक्षा में हर तकनीक का मुख्य संकेत अलग रखें।

Open Question Page
Ask Friends

यदि कार्यात्मक फोरमैनशिप में कई विशेषज्ञ आदेश देते हैं पर कोई प्राथमिकता तय नहीं करता तो मुख्य सीमा क्या है?

If many specialists give orders in functional foremanship but no one sets priority what is the main limitation?

Explanation opens after your attempt
Correct Answer

A. समन्वय के अभाव से भ्रमConfusion due to lack of coordination

Step 1

Concept

Coordination is necessary when instructions come from many specialists. Exam tip: compare it with unity of command.

Step 2

Why this answer is correct

The correct answer is A. समन्वय के अभाव से भ्रम / Confusion due to lack of coordination. Coordination is necessary when instructions come from many specialists. Exam tip: compare it with unity of command.

Step 3

Exam Tip

कई विशेषज्ञों से निर्देश मिलने पर समन्वय जरूरी होता है। परीक्षा में इसे आदेश की एकता से तुलना करें।

Open Question Page
Ask Friends

यदि स्पीड बॉस गुणवत्ता निर्णय लेने लगे और इंस्पेक्टर गति तय करने लगे तो सबसे उचित टिप्पणी क्या है?

If speed boss starts taking quality decisions and inspector starts fixing speed what is the most suitable comment?

Explanation opens after your attempt
Correct Answer

A. विशेषज्ञ भूमिकाओं में भ्रम हैThere is confusion in specialist roles

Step 1

Concept

Each specialist’s role should be clear in functional foremanship. Exam tip: remember role clarity.

Step 2

Why this answer is correct

The correct answer is A. विशेषज्ञ भूमिकाओं में भ्रम है / There is confusion in specialist roles. Each specialist’s role should be clear in functional foremanship. Exam tip: remember role clarity.

Step 3

Exam Tip

कार्यात्मक फोरमैनशिप में हर विशेषज्ञ की भूमिका स्पष्ट होनी चाहिए। परीक्षा में role clarity याद रखें।

Open Question Page
Ask Friends

यदि तैयार माल सही है लेकिन वास्तविक लागत मानक लागत से अधिक है तो किस विशेषज्ञ का अभिलेख विश्लेषण में मदद करेगा?

If finished goods are correct but actual cost is higher than standard cost whose records will help in analysis?

Explanation opens after your attempt
Correct Answer

B. टाइम एंड कॉस्ट क्लर्कTime and cost clerk

Step 1

Concept

Time and cost clerk keeps time and cost records. Exam tip: connect cost control with this post.

Step 2

Why this answer is correct

The correct answer is B. टाइम एंड कॉस्ट क्लर्क / Time and cost clerk. Time and cost clerk keeps time and cost records. Exam tip: connect cost control with this post.

Step 3

Exam Tip

समय और लागत का अभिलेख टाइम एंड कॉस्ट क्लर्क रखता है। परीक्षा में लागत नियंत्रण को इसी पद से जोड़ें।

Open Question Page
Ask Friends

यदि route सही है और machine सही है पर written instruction पुराने product variant के लिए है तो किस समन्वय की कमी है?

If route and machine are correct but written instruction is for an old product variant what coordination is missing?

Explanation opens after your attempt
Correct Answer

A. रूट क्लर्क और इंस्ट्रक्शन कार्ड क्लर्क का समन्वयCoordination between route clerk and instruction card clerk

Step 1

Concept

Route and written instructions are linked with planning side. Exam tip: identify planning side coordination.

Step 2

Why this answer is correct

The correct answer is A. रूट क्लर्क और इंस्ट्रक्शन कार्ड क्लर्क का समन्वय / Coordination between route clerk and instruction card clerk. Route and written instructions are linked with planning side. Exam tip: identify planning side coordination.

Step 3

Exam Tip

मार्ग और लिखित निर्देश दोनों योजना पक्ष से जुड़े हैं। परीक्षा में planning side coordination पहचानें।

Open Question Page
Ask Friends

एक श्रमिक 126 इकाई बनाता है। मानक 120 इकाई है। उच्च दर ₹5 है और 3 इकाई अस्वीकृत हैं। यदि भुगतान कुल उत्पादन पर है तो मजदूरी कितनी होगी?

A worker produces 126 units. Standard is 120 units. High rate is ₹5 and 3 units are rejected. If payment is on gross output what will be the wage?

Explanation opens after your attempt
Correct Answer

C. ₹630

Step 1

Concept

Payment is on gross output so high rate applies to 126 units. Exam tip: read payment basis carefully.

Step 2

Why this answer is correct

The correct answer is C. ₹630. Payment is on gross output so high rate applies to 126 units. Exam tip: read payment basis carefully.

Step 3

Exam Tip

कुल उत्पादन पर भुगतान है इसलिए 126 इकाइयों पर उच्च दर लगेगी। परीक्षा में भुगतान आधार को ध्यान से पढ़ें।

Open Question Page
Ask Friends

एक श्रमिक 126 इकाई बनाता है। मानक 120 इकाई है। उच्च दर ₹5 है और 3 इकाई अस्वीकृत हैं। यदि भुगतान स्वीकृत उत्पादन पर है तो मजदूरी कितनी होगी?

A worker produces 126 units. Standard is 120 units. High rate is ₹5 and 3 units are rejected. If payment is on accepted output what will be the wage?

Explanation opens after your attempt
Correct Answer

B. ₹615

Step 1

Concept

Accepted output is (126 - 3 = 123) units so wage is ₹615. Exam tip: deduct rejected units.

Step 2

Why this answer is correct

The correct answer is B. ₹615. Accepted output is (126 - 3 = 123) units so wage is ₹615. Exam tip: deduct rejected units.

Step 3

Exam Tip

स्वीकृत उत्पादन 123 इकाई है इसलिए मजदूरी 615 रुपये होगी। परीक्षा में अस्वीकृत इकाइयां घटाएं।

Open Question Page
Ask Friends

यदि समान गुणवत्ता मानक हैं लेकिन 22 प्रकार की छोटी छोटी पैकिंग अभी भी चल रही है तो किस तकनीक की जरूरत है?

If uniform quality standards exist but 22 small packing varieties are still used which technique is needed?

Explanation opens after your attempt
Correct Answer

B. सरलीकरणSimplification

Step 1

Concept

Quality standard is standardisation but reducing unnecessary packing varieties is simplification. Exam tip: read standards and variety separately.

Step 2

Why this answer is correct

The correct answer is B. सरलीकरण / Simplification. Quality standard is standardisation but reducing unnecessary packing varieties is simplification. Exam tip: read standards and variety separately.

Step 3

Exam Tip

गुणवत्ता मानक मानकीकरण है पर अनावश्यक पैकिंग किस्में घटाना सरलीकरण है। परीक्षा में standards और variety अलग पढ़ें।

Open Question Page
Ask Friends

यदि product variety कम है लेकिन हर lot का वजन अलग है तो किस तकनीक का पालन कमजोर है?

If product variety is low but weight differs in every lot which technique is weak?

Explanation opens after your attempt
Correct Answer

A. मानकीकरणStandardisation

Step 1

Concept

Uniform weight is linked with standardisation. Exam tip: connect measurement variation with standardisation.

Step 2

Why this answer is correct

The correct answer is A. मानकीकरण / Standardisation. Uniform weight is linked with standardisation. Exam tip: connect measurement variation with standardisation.

Step 3

Exam Tip

वजन की समानता मानकीकरण से जुड़ी है। परीक्षा में measurement variation को standardisation से जोड़ें।

Open Question Page
Ask Friends

एक कार्य में 780 मिनट उपलब्ध हैं और प्रति इकाई 13 मिनट लगते हैं। मानक उत्पादन कितना होगा?

A task has 780 minutes available and takes 13 minutes per unit. What will be standard output?

Explanation opens after your attempt
Correct Answer

C. 60 इकाई60 units

Step 1

Concept

Standard output will be \(780 \div 13 = 60\) units. Exam tip: divide available time by time per unit.

Step 2

Why this answer is correct

The correct answer is C. 60 इकाई / 60 units. Standard output will be \(780 \div 13 = 60\) units. Exam tip: divide available time by time per unit.

Step 3

Exam Tip

मानक उत्पादन 60 इकाई होगा। परीक्षा में उपलब्ध समय को प्रति इकाई समय से भाग दें।

Open Question Page
Ask Friends

कुल 540 मिनट में 45 मिनट आवश्यक विश्राम है और प्रति इकाई समय 9 मिनट है। मानक उत्पादन कितना होगा?

Total time is 540 minutes including 45 minutes necessary rest and time per unit is 9 minutes. What will be standard output?

Explanation opens after your attempt
Correct Answer

B. 55 इकाई55 units

Step 1

Concept

Working time is 495 minutes and 55 units will be produced. Exam tip: deduct rest first.

Step 2

Why this answer is correct

The correct answer is B. 55 इकाई / 55 units. Working time is 495 minutes and 55 units will be produced. Exam tip: deduct rest first.

Step 3

Exam Tip

कार्य समय 495 मिनट है और 55 इकाई बनेंगी। परीक्षा में पहले विश्राम घटाएं।

Open Question Page
Ask Friends

यदि time study में केवल बहुत तेज श्रमिक पर मापन किया गया तो कौन सी समस्या हो सकती है?

If time study is based only on a very fast worker what problem may occur?

Explanation opens after your attempt
Correct Answer

A. मानक अव्यावहारिक रूप से कठोर हो सकता हैStandard may become impractically strict

Step 1

Concept

A very fast worker may not be a normal representative. Exam tip: remember the importance of representative worker.

Step 2

Why this answer is correct

The correct answer is A. मानक अव्यावहारिक रूप से कठोर हो सकता है / Standard may become impractically strict. A very fast worker may not be a normal representative. Exam tip: remember the importance of representative worker.

Step 3

Exam Tip

बहुत तेज श्रमिक सामान्य प्रतिनिधि नहीं हो सकता। परीक्षा में representative worker का महत्व याद रखें।

Open Question Page
Ask Friends

यदि work method बदलकर per unit time 16 मिनट से 11 मिनट हो गया तो पुराना समय मानक क्यों गलत हो सकता है?

If work method changes and per unit time falls from 16 minutes to 11 minutes why may the old time standard be wrong?

Explanation opens after your attempt
Correct Answer

A. क्योंकि विधि बदलने से समय बदलता हैBecause time changes when method changes

Step 1

Concept

Change in work method affects time standard. Exam tip: remember method change means standard review.

Step 2

Why this answer is correct

The correct answer is A. क्योंकि विधि बदलने से समय बदलता है / Because time changes when method changes. Change in work method affects time standard. Exam tip: remember method change means standard review.

Step 3

Exam Tip

कार्य विधि में बदलाव समय मानक को प्रभावित करता है। परीक्षा में method change means standard review याद रखें।

Open Question Page
Ask Friends

यदि श्रमिक standard output से ऊपर हैं पर fatigue के कारण अगले दिन absenteeism बढ़ती है तो कौन सा निष्कर्ष सही है?

If workers are above standard output but absenteeism rises next day due to fatigue which conclusion is correct?

Explanation opens after your attempt
Correct Answer

A. output target टिकाऊ नहीं हो सकताOutput target may not be sustainable

Step 1

Concept

Efficiency should be sustainable and fatigue must be considered. Exam tip: check high output and fatigue balance.

Step 2

Why this answer is correct

The correct answer is A. output target टिकाऊ नहीं हो सकता / Output target may not be sustainable. Efficiency should be sustainable and fatigue must be considered. Exam tip: check high output and fatigue balance.

Step 3

Exam Tip

दक्षता टिकाऊ होनी चाहिए और थकान को ध्यान में रखना चाहिए। परीक्षा में high output और fatigue balance देखें।

Open Question Page
Ask Friends

यदि कार्यस्थल पर प्रकाश सही है लेकिन बैठने की ऊंचाई गलत होने से कंधे में दर्द है तो कौन सा अध्ययन उपयोगी है?

If lighting is proper but wrong seating height causes shoulder pain which study is useful?

Explanation opens after your attempt
Correct Answer

A. थकान अध्ययनFatigue study

Step 1

Concept

Seating height is a working condition that can increase fatigue and pain. Exam tip: connect ergonomic issue with fatigue study.

Step 2

Why this answer is correct

The correct answer is A. थकान अध्ययन / Fatigue study. Seating height is a working condition that can increase fatigue and pain. Exam tip: connect ergonomic issue with fatigue study.

Step 3

Exam Tip

बैठने की ऊंचाई कार्य दशा है जो थकान और दर्द बढ़ा सकती है। परीक्षा में ergonomic issue को fatigue study से जोड़ें।

Open Question Page
Ask Friends

यदि process flow छोटा हुआ लेकिन श्रमिक को अधिक वजन उठाना पड़ता है तो कौन सा संयुक्त अध्ययन चाहिए?

If process flow becomes shorter but workers have to lift heavier loads which combined study is needed?

Explanation opens after your attempt
Correct Answer

A. विधि अध्ययन और थकान अध्ययनMethod study and fatigue study

Step 1

Concept

Flow improvement is method study but load may affect fatigue. Exam tip: check both process and human fatigue.

Step 2

Why this answer is correct

The correct answer is A. विधि अध्ययन और थकान अध्ययन / Method study and fatigue study. Flow improvement is method study but load may affect fatigue. Exam tip: check both process and human fatigue.

Step 3

Exam Tip

प्रवाह सुधार विधि अध्ययन है लेकिन वजन थकान को प्रभावित कर सकता है। परीक्षा में प्रक्रिया और मानव थकान दोनों देखें।

Open Question Page
Ask Friends

यदि walking distance घटाकर श्रमिक को कम चलना पड़ता है और फिर daily target बदला जाता है तो कौन सी interaction है?

If walking distance is reduced and then daily target is changed what interaction is shown?

Explanation opens after your attempt
Correct Answer

A. गति अध्ययन से समय अध्ययन प्रभावित हुआMotion study affected time study

Step 1

Concept

Reducing unnecessary motion can change time and target. Exam tip: identify interaction among techniques.

Step 2

Why this answer is correct

The correct answer is A. गति अध्ययन से समय अध्ययन प्रभावित हुआ / Motion study affected time study. Reducing unnecessary motion can change time and target. Exam tip: identify interaction among techniques.

Step 3

Exam Tip

अनावश्यक गति घटने से समय और लक्ष्य बदल सकते हैं। परीक्षा में technique interaction पहचानें।

Open Question Page
Ask Friends

यदि workers को high rate पाने का लक्ष्य दिया गया लेकिन सही method training नहीं दी गई तो क्या कमी है?

If workers are given a target to get high rate but not trained in the correct method what is missing?

Explanation opens after your attempt
Correct Answer

A. लक्ष्य और क्षमता का मेलMatch between target and capability

Step 1

Concept

Incentive is useful when workers know the correct method. Exam tip: check training with wage incentive.

Step 2

Why this answer is correct

The correct answer is A. लक्ष्य और क्षमता का मेल / Match between target and capability. Incentive is useful when workers know the correct method. Exam tip: check training with wage incentive.

Step 3

Exam Tip

प्रोत्साहन तभी उपयोगी है जब श्रमिक सही विधि जानते हों। परीक्षा में wage incentive के साथ training देखें।

Open Question Page
Ask Friends

यदि मानक औजार हैं पर श्रमिकों को अलग अलग grade का material मिलता है तो निष्पक्ष तुलना क्यों कमजोर होगी?

If tools are standard but workers receive different grade material why will fair comparison become weak?

Explanation opens after your attempt
Correct Answer

A. क्योंकि input conditions समान नहीं हैंBecause input conditions are not equal

Step 1

Concept

Performance comparison is not fair without equal conditions. Exam tip: connect material standard with fairness.

Step 2

Why this answer is correct

The correct answer is A. क्योंकि input conditions समान नहीं हैं / Because input conditions are not equal. Performance comparison is not fair without equal conditions. Exam tip: connect material standard with fairness.

Step 3

Exam Tip

समान परिस्थितियों के बिना प्रदर्शन तुलना निष्पक्ष नहीं होती। परीक्षा में material standard को fairness से जोड़ें।

Open Question Page
Ask Friends

यदि हर batch का रंग समान है लेकिन आकार अलग अलग है तो मानकीकरण का कौन सा पक्ष अधूरा है?

If colour of every batch is same but size differs what aspect of standardisation is incomplete?

Explanation opens after your attempt
Correct Answer

A. आकार मानकSize standard

Step 1

Concept

Uniform size can also be part of standardisation. Exam tip: connect size variation with standardisation.

Step 2

Why this answer is correct

The correct answer is A. आकार मानक / Size standard. Uniform size can also be part of standardisation. Exam tip: connect size variation with standardisation.

Step 3

Exam Tip

समान आकार भी मानकीकरण का हिस्सा हो सकता है। परीक्षा में size variation को standardisation से जोड़ें।

Open Question Page
Ask Friends

यदि एक ही समय में product variety घटाई गई और बाकी product की uniform quality तय की गई तो कौन सा संयुक्त प्रयोग है?

If product variety is reduced and uniform quality of remaining products is fixed at the same time what combined application is this?

Explanation opens after your attempt
Correct Answer

A. सरलीकरण और मानकीकरणSimplification and standardisation

Step 1

Concept

Reducing varieties is simplification and fixing quality is standardisation. Exam tip: catch both clues together.

Step 2

Why this answer is correct

The correct answer is A. सरलीकरण और मानकीकरण / Simplification and standardisation. Reducing varieties is simplification and fixing quality is standardisation. Exam tip: catch both clues together.

Step 3

Exam Tip

किस्में घटाना सरलीकरण है और गुणवत्ता तय करना मानकीकरण है। परीक्षा में दो संकेतों को साथ पकड़ें।

Open Question Page
Ask Friends

किस स्थिति में केवल motion study पर्याप्त नहीं होगी?

In which situation will only motion study not be enough?

Explanation opens after your attempt
Correct Answer

A. बेकार हाथ गति के साथ पूरी प्रक्रिया भी गलत हैUseless hand movement exists and the whole process is also wrong

Step 1

Concept

If the whole process is wrong method study is also needed. Exam tip: separate movement problem and process problem.

Step 2

Why this answer is correct

The correct answer is A. बेकार हाथ गति के साथ पूरी प्रक्रिया भी गलत है / Useless hand movement exists and the whole process is also wrong. If the whole process is wrong method study is also needed. Exam tip: separate movement problem and process problem.

Step 3

Exam Tip

पूरी प्रक्रिया गलत हो तो विधि अध्ययन भी चाहिए। परीक्षा में movement problem और process problem अलग करें।

Open Question Page
Ask Friends

यदि work study के बाद standard output बढ़ा लेकिन rest intervals revise नहीं हुए तो कौन सा जोखिम है?

If standard output increased after work study but rest intervals were not revised what is the risk?

Explanation opens after your attempt
Correct Answer

A. थकान और त्रुटि बढ़ सकती हैFatigue and errors may increase

Step 1

Concept

Fatigue balance is needed with new targets. Exam tip: see work study and fatigue together.

Step 2

Why this answer is correct

The correct answer is A. थकान और त्रुटि बढ़ सकती है / Fatigue and errors may increase. Fatigue balance is needed with new targets. Exam tip: see work study and fatigue together.

Step 3

Exam Tip

नए लक्ष्य के साथ थकान संतुलन भी जरूरी है। परीक्षा में work study और fatigue को साथ देखें।

Open Question Page
Ask Friends

यदि actual time अधिक है लेकिन quality भी बेहतर है तो केवल time record देखकर निर्णय क्यों गलत हो सकता है?

If actual time is higher but quality is also better why may a decision based only on time record be wrong?

Explanation opens after your attempt
Correct Answer

A. क्योंकि गुणवत्ता परिणाम भी देखना चाहिएBecause quality result should also be checked

Step 1

Concept

Time and quality both may matter in performance evaluation. Exam tip: do not depend on a single measure.

Step 2

Why this answer is correct

The correct answer is A. क्योंकि गुणवत्ता परिणाम भी देखना चाहिए / Because quality result should also be checked. Time and quality both may matter in performance evaluation. Exam tip: do not depend on a single measure.

Step 3

Exam Tip

समय और गुणवत्ता दोनों प्रदर्शन मूल्यांकन में महत्वपूर्ण हो सकते हैं। परीक्षा में single measure पर निर्भर न रहें।

Open Question Page
Ask Friends

यदि रूट क्लर्क सही मार्ग देता है लेकिन instruction card में पुराना route छपा है तो कौन सी समस्या है?

If route clerk gives the correct route but the old route is printed on the instruction card what is the problem?

Explanation opens after your attempt
Correct Answer

A. योजना पक्ष में सूचना समन्वय की कमीLack of information coordination in planning side

Step 1

Concept

The correct route must be updated in written instructions. Exam tip: remember planning records coordination.

Step 2

Why this answer is correct

The correct answer is A. योजना पक्ष में सूचना समन्वय की कमी / Lack of information coordination in planning side. The correct route must be updated in written instructions. Exam tip: remember planning records coordination.

Step 3

Exam Tip

सही route को लिखित निर्देश में अपडेट करना जरूरी है। परीक्षा में planning records coordination याद रखें।

Open Question Page
Ask Friends

यदि higher output के कारण high rate मिलती है लेकिन rejected output भी बढ़ता है तो wage policy में कौन सा आधार स्पष्ट होना चाहिए?

If higher output gives high rate but rejected output also increases what basis must be clear in wage policy?

Explanation opens after your attempt
Correct Answer

A. कुल उत्पादन या स्वीकृत उत्पादनGross output or accepted output

Step 1

Concept

The effect of quality rejection on wage must be clear. Exam tip: read gross and accepted output separately.

Step 2

Why this answer is correct

The correct answer is A. कुल उत्पादन या स्वीकृत उत्पादन / Gross output or accepted output. The effect of quality rejection on wage must be clear. Exam tip: read gross and accepted output separately.

Step 3

Exam Tip

गुणवत्ता अस्वीकृति का असर मजदूरी पर कैसे होगा यह स्पष्ट होना चाहिए। परीक्षा में gross और accepted output अलग पढ़ें।

Open Question Page
Ask Friends

यदि product mix बदलने के बाद भी पुराना time standard लागू है तो कौन सी समस्या होगी?

If old time standard is still applied after product mix changes what problem will occur?

Explanation opens after your attempt
Correct Answer

A. मानक अप्रासंगिक हो सकता हैStandard may become irrelevant

Step 1

Concept

When product mix changes method and time may change. Exam tip: remember major change means standard review.

Step 2

Why this answer is correct

The correct answer is A. मानक अप्रासंगिक हो सकता है / Standard may become irrelevant. When product mix changes method and time may change. Exam tip: remember major change means standard review.

Step 3

Exam Tip

product mix बदलने पर विधि और समय बदल सकते हैं। परीक्षा में major change means standard review याद रखें।

Open Question Page
Ask Friends

यदि workers trained हैं लेकिन new standard tool की manual पुरानी है तो कौन सा implementation gap है?

If workers are trained but the manual for the new standard tool is old what implementation gap exists?

Explanation opens after your attempt
Correct Answer

A. standardisation और training document का mismatchMismatch between standardisation and training document

Step 1

Concept

When standard tools change training documents should also be updated. Exam tip: do not ignore follow up.

Step 2

Why this answer is correct

The correct answer is A. standardisation और training document का mismatch / Mismatch between standardisation and training document. When standard tools change training documents should also be updated. Exam tip: do not ignore follow up.

Step 3

Exam Tip

मानक उपकरण बदलें तो training documents भी update होने चाहिए। परीक्षा में follow up को नजरअंदाज न करें।

Open Question Page
Ask Friends

यदि route speed quality सब सही हैं लेकिन बहुत अधिक variants से storage cost बढ़ रही है तो कौन सी तकनीक सर्वोत्तम है?

If route speed and quality are all correct but too many variants increase storage cost which technique is best?

Explanation opens after your attempt
Correct Answer

A. सरलीकरणSimplification

Step 1

Concept

Too many variants may increase storage cost so simplification is suitable. Exam tip: connect high variety cost with simplification.

Step 2

Why this answer is correct

The correct answer is A. सरलीकरण / Simplification. Too many variants may increase storage cost so simplification is suitable. Exam tip: connect high variety cost with simplification.

Step 3

Exam Tip

बहुत अधिक variants storage cost बढ़ा सकते हैं इसलिए सरलीकरण उचित है। परीक्षा में high variety cost को simplification से जोड़ें।

Open Question Page
Ask Friends

किस स्थिति में speed boss और repair boss के अंतर को समझना जरूरी है?

In which situation is it necessary to understand the difference between speed boss and repair boss?

Explanation opens after your attempt
Correct Answer

A. machine ठीक है पर workers धीमे हैंMachine is proper but workers are slow

Step 1

Concept

Slow work speed is linked with speed boss while machine breakdown is linked with repair boss. Exam tip: choose role by cause.

Step 2

Why this answer is correct

The correct answer is A. machine ठीक है पर workers धीमे हैं / Machine is proper but workers are slow. Slow work speed is linked with speed boss while machine breakdown is linked with repair boss. Exam tip: choose role by cause.

Step 3

Exam Tip

धीमी कार्य गति speed boss से जुड़ी है जबकि मशीन खराबी repair boss से। परीक्षा में cause देखकर role चुनें।

Open Question Page
Ask Friends

किस स्थिति में inspector और repair boss दोनों की भूमिका अलग अलग जरूरी होगी?

In which situation will roles of inspector and repair boss both be separately needed?

Explanation opens after your attempt
Correct Answer

A. machine खराबी से दोष बनते हैं और finished goods check भी चाहिएDefects arise from machine breakdown and finished goods also need checking

Step 1

Concept

Repair boss corrects the cause and inspector checks the result. Exam tip: separate cause correction and output checking.

Step 2

Why this answer is correct

The correct answer is A. machine खराबी से दोष बनते हैं और finished goods check भी चाहिए / Defects arise from machine breakdown and finished goods also need checking. Repair boss corrects the cause and inspector checks the result. Exam tip: separate cause correction and output checking.

Step 3

Exam Tip

repair boss कारण सुधारता है और inspector परिणाम जांचता है। परीक्षा में cause correction और output checking अलग रखें।

Open Question Page
Ask Friends

यदि work method बदली गई और workers की unnecessary bending कम हुई लेकिन time standard नहीं बदला गया तो क्या कमी है?

If work method changed and unnecessary bending reduced but time standard was not changed what is missing?

Explanation opens after your attempt
Correct Answer

A. नई दक्षता के अनुसार समय मानक समीक्षाTime standard review according to new efficiency

Step 1

Concept

Reduced motions may change time so standard review is needed. Exam tip: connect motion effect with time standard.

Step 2

Why this answer is correct

The correct answer is A. नई दक्षता के अनुसार समय मानक समीक्षा / Time standard review according to new efficiency. Reduced motions may change time so standard review is needed. Exam tip: connect motion effect with time standard.

Step 3

Exam Tip

हरकतें घटने से समय बदल सकता है इसलिए मानक समीक्षा चाहिए। परीक्षा में motion effect और time standard को जोड़ें।

Open Question Page
Ask Friends

एक case में material flow सुधरा hand movement घटी standard output बदला rest plan बना और quality basis wage में जोड़ा गया। यह क्या दिखाता है?

In a case material flow improved hand movement reduced standard output changed rest plan was made and quality basis was added to wage. What does this show?

Explanation opens after your attempt
Correct Answer

A. वैज्ञानिक प्रबंधन तकनीकों का समन्वित प्रयोगIntegrated use of scientific management techniques

Step 1

Concept

This shows combined clues of method motion time fatigue and wage control. Exam tip: combine multiple clues.

Step 2

Why this answer is correct

The correct answer is A. वैज्ञानिक प्रबंधन तकनीकों का समन्वित प्रयोग / Integrated use of scientific management techniques. This shows combined clues of method motion time fatigue and wage control. Exam tip: combine multiple clues.

Step 3

Exam Tip

यह विधि गति समय थकान और मजदूरी नियंत्रण के संयुक्त संकेत देता है। परीक्षा में multiple clues combine करें।

Open Question Page
Ask Friends
FAQs

Class 12 Business Studies Quiz FAQs

How many questions are in this quiz?

This level is designed for 50 active questions. Currently 50 questions are available for the selected class and difficulty.

Is there a timer in this quiz?

Yes, the timer uses 30 seconds per question for Hard difficulty and shows the total remaining time on the page.

Can I open each question separately?

Yes, every question has its own SEO-friendly page with answer, explanation and related practice links.