Class 12 Business Studies Expert Quiz

Level 44 • 50/50 questions • 25 seconds per question.

Level readiness 50/50 Questions
Time Left 20:50 25 sec/question
RewardsCoins + XP
ModeClassic Quiz
Share
Question 1 / 50 0 score
Answered 0/50 Correct 0 Time 20:50

यदि सर्वोत्तम विधि तय होने के बाद workers को पुराना instruction card दिया गया और output घट गया तो सबसे सही diagnosis क्या है?

If workers receive an old instruction card after the best method is fixed and output falls what is the most correct diagnosis?

Explanation opens after your attempt
Correct Answer

B. Instruction update और planning communication कमजोर हैInstruction update and planning communication are weak

Step 1

Concept

A new method works only when written instructions are updated too. Exam tip: check coordination between method output and instruction card.

Step 2

Why this answer is correct

The correct answer is B. Instruction update और planning communication कमजोर है / Instruction update and planning communication are weak. A new method works only when written instructions are updated too. Exam tip: check coordination between method output and instruction card.

Step 3

Exam Tip

नई विधि तभी सफल है जब लिखित निर्देश भी update हों। परीक्षा में method output और instruction card coordination देखें।

Open Question Page
Ask Friends

एक उत्पादन लाइन में route सही है material ready है लेकिन workers start delay करते हैं क्योंकि fixture गलत size का है। किस role और technique की कमी दिखती है?

In a production line route is correct and material is ready but workers delay start because the fixture is of wrong size. Which role and technique weakness is shown?

Explanation opens after your attempt
Correct Answer

A. Gang boss और standardisationGang boss and standardisation

Step 1

Concept

Start resources are linked with gang boss and fixture size standard with standardisation. Exam tip: catch both setup and standard clues.

Step 2

Why this answer is correct

The correct answer is A. Gang boss और standardisation / Gang boss and standardisation. Start resources are linked with gang boss and fixture size standard with standardisation. Exam tip: catch both setup and standard clues.

Step 3

Exam Tip

Start resources gang boss से जुड़े हैं और fixture size का standard मानकीकरण से जुड़ा है। परीक्षा में setup और standard दोनों संकेत पकड़ें।

Open Question Page
Ask Friends

यदि machine ठीक है लेकिन speed boss ने speed बढ़ाई और rejection rate बढ़ गया तो कौन सा संयुक्त नियंत्रण जरूरी है?

If the machine is fine but the speed boss increases speed and rejection rate rises which combined control is necessary?

Explanation opens after your attempt
Correct Answer

A. Speed control और inspection standardSpeed control and inspection standard

Step 1

Concept

Quality standards and inspection should be checked with speed increase. Exam tip: read speed and quality together.

Step 2

Why this answer is correct

The correct answer is A. Speed control और inspection standard / Speed control and inspection standard. Quality standards and inspection should be checked with speed increase. Exam tip: read speed and quality together.

Step 3

Exam Tip

गति बढ़ाने के साथ quality standard और inspection भी देखना चाहिए। परीक्षा में speed और quality को साथ पढ़ें।

Open Question Page
Ask Friends

यदि final product defect का कारण worn cutting tool है तो inspector के बाद root correction किससे जुड़ा है?

If a final product defect is caused by a worn cutting tool root correction after inspector is linked with whom?

Explanation opens after your attempt
Correct Answer

B. Repair boss

Step 1

Concept

Correcting a worn tool is related to repair boss. Exam tip: separate detection from root correction.

Step 2

Why this answer is correct

The correct answer is B. Repair boss. Correcting a worn tool is related to repair boss. Exam tip: separate detection from root correction.

Step 3

Exam Tip

Worn tool को सुधारना repair boss से संबंधित है। परीक्षा में detection और root correction अलग रखें।

Open Question Page
Ask Friends

कुल 960 मिनट में 120 मिनट आवश्यक विश्राम है और प्रति इकाई समय 14 मिनट है। सही standard output कितना होगा?

Total time is 960 minutes including 120 minutes necessary rest and time per unit is 14 minutes. What is the correct standard output?

Explanation opens after your attempt
Correct Answer

B. 60 इकाई60 units

Step 1

Concept

Working time is (960 - 120 = 840) minutes so output is \(840 \div 14 = 60\) units. Exam tip: deduct rest to get available time.

Step 2

Why this answer is correct

The correct answer is B. 60 इकाई / 60 units. Working time is (960 - 120 = 840) minutes so output is \(840 \div 14 = 60\) units. Exam tip: deduct rest to get available time.

Step 3

Exam Tip

कार्य समय 840 मिनट है इसलिए output 60 इकाई होगा। परीक्षा में rest घटाकर available time लें।

Open Question Page
Ask Friends

एक श्रमिक 156 इकाई बनाता है। मानक 150 है और high rate ₹9 है। Gross output पर wage कितनी होगी?

A worker produces 156 units. Standard is 150 and high rate is ₹9. What will be wage on gross output?

Explanation opens after your attempt
Correct Answer

C. ₹1404

Step 1

Concept

Output above standard gets high rate on gross output. Exam tip: calculate \(156 \times 9 = 1404\).

Step 2

Why this answer is correct

The correct answer is C. ₹1404. Output above standard gets high rate on gross output. Exam tip: calculate \(156 \times 9 = 1404\).

Step 3

Exam Tip

मानक से ऊपर output पर high rate gross output पर लगती है। परीक्षा में \(156 \times 9 = 1404\) करें।

Open Question Page
Ask Friends

एक श्रमिक 156 इकाई बनाता है। मानक 150 है और high rate ₹9 है। 8 इकाई reject हैं। Accepted output पर wage कितनी होगी?

A worker produces 156 units. Standard is 150 and high rate is ₹9. 8 units are rejected. What will be wage on accepted output?

Explanation opens after your attempt
Correct Answer

A. ₹1332

Step 1

Concept

Accepted output is (156 - 8 = 148) units so wage is ₹1332. Exam tip: deduct rejected units.

Step 2

Why this answer is correct

The correct answer is A. ₹1332. Accepted output is (156 - 8 = 148) units so wage is ₹1332. Exam tip: deduct rejected units.

Step 3

Exam Tip

Accepted output 148 इकाई है इसलिए wage 1332 रुपये होगी। परीक्षा में rejected units घटाएं।

Open Question Page
Ask Friends

मानक 128 इकाई है। श्रमिक 124 इकाई बनाता है और low rate ₹12 है। wage कितनी होगी?

Standard is 128 units. A worker produces 124 units and low rate is ₹12. What will be the wage?

Explanation opens after your attempt
Correct Answer

B. ₹1488

Step 1

Concept

Output below standard gets the low rate. Exam tip: calculate \(124 \times 12 = 1488\).

Step 2

Why this answer is correct

The correct answer is B. ₹1488. Output below standard gets the low rate. Exam tip: calculate \(124 \times 12 = 1488\).

Step 3

Exam Tip

मानक से कम output पर low rate लगती है। परीक्षा में \(124 \times 12 = 1488\) करें।

Open Question Page
Ask Friends

यदि समान method और tools हैं लेकिन humidity-sensitive material हर batch में अलग है तो कौन सा expert conclusion सही है?

If method and tools are uniform but humidity sensitive material differs in every batch what expert conclusion is correct?

Explanation opens after your attempt
Correct Answer

A. Input standardisation कमजोर हैInput standardisation is weak

Step 1

Concept

Input conditions must also be standard for fair performance comparison. Exam tip: connect raw material variability with standardisation.

Step 2

Why this answer is correct

The correct answer is A. Input standardisation कमजोर है / Input standardisation is weak. Input conditions must also be standard for fair performance comparison. Exam tip: connect raw material variability with standardisation.

Step 3

Exam Tip

निष्पक्ष performance comparison के लिए input conditions भी standard होनी चाहिए। परीक्षा में raw material variability को standardisation से जोड़ें।

Open Question Page
Ask Friends

कंपनी ने 36 variants घटाकर 10 किए लेकिन दो high demand variants हट गए। सरलीकरण में मुख्य expert error क्या है?

A company reduced 36 variants to 10 but removed two high demand variants. What is the main expert error in simplification?

Explanation opens after your attempt
Correct Answer

A. Demand analysis के बिना variety reductionVariety reduction without demand analysis

Step 1

Concept

Simplification reduces unnecessary variants not essential demand. Exam tip: remember demand based simplification.

Step 2

Why this answer is correct

The correct answer is A. Demand analysis के बिना variety reduction / Variety reduction without demand analysis. Simplification reduces unnecessary variants not essential demand. Exam tip: remember demand based simplification.

Step 3

Exam Tip

सरलीकरण अनावश्यक variants घटाता है जरूरी demand नहीं। परीक्षा में demand based simplification याद रखें।

Open Question Page
Ask Friends

यदि product variants कम हैं लेकिन हर carton का net weight अलग है तो कौन सा standard अधूरा है?

If product variants are few but each carton has different net weight which standard is incomplete?

Explanation opens after your attempt
Correct Answer

B. Weight and measurement standard

Step 1

Concept

Uniform weight and measurement are linked with standardisation. Exam tip: do not treat low variety as complete standardisation.

Step 2

Why this answer is correct

The correct answer is B. Weight and measurement standard. Uniform weight and measurement are linked with standardisation. Exam tip: do not treat low variety as complete standardisation.

Step 3

Exam Tip

समान वजन और माप standardisation से जुड़े हैं। परीक्षा में variety कम होने को standardisation पूरा न मानें।

Open Question Page
Ask Friends

यदि workers की finger motion घट गई लेकिन material अभी भी unnecessary loop में जाता है तो कौन सा study बाकी है?

If workers’ finger motion is reduced but material still follows an unnecessary loop which study remains?

Explanation opens after your attempt
Correct Answer

B. Method study

Step 1

Concept

Finger motion is motion study but material loop is a process issue. Exam tip: distinguish micro movement from process flow.

Step 2

Why this answer is correct

The correct answer is B. Method study. Finger motion is motion study but material loop is a process issue. Exam tip: distinguish micro movement from process flow.

Step 3

Exam Tip

Finger motion motion study है लेकिन material loop process issue है। परीक्षा में micro movement और process flow अलग करें।

Open Question Page
Ask Friends

यदि layout से walking distance घटा पर workers को ज्यादा twisting करनी पड़ती है तो कौन सा combined review चाहिए?

If layout reduces walking distance but workers must twist more which combined review is needed?

Explanation opens after your attempt
Correct Answer

A. Motion study और fatigue studyMotion study and fatigue study

Step 1

Concept

Reduced walking is motion improvement but twisting may increase fatigue. Exam tip: check both efficiency and human strain.

Step 2

Why this answer is correct

The correct answer is A. Motion study और fatigue study / Motion study and fatigue study. Reduced walking is motion improvement but twisting may increase fatigue. Exam tip: check both efficiency and human strain.

Step 3

Exam Tip

Walking कम होना motion improvement है लेकिन twisting fatigue बढ़ा सकती है। परीक्षा में efficiency और human strain दोनों देखें।

Open Question Page
Ask Friends

यदि process route छोटा हुआ लेकिन heavy lifting से next day absenteeism बढ़ी तो best conclusion क्या है?

If process route becomes shorter but heavy lifting increases next day absenteeism what is the best conclusion?

Explanation opens after your attempt
Correct Answer

A. Method improvement को fatigue effect से validate करना चाहिएMethod improvement should be validated with fatigue effect

Step 1

Concept

Human sustainability is necessary with process efficiency. Exam tip: identify method and fatigue interaction.

Step 2

Why this answer is correct

The correct answer is A. Method improvement को fatigue effect से validate करना चाहिए / Method improvement should be validated with fatigue effect. Human sustainability is necessary with process efficiency. Exam tip: identify method and fatigue interaction.

Step 3

Exam Tip

Process efficiency के साथ human sustainability भी जरूरी है। परीक्षा में method और fatigue interaction पहचानें।

Open Question Page
Ask Friends

यदि time study only fastest worker पर आधारित है और normal workers fail होते हैं तो root weakness क्या है?

If time study is based only on the fastest worker and normal workers fail what is the root weakness?

Explanation opens after your attempt
Correct Answer

A. Representative worker selection गलत हैRepresentative worker selection is wrong

Step 1

Concept

The fastest worker may not be a normal representative. Exam tip: representative worker is a key condition in time study.

Step 2

Why this answer is correct

The correct answer is A. Representative worker selection गलत है / Representative worker selection is wrong. The fastest worker may not be a normal representative. Exam tip: representative worker is a key condition in time study.

Step 3

Exam Tip

बहुत तेज worker normal representative नहीं हो सकता। परीक्षा में representative worker time study की key condition है।

Open Question Page
Ask Friends

यदि time study only slowest worker पर आधारित है और target बहुत easy हो गया है तो क्या problem है?

If time study is based only on the slowest worker and target becomes too easy what is the problem?

Explanation opens after your attempt
Correct Answer

A. Standard too loose हो गयाStandard became too loose

Step 1

Concept

A very slow worker is also not representative. Exam tip: use an average capable worker as basis.

Step 2

Why this answer is correct

The correct answer is A. Standard too loose हो गया / Standard became too loose. A very slow worker is also not representative. Exam tip: use an average capable worker as basis.

Step 3

Exam Tip

बहुत slow worker भी representative नहीं होता। परीक्षा में average capable worker को आधार समझें।

Open Question Page
Ask Friends

यदि actual output high है पर rework cost high है तो productivity analysis में कौन सा data जरूरी है?

If actual output is high but rework cost is high which data is necessary in productivity analysis?

Explanation opens after your attempt
Correct Answer

A. Rework और rejection cost dataRework and rejection cost data

Step 1

Concept

High output alone is not enough if rework cost rises. Exam tip: include quality cost in productivity.

Step 2

Why this answer is correct

The correct answer is A. Rework और rejection cost data / Rework and rejection cost data. High output alone is not enough if rework cost rises. Exam tip: include quality cost in productivity.

Step 3

Exam Tip

High output alone enough नहीं है यदि rework cost बढ़े। परीक्षा में productivity में quality cost शामिल करें।

Open Question Page
Ask Friends

यदि wrist motion हटाने से per unit time 18 से 12 मिनट हुआ तो कौन सा standard review होना चाहिए?

If removing wrist motion changes per unit time from 18 to 12 minutes which standard should be reviewed?

Explanation opens after your attempt
Correct Answer

A. Time standard

Step 1

Concept

Motion improvement can change time standard. Exam tip: check motion and time study interaction.

Step 2

Why this answer is correct

The correct answer is A. Time standard. Motion improvement can change time standard. Exam tip: check motion and time study interaction.

Step 3

Exam Tip

Motion improvement time standard बदल सकता है। परीक्षा में motion और time study interaction देखें।

Open Question Page
Ask Friends

Functional foremanship में route clerk और speed boss की priorities clash हो रही हैं। सबसे practical remedy क्या है?

In functional foremanship priorities of route clerk and speed boss are clashing. What is the most practical remedy?

Explanation opens after your attempt
Correct Answer

A. Clear coordination and priority mechanism

Step 1

Concept

Coordination is needed in orders from multiple specialists. Exam tip: connect functional foremanship limitation with unity of command.

Step 2

Why this answer is correct

The correct answer is A. Clear coordination and priority mechanism. Coordination is needed in orders from multiple specialists. Exam tip: connect functional foremanship limitation with unity of command.

Step 3

Exam Tip

Multiple specialists के orders में coordination जरूरी है। परीक्षा में functional foremanship की limitation को unity of command से जोड़ें।

Open Question Page
Ask Friends

यदि speed boss accepted quality decide करने लगे और inspector speed target set करे तो कौन सी समस्या है?

If speed boss decides accepted quality and inspector sets speed target what is the problem?

Explanation opens after your attempt
Correct Answer

A. Specialist role overlap

Step 1

Concept

Confusion rises when specialist roles are not clear. Exam tip: treat role clarity as key in functional foremanship.

Step 2

Why this answer is correct

The correct answer is A. Specialist role overlap. Confusion rises when specialist roles are not clear. Exam tip: treat role clarity as key in functional foremanship.

Step 3

Exam Tip

Specialist roles clear न हों तो confusion बढ़ता है। परीक्षा में role clarity को functional foremanship में key मानें।

Open Question Page
Ask Friends

यदि standards और variants ठीक हैं पर layout bottleneck से queue बनती है तो कौन सी technique सबसे relevant है?

If standards and variants are proper but a layout bottleneck creates queues which technique is most relevant?

Explanation opens after your attempt
Correct Answer

C. Method study

Step 1

Concept

A layout bottleneck is a whole process issue. Exam tip: distinguish standards from process bottleneck.

Step 2

Why this answer is correct

The correct answer is C. Method study. A layout bottleneck is a whole process issue. Exam tip: distinguish standards from process bottleneck.

Step 3

Exam Tip

Layout bottleneck whole process issue है। परीक्षा में standards और process bottleneck अलग पहचानें।

Open Question Page
Ask Friends

यदि company internal standards रखती है लेकिन supplier audit नहीं करती और input बदलता है तो कौन सा risk है?

If a company keeps internal standards but does not audit suppliers and input changes what risk exists?

Explanation opens after your attempt
Correct Answer

A. Supply side variability standard results बिगाड़ेगीSupply side variability will disturb standard results

Step 1

Concept

Input quality is also a practical part of standardisation. Exam tip: do not ignore supply side standards.

Step 2

Why this answer is correct

The correct answer is A. Supply side variability standard results बिगाड़ेगी / Supply side variability will disturb standard results. Input quality is also a practical part of standardisation. Exam tip: do not ignore supply side standards.

Step 3

Exam Tip

Input quality भी standardisation का practical हिस्सा है। परीक्षा में supply side standard को ignore न करें।

Open Question Page
Ask Friends

यदि new standard tool लागू हुआ लेकिन manual old tool का है तो कौन सा gap है?

If a new standard tool is applied but the manual is for the old tool what gap exists?

Explanation opens after your attempt
Correct Answer

A. Standardisation training alignment gap

Step 1

Concept

Manual and training should be updated when standard tool changes. Exam tip: check implementation follow up.

Step 2

Why this answer is correct

The correct answer is A. Standardisation training alignment gap. Manual and training should be updated when standard tool changes. Exam tip: check implementation follow up.

Step 3

Exam Tip

Standard tool बदलने पर manual और training update होने चाहिए। परीक्षा में implementation follow up देखें।

Open Question Page
Ask Friends

यदि actual output 170 है और 13 units quality hold में हैं तो accepted output कितना होगा?

If actual output is 170 and 13 units are on quality hold what will be accepted output?

Explanation opens after your attempt
Correct Answer

B. 157 इकाई157 units

Step 1

Concept

Quality hold units are deducted from accepted output. Exam tip: calculate (170 - 13 = 157).

Step 2

Why this answer is correct

The correct answer is B. 157 इकाई / 157 units. Quality hold units are deducted from accepted output. Exam tip: calculate (170 - 13 = 157).

Step 3

Exam Tip

Accepted output में quality hold units घटती हैं। परीक्षा में (170 - 13 = 157) करें।

Open Question Page
Ask Friends

यदि wage policy में rejected units की treatment नहीं लिखी है तो कौन सा dispute सबसे likely है?

If wage policy does not mention treatment of rejected units which dispute is most likely?

Explanation opens after your attempt
Correct Answer

A. Rejected units wage में count होंगी या नहींWhether rejected units will count in wage

Step 1

Concept

The wage basis for quality rejection must be clear. Exam tip: read gross output and accepted output separately.

Step 2

Why this answer is correct

The correct answer is A. Rejected units wage में count होंगी या नहीं / Whether rejected units will count in wage. The wage basis for quality rejection must be clear. Exam tip: read gross output and accepted output separately.

Step 3

Exam Tip

Quality rejection का wage basis स्पष्ट होना चाहिए। परीक्षा में gross output और accepted output अलग पढ़ें।

Open Question Page
Ask Friends

यदि rest plan सही है लेकिन useless shoulder movement से fatigue बनी है तो कौन सा additional study चाहिए?

If rest plan is proper but useless shoulder movement still causes fatigue which additional study is needed?

Explanation opens after your attempt
Correct Answer

A. Motion study

Step 1

Concept

Even with proper rest useless movement can cause fatigue. Exam tip: understand motion fatigue interaction.

Step 2

Why this answer is correct

The correct answer is A. Motion study. Even with proper rest useless movement can cause fatigue. Exam tip: understand motion fatigue interaction.

Step 3

Exam Tip

Rest सही होने पर भी useless movement fatigue दे सकती है। परीक्षा में motion fatigue interaction समझें।

Open Question Page
Ask Friends

यदि high output target pain और absenteeism बढ़ा रहा है तो target बढ़ाने से पहले क्या जरूरी है?

If a high output target increases pain and absenteeism what is necessary before increasing target further?

Explanation opens after your attempt
Correct Answer

A. Fatigue sustainability check

Step 1

Concept

A target should be sustainable and consider human limits. Exam tip: check output and fatigue balance.

Step 2

Why this answer is correct

The correct answer is A. Fatigue sustainability check. A target should be sustainable and consider human limits. Exam tip: check output and fatigue balance.

Step 3

Exam Tip

Target टिकाऊ होना चाहिए और human limits को ध्यान में रखना चाहिए। परीक्षा में output और fatigue balance देखें।

Open Question Page
Ask Friends

किस option में technique और expert cue सही है?

Which option correctly matches technique and expert cue?

Explanation opens after your attempt
Correct Answer

A. Method study process bottleneck removal

Step 1

Concept

Process bottleneck removal is linked with method study. Exam tip: look for the whole process clue.

Step 2

Why this answer is correct

The correct answer is A. Method study process bottleneck removal. Process bottleneck removal is linked with method study. Exam tip: look for the whole process clue.

Step 3

Exam Tip

Process bottleneck removal method study से जुड़ा है। परीक्षा में whole process clue देखें।

Open Question Page
Ask Friends

किस option में technique और cue गलत matched हैं?

Which option has a wrongly matched technique and cue?

Explanation opens after your attempt
Correct Answer

C. Fatigue study standard time fixation

Step 1

Concept

Standard time fixation is linked with time study not fatigue study. Exam tip: remember the output of each study.

Step 2

Why this answer is correct

The correct answer is C. Fatigue study standard time fixation. Standard time fixation is linked with time study not fatigue study. Exam tip: remember the output of each study.

Step 3

Exam Tip

Standard time fixation time study से जुड़ा है fatigue study से नहीं। परीक्षा में each study का output याद रखें।

Open Question Page
Ask Friends

यदि actual time कम है लेकिन quality बहुत खराब है तो performance decision में क्या जोड़ना चाहिए?

If actual time is low but quality is very poor what should be added in performance decision?

Explanation opens after your attempt
Correct Answer

A. Quality standards और inspection dataQuality standards and inspection data

Step 1

Concept

Low time is good only when quality is acceptable. Exam tip: check speed and quality together.

Step 2

Why this answer is correct

The correct answer is A. Quality standards और inspection data / Quality standards and inspection data. Low time is good only when quality is acceptable. Exam tip: check speed and quality together.

Step 3

Exam Tip

कम time तभी अच्छा है जब quality acceptable हो। परीक्षा में speed और quality को साथ देखें।

Open Question Page
Ask Friends

यदि product mix बदल गया लेकिन पुराना output standard वही रखा गया तो expert action क्या होगा?

If product mix changes but old output standard is kept what will be the expert action?

Explanation opens after your attempt
Correct Answer

A. Output standard review

Step 1

Concept

Product mix changes may change method and time. Exam tip: remember major change means standard review.

Step 2

Why this answer is correct

The correct answer is A. Output standard review. Product mix changes may change method and time. Exam tip: remember major change means standard review.

Step 3

Exam Tip

Product mix बदलने से method और time बदल सकते हैं। परीक्षा में major change means standard review याद रखें।

Open Question Page
Ask Friends

यदि worker को कई foremen से conflicting orders मिलते हैं तो Fayol के किस principle से तुलना होगी?

If a worker receives conflicting orders from many foremen comparison will be with which Fayol principle?

Explanation opens after your attempt
Correct Answer

A. Unity of command

Step 1

Concept

Functional foremanship gives multiple orders that may contrast with unity of command. Exam tip: remember Taylor Fayol comparison.

Step 2

Why this answer is correct

The correct answer is A. Unity of command. Functional foremanship gives multiple orders that may contrast with unity of command. Exam tip: remember Taylor Fayol comparison.

Step 3

Exam Tip

Functional foremanship multiple orders देता है जो unity of command से contrast कर सकता है। परीक्षा में Taylor Fayol comparison याद रखें।

Open Question Page
Ask Friends

यदि common gauge size तय किया गया और rest pause भी scientifically तय हुआ तो कौन सा combined application है?

If common gauge size is fixed and rest pause is scientifically fixed what combined application is shown?

Explanation opens after your attempt
Correct Answer

A. Standardisation और fatigue studyStandardisation and fatigue study

Step 1

Concept

Common gauge size is standardisation and rest pause is fatigue study. Exam tip: catch combined clues.

Step 2

Why this answer is correct

The correct answer is A. Standardisation और fatigue study / Standardisation and fatigue study. Common gauge size is standardisation and rest pause is fatigue study. Exam tip: catch combined clues.

Step 3

Exam Tip

Common gauge size standardisation है और rest pause fatigue study है। परीक्षा में combined clues पकड़ें।

Open Question Page
Ask Friends

यदि variants घटाए गए और remaining variants के लिए uniform inspection criteria बने तो कौन सा combined use है?

If variants are reduced and uniform inspection criteria are made for remaining variants what combined use is shown?

Explanation opens after your attempt
Correct Answer

A. Simplification और standardisationSimplification and standardisation

Step 1

Concept

Reducing variants is simplification and inspection criteria is standardisation. Exam tip: identify two clue cases.

Step 2

Why this answer is correct

The correct answer is A. Simplification और standardisation / Simplification and standardisation. Reducing variants is simplification and inspection criteria is standardisation. Exam tip: identify two clue cases.

Step 3

Exam Tip

Variants घटाना simplification है और inspection criteria standardisation है। परीक्षा में two clue case पहचानें।

Open Question Page
Ask Friends

यदि process map सुधरा लेकिन training material old route पर आधारित है तो कौन सा implementation gap है?

If process map improves but training material is based on the old route what implementation gap exists?

Explanation opens after your attempt
Correct Answer

A. Method study output और training alignment gapMethod study output and training alignment gap

Step 1

Concept

The new process works only when training material is updated. Exam tip: check follow up after a technique.

Step 2

Why this answer is correct

The correct answer is A. Method study output और training alignment gap / Method study output and training alignment gap. The new process works only when training material is updated. Exam tip: check follow up after a technique.

Step 3

Exam Tip

नई process तभी लागू होगी जब training material update हो। परीक्षा में technique के बाद follow up देखें।

Open Question Page
Ask Friends

यदि workers trained हैं लेकिन job rotation इतनी तेज है कि speed stable नहीं होती तो practical issue क्या है?

If workers are trained but job rotation is so frequent that speed does not stabilise what is the practical issue?

Explanation opens after your attempt
Correct Answer

A. Practice stability और job fit की कमीLack of practice stability and job fit

Step 1

Concept

Training is supported by stable practice and suitable job. Exam tip: see training and job stability together.

Step 2

Why this answer is correct

The correct answer is A. Practice stability और job fit की कमी / Lack of practice stability and job fit. Training is supported by stable practice and suitable job. Exam tip: see training and job stability together.

Step 3

Exam Tip

Training को stable practice और suitable job support करते हैं। परीक्षा में training और job stability साथ देखें।

Open Question Page
Ask Friends

यदि high standard output दिया गया लेकिन method training नहीं हुई तो कौन सा gap सबसे गंभीर है?

If high standard output is given but method training is not done what is the most serious gap?

Explanation opens after your attempt
Correct Answer

A. Target capability mismatch

Step 1

Concept

A target is proper when workers know the correct method. Exam tip: check training with standard output.

Step 2

Why this answer is correct

The correct answer is A. Target capability mismatch. A target is proper when workers know the correct method. Exam tip: check training with standard output.

Step 3

Exam Tip

Target तभी उचित है जब workers सही method जानते हों। परीक्षा में standard output के साथ training देखें।

Open Question Page
Ask Friends

यदि accepted output 144 है और high rate ₹13 है तो wage कितनी होगी?

If accepted output is 144 and high rate is ₹13 what will be the wage?

Explanation opens after your attempt
Correct Answer

C. ₹1872

Step 1

Concept

Calculation is based on 144 accepted units. Exam tip: calculate \(144 \times 13 = 1872\).

Step 2

Why this answer is correct

The correct answer is C. ₹1872. Calculation is based on 144 accepted units. Exam tip: calculate \(144 \times 13 = 1872\).

Step 3

Exam Tip

Accepted output पर 144 units की calculation होगी। परीक्षा में \(144 \times 13 = 1872\) करें।

Open Question Page
Ask Friends

यदि 1080 minutes में 72 units बनती हैं तो per unit standard time कितना होगा?

If 72 units are produced in 1080 minutes what is per unit standard time?

Explanation opens after your attempt
Correct Answer

B. 15 मिनट15 minutes

Step 1

Concept

Per unit standard time will be \(1080 \div 72 = 15\) minutes. Exam tip: divide total time by units.

Step 2

Why this answer is correct

The correct answer is B. 15 मिनट / 15 minutes. Per unit standard time will be \(1080 \div 72 = 15\) minutes. Exam tip: divide total time by units.

Step 3

Exam Tip

प्रति इकाई standard time 15 मिनट होगा। परीक्षा में कुल समय को units से divide करें।

Open Question Page
Ask Friends

यदि route सही है लेकिन old route board workers को extra distance चलाता है तो root issue क्या है?

If route is correct but an old route board makes workers walk extra distance what is the root issue?

Explanation opens after your attempt
Correct Answer

A. Route communication update issue

Step 1

Concept

Failure to update route information is a planning communication problem. Exam tip: identify route clerk’s information role.

Step 2

Why this answer is correct

The correct answer is A. Route communication update issue. Failure to update route information is a planning communication problem. Exam tip: identify route clerk’s information role.

Step 3

Exam Tip

Route information update न होना planning communication problem है। परीक्षा में route clerk की सूचना भूमिका पहचानें।

Open Question Page
Ask Friends

यदि actual cost high है क्योंकि material multiple times handle हो रहा है तो root correction किस study से होगा?

If actual cost is high because material is handled multiple times which study will give root correction?

Explanation opens after your attempt
Correct Answer

A. Method study

Step 1

Concept

Repeated material handling is a whole process issue. Exam tip: connect material flow with method study.

Step 2

Why this answer is correct

The correct answer is A. Method study. Repeated material handling is a whole process issue. Exam tip: connect material flow with method study.

Step 3

Exam Tip

Repeated material handling whole process issue है। परीक्षा में material flow को method study से जोड़ें।

Open Question Page
Ask Friends

यदि high rate पाने के लिए speed बढ़ी लेकिन safety incidents बढ़ गए तो best method में क्या शामिल होना चाहिए?

If speed rises to get high rate but safety incidents increase what should the best method include?

Explanation opens after your attempt
Correct Answer

A. Speed के साथ safety और qualitySafety and quality with speed

Step 1

Concept

The best method should be fast as well as safe. Exam tip: balance efficiency with safety.

Step 2

Why this answer is correct

The correct answer is A. Speed के साथ safety और quality / Safety and quality with speed. The best method should be fast as well as safe. Exam tip: balance efficiency with safety.

Step 3

Exam Tip

Best method तेज होने के साथ सुरक्षित भी होनी चाहिए। परीक्षा में efficiency को safety से संतुलित करें।

Open Question Page
Ask Friends

यदि new output standard बताया गया लेकिन workers को time study process नहीं समझाया गया तो कौन सा risk है?

If a new output standard is announced but workers are not told the time study process what risk exists?

Explanation opens after your attempt
Correct Answer

A. Standard acceptance घट सकती हैStandard acceptance may fall

Step 1

Concept

Without transparency even scientific standards may face resistance. Exam tip: see standard setting and communication together.

Step 2

Why this answer is correct

The correct answer is A. Standard acceptance घट सकती है / Standard acceptance may fall. Without transparency even scientific standards may face resistance. Exam tip: see standard setting and communication together.

Step 3

Exam Tip

Transparency न हो तो scientific standard भी resistance ला सकता है। परीक्षा में standard setting और communication साथ देखें।

Open Question Page
Ask Friends

यदि product varieties few हैं और input standard है लेकिन workstation layout bottleneck है तो कौन सा study चाहिए?

If product varieties are few and input is standard but workstation layout is a bottleneck which study is needed?

Explanation opens after your attempt
Correct Answer

A. Method study

Step 1

Concept

A layout bottleneck is a process design issue. Exam tip: consider method study even after simplification and standardisation.

Step 2

Why this answer is correct

The correct answer is A. Method study. A layout bottleneck is a process design issue. Exam tip: consider method study even after simplification and standardisation.

Step 3

Exam Tip

Layout bottleneck process design issue है। परीक्षा में simplification और standardisation के बाद भी method study देखें।

Open Question Page
Ask Friends

यदि output 210 है और 17 units rejected हैं तो accepted output कितना होगा?

If output is 210 and 17 units are rejected what will be accepted output?

Explanation opens after your attempt
Correct Answer

C. 193 इकाई193 units

Step 1

Concept

Rejected units are deducted from accepted output. Exam tip: calculate (210 - 17 = 193).

Step 2

Why this answer is correct

The correct answer is C. 193 इकाई / 193 units. Rejected units are deducted from accepted output. Exam tip: calculate (210 - 17 = 193).

Step 3

Exam Tip

Accepted output में rejected units घटती हैं। परीक्षा में (210 - 17 = 193) करें।

Open Question Page
Ask Friends

यदि machine route और material सही हैं पर final product defect है तो checking role पहले किसका है?

If machine route and material are correct but final product is defective whose checking role comes first?

Explanation opens after your attempt
Correct Answer

A. Inspector

Step 1

Concept

Inspector checks final product quality. Exam tip: separate checking role from correction role.

Step 2

Why this answer is correct

The correct answer is A. Inspector. Inspector checks final product quality. Exam tip: separate checking role from correction role.

Step 3

Exam Tip

Final product quality checking inspector करता है। परीक्षा में checking role और correction role अलग रखें।

Open Question Page
Ask Friends

यदि defects wrong measuring gauge से हैं तो कमजोर technique और correction role का सही जोड़ा कौन सा है?

If defects are caused by a wrong measuring gauge which pair of weak technique and correction role is correct?

Explanation opens after your attempt
Correct Answer

A. Standardisation और repair bossStandardisation and repair boss

Step 1

Concept

Gauge standard is standardisation and tool correction may link with repair boss. Exam tip: check both standard and correction.

Step 2

Why this answer is correct

The correct answer is A. Standardisation और repair boss / Standardisation and repair boss. Gauge standard is standardisation and tool correction may link with repair boss. Exam tip: check both standard and correction.

Step 3

Exam Tip

Gauge standard मानकीकरण है और tool correction repair boss से जुड़ सकता है। परीक्षा में standard और correction दोनों देखें।

Open Question Page
Ask Friends

यदि higher output के बाद rest plan revise नहीं हुआ और errors बढ़े तो integrated action क्या है?

If rest plan is not revised after higher output and errors rise what is the integrated action?

Explanation opens after your attempt
Correct Answer

A. Time target और fatigue rest दोनों review करेंReview both time target and fatigue rest

Step 1

Concept

Rest balance is necessary with a higher target. Exam tip: see target revision and fatigue study together.

Step 2

Why this answer is correct

The correct answer is A. Time target और fatigue rest दोनों review करें / Review both time target and fatigue rest. Rest balance is necessary with a higher target. Exam tip: see target revision and fatigue study together.

Step 3

Exam Tip

Higher target के साथ rest balance जरूरी है। परीक्षा में target revision और fatigue study को साथ देखें।

Open Question Page
Ask Friends

यदि same product को अलग inspectors अलग criteria से pass fail करते हैं तो पहले क्या standardise करना चाहिए?

If different inspectors pass or fail the same product using different criteria what should be standardised first?

Explanation opens after your attempt
Correct Answer

A. Inspection criteria

Step 1

Concept

The same product needs the same inspection criteria. Exam tip: connect uniformity of quality decisions with standardisation.

Step 2

Why this answer is correct

The correct answer is A. Inspection criteria. The same product needs the same inspection criteria. Exam tip: connect uniformity of quality decisions with standardisation.

Step 3

Exam Tip

Same product के लिए same inspection criteria चाहिए। परीक्षा में quality decision uniformity को standardisation से जोड़ें।

Open Question Page
Ask Friends

यदि automated machine लगने के बाद भी पुराने manual method का time standard लागू है तो सबसे सही action क्या होगा?

If an automated machine is installed but the old manual method time standard is still applied what is the most correct action?

Explanation opens after your attempt
Correct Answer

A. Time standard और method basis को फिर से review करनाReview the time standard and method basis again

Step 1

Concept

A new machine can change both method and time. Exam tip: connect technology change with time standard revision.

Step 2

Why this answer is correct

The correct answer is A. Time standard और method basis को फिर से review करना / Review the time standard and method basis again. A new machine can change both method and time. Exam tip: connect technology change with time standard revision.

Step 3

Exam Tip

नई machine से method और time दोनों बदल सकते हैं। परीक्षा में technology change को time standard revision से जोड़ें।

Open Question Page
Ask Friends
FAQs

Class 12 Business Studies Quiz FAQs

How many questions are in this quiz?

This level is designed for 50 active questions. Currently 50 questions are available for the selected class and difficulty.

Is there a timer in this quiz?

Yes, the timer uses 25 seconds per question for Expert difficulty and shows the total remaining time on the page.

Can I open each question separately?

Yes, every question has its own SEO-friendly page with answer, explanation and related practice links.

Student Class Required

Select your class first

Quiz questions, daily challenge and practice pages will open according to your selected class. Class 11/12 ke liye stream bhi select karein.