Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है
This topic introduces Class 12 Business Studies students to F. W. Taylor’s scientific management approach within the chapter Principles of Management. Students learn how systematic observation, work-study and standardisation can improve efficiency and productivity. The topic explains Taylor’s principles, including science rather than rule of thumb, harmony and cooperation, cooperation rather than individualism, development of each worker, and the use of techniques such as time study, motion study, method study, fatigue study and differential piece wage system.
Expert · Level 5 · 25 questions
Practice questions
01A company cut its product range from 40 varieties to 3 without studying customer demand, and sales fell. What is the best analysis?एक कंपनी ने ग्राहकों की मांग का अध्ययन किए बिना उत्पादों की किस्में 40 से घटाकर 3 कर दीं और बिक्री घट गई। इसका सबसे सही विश्लेषण क्या है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:A. Simplification also removed varieties customers neededसरलीकरण में ग्राहकों की आवश्यक किस्में भी हटा दी गईं
The fall in sales suggests that some removed varieties may have been meeting customer demand. Simplification should remove unnecessary variety, not products customers need.बिक्री घटने से संकेत मिलता है कि हटाई गई कुछ किस्में ग्राहकों की जरूरत पूरी करती थीं। सरलीकरण में अनावश्यक विविधता घटाई जाती है, ग्राहकों की जरूरी पसंद नहीं।
02If a new machine is installed but the old standard time is retained, what risk could arise under the differential piece-rate system?यदि नई मशीन लगाने के बाद भी पुराना मानक समय लागू रखा जाए, तो विभेदात्मक मजदूरी प्रणाली में कौन-सा जोखिम हो सकता है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:B. Wage rates and performance comparisons may become misleadingमजदूरी दर तय करने और प्रदर्शन की तुलना करने में भ्रम हो सकता है
A new machine may change the work method or time required. If the standard is not reviewed, the resulting performance comparisons and piece-rate decisions may be unfair or misleading.नई मशीन से काम करने की विधि या लगने वाला समय बदल सकता है। मानक की समीक्षा न होने पर प्रदर्शन की तुलना और प्रति-इकाई मजदूरी तय करना अनुचित या भ्रामक हो सकता है।
03If total available time is 750 minutes, necessary rest takes 90 minutes, and the standard time per unit is 11 minutes, what is the standard output?यदि कुल उपलब्ध समय 750 मिनट है, आवश्यक विश्राम में 90 मिनट लगते हैं और प्रति इकाई मानक समय 11 मिनट है, तो मानक उत्पादन कितना होगा?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:C. 60 units60 इकाइयाँ
Subtract rest time from the available time: 750 − 90 = 660 minutes of working time. Then divide by 11 minutes per unit: 660 ÷ 11 = 60 units.उपलब्ध समय में से विश्राम घटाएँ: 750 − 90 = 660 मिनट का कार्य समय। फिर इसे प्रति इकाई 11 मिनट से भाग दें: 660 ÷ 11 = 60 इकाइयाँ।
04Workers are given standardised tools, but their training is still based on the old tools. What is a likely result?श्रमिकों को मानकीकृत औजार दिए गए हैं, लेकिन उनका प्रशिक्षण अब भी पुराने औजारों पर आधारित है। इसका संभावित परिणाम क्या होगा?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:D. The full benefit of standardised tools may not be realisedमानकीकृत औजारों का पूरा लाभ नहीं मिल पाएगा
Workers need training suited to the tools they use. Training based on old tools may prevent them from using the standardised tools effectively, so the full benefit may not be achieved.श्रमिकों को उन्हीं औजारों के अनुसार प्रशिक्षण चाहिए जिनका वे उपयोग करते हैं। पुराने औजारों पर आधारित प्रशिक्षण से वे नए मानकीकृत औजारों का प्रभावी उपयोग नहीं कर पाएँगे और उनका पूरा लाभ नहीं मिलेगा।
05In a production process worker speed is proper but material reaches in the wrong sequence. Which specialist’s analysis is primary?एक उत्पादन प्रक्रिया में श्रमिक की गति ठीक है लेकिन सामग्री गलत क्रम में पहुंचती है। किस विशेषज्ञ का विश्लेषण प्राथमिक है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:A. Route clerkरूट क्लर्क
Option A, the route clerk, is the primary specialist because the problem is the wrong sequence or route followed by materials. In Taylor’s functional organisation, the route clerk plans the path and order in which work and materials move through the process. The speed boss deals mainly with the proper working speed, so option B is not primary when worker speed is already correct. The inspector checks quality and detects defects; that may be useful later, but inspection does not primarily plan material sequence, so C is less suitable. The repair boss handles maintenance and repair of machines, not routing materials, so D is unrelated. The reasoning is therefore: worker speed is normal, the difficulty is movement and order of material, and movement/order points to the route clerk. Do not confuse route with speed or repair. The memory cue is: route clerk tells materials where and in what order to go; speed boss tells work how fast to proceed.विकल्प A, route clerk, सही है, क्योंकि समस्या सामग्री के गलत क्रम या गलत मार्ग से संबंधित है। Taylor की functional organisation में route clerk यह तय करता है कि काम और सामग्री प्रक्रिया में किस रास्ते और किस क्रम से आगे बढ़ेंगे। Speed boss मुख्य रूप से काम की उचित गति देखता है, इसलिए जब श्रमिक की गति पहले से ठीक है, तब विकल्प B प्राथमिक नहीं है। Inspector गुणवत्ता की जाँच करता है और दोष पकड़ता है; वह बाद में उपयोगी हो सकता है, पर सामग्री का क्रम तय करना उसका मुख्य काम नहीं है, इसलिए C कम उपयुक्त है। Repair boss मशीनों की मरम्मत और maintenance देखता है, सामग्री का मार्ग नहीं, इसलिए D असंबंधित है। तर्क यह है: गति ठीक है, समस्या material movement और sequence की है, और यह route clerk का क्षेत्र है। Route, speed और repair को आपस में न मिलाएँ। याद रखें: route clerk बताता है कि सामग्री कहाँ और किस क्रम में जाएगी; speed boss बताता है कि काम कितनी तेजी से होगा।
06Workers skip rest to increase output, but the error rate rises by the third day. What is the best combined conclusion?उत्पादन बढ़ाने के लिए श्रमिक विश्राम छोड़ देते हैं, लेकिन तीसरे दिन तक त्रुटियों की दर बढ़ जाती है। इससे सबसे सही संयुक्त निष्कर्ष क्या निकलता है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:B. Fatigue and rest must be studied along with incentivesप्रोत्साहन के साथ थकान और विश्राम का अध्ययन भी जरूरी है
Skipping rest may increase short-term output but can cause fatigue and more errors. Incentives should therefore be considered alongside appropriate rest and fatigue study.विश्राम छोड़ने से कुछ समय के लिए उत्पादन बढ़ सकता है, लेकिन इससे थकान और त्रुटियाँ बढ़ सकती हैं। इसलिए प्रोत्साहन के साथ उचित विश्राम और थकान का अध्ययन भी जरूरी है।
07Which option correctly distinguishes Taylor’s scientific method from blind copying?कौन-सा विकल्प टेलर की वैज्ञानिक पद्धति को बिना सोचे-समझे नकल करने से सही रूप में अलग बताता है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:C. Testing a method using local facts, experiments and measurementस्थानीय तथ्यों, प्रयोग और मापन से विधि की जाँच करना
A scientific approach uses facts, measurement and testing to determine whether a method works in the actual setting. Copying a method without checking it does not establish that it is suitable.वैज्ञानिक पद्धति में तथ्यों, मापन और परीक्षण के आधार पर जाँचा जाता है कि कोई तरीका वास्तविक कार्य-स्थिति में कारगर है या नहीं। बिना जाँच के किसी तरीके की नकल करने से उसकी उपयुक्तता सिद्ध नहीं होती।
08The standard is 150 units, and a worker produces 150 units. The stated policy applies the lower rate of ₹5 per unit at exactly the standard. What is the worker’s wage?मानक उत्पादन 150 इकाइयाँ है और एक श्रमिक 150 इकाइयाँ बनाता है। दी गई नीति के अनुसार ठीक मानक उत्पादन पर ₹5 प्रति इकाई की कम दर लागू होती है। श्रमिक की मजदूरी कितनी होगी?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:D. ₹750₹750
The worker produces exactly 150 units, so the stated rate is ₹5 per unit. Wage = 150 units × ₹5 per unit = ₹750.श्रमिक ठीक 150 इकाइयाँ बनाता है, इसलिए दी गई दर ₹5 प्रति इकाई लागू होगी। मजदूरी = 150 इकाइयाँ × ₹5 प्रति इकाई = ₹750।
09There is no dispute in an organisation, but neither side tries to increase the additional gain created by improvement. Which aspect of mental revolution is missing?एक संगठन में कोई विवाद नहीं है, लेकिन सुधार से मिलने वाले अतिरिक्त लाभ को बढ़ाने का प्रयास कोई पक्ष नहीं करता। मानसिक क्रांति का कौन-सा पहलू अधूरा है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:A. Trying to increase total prosperity through cooperationसहयोग के साथ कुल समृद्धि बढ़ाने का प्रयास
Mental revolution involves more than the absence of disputes. It also requires management and workers to cooperate in increasing the overall gains from improved productivity.मानसिक क्रांति का अर्थ केवल विवादों का न होना नहीं है। इसमें प्रबंधन और श्रमिकों का सहयोग करके बेहतर उत्पादकता से मिलने वाले कुल लाभ को बढ़ाने का प्रयास भी शामिल है।
10In functional foremanship, the inspector starts setting production speed and the speed boss starts making quality decisions. What problem is most likely?कार्यात्मक फोरमैनशिप में निरीक्षक उत्पादन की गति तय करने लगे और स्पीड बॉस गुणवत्ता संबंधी निर्णय लेने लगे, तो सबसे संभावित समस्या क्या होगी?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:B. There will be role confusion and coordination problemsभूमिकाओं में भ्रम और समन्वय की समस्या होगी
In functional foremanship, specialist duties are divided among different supervisors. When the inspector and speed boss take over each other’s functions, responsibility becomes unclear and coordination may suffer.कार्यात्मक फोरमैनशिप में अलग-अलग पर्यवेक्षकों को विशेषज्ञता के अनुसार जिम्मेदारियाँ दी जाती हैं। निरीक्षक और स्पीड बॉस एक-दूसरे के काम करने लगें, तो जिम्मेदारी अस्पष्ट हो सकती है और समन्वय प्रभावित हो सकता है।
11Production is sped up, and quality defects rise. What is the best improvement to the process?उत्पादन की गति बढ़ाए जाने के बाद गुणवत्ता संबंधी दोष बढ़ गए हैं। प्रक्रिया में सबसे अच्छा सुधार क्या होगा?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:C. Review the speed-up method and strengthen inspection while maintaining quality standardsगति बढ़ाने की विधि की समीक्षा करना और गुणवत्ता मानक बनाए रखते हुए निरीक्षण मजबूत करना
Faster production should not come at the cost of quality. Review how the speed was increased, keep the required quality standards, and ensure inspection can detect defects under the revised process.उत्पादन तेज करने से गुणवत्ता प्रभावित नहीं होनी चाहिए। गति बढ़ाने की विधि की समीक्षा करें, आवश्यक गुणवत्ता मानक बनाए रखें और सुनिश्चित करें कि बदली हुई प्रक्रिया में निरीक्षण दोष पकड़ सके।
12Workers know the output standard required to earn the higher piece rate, but have not been taught the correct method of working. What is the main gap?श्रमिकों को अधिक पीस-दर पाने के लिए आवश्यक उत्पादन-मानक पता है, लेकिन उन्हें काम करने की सही विधि नहीं सिखाई गई है। मुख्य कमी क्या है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:A. The wage incentive exists, but training and capability development are weakमजदूरी प्रोत्साहन उपलब्ध है, लेकिन प्रशिक्षण और क्षमता-विकास कमजोर हैं
The higher rate gives workers an incentive to meet the standard, but knowing the target alone does not teach them how to reach it. Taylor’s approach also calls for training and developing workers in the prescribed method.अधिक पीस-दर श्रमिकों को मानक पूरा करने का प्रोत्साहन देती है, लेकिन केवल लक्ष्य जानने से उसे पाने की विधि नहीं आती। टेलर के दृष्टिकोण में श्रमिकों को निर्धारित विधि का प्रशिक्षण देना और उनका विकास करना भी शामिल है।
13If workers and management look peaceful externally but internally consider each other opportunistic what level of solution is needed?यदि श्रमिक और प्रबंधन बाहर से शांत हैं लेकिन अंदर से एक दूसरे को अवसरवादी मानते हैं तो किस स्तर का समाधान चाहिए?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:C. Attitude change through mental revolutionमानसिक क्रांति द्वारा दृष्टिकोण परिवर्तन
Option C is correct: attitude change through mental revolution is needed. Taylor’s mental revolution means a basic change in the thinking of both workers and management. They should stop treating one another as opponents trying to gain at the other’s expense and instead cooperate for shared productivity and fair benefits. External calm is not enough; hidden distrust shows that real cooperation has not been achieved. Option A, standardisation, creates uniform methods or conditions, but it cannot by itself remove suspicion or selfish attitudes. Option B, motion study, analyses unnecessary movements and improves the method of work; it does not directly solve mutual distrust. Option D, a time clerk, is a role or measurement arrangement, not a solution to attitudes. The reasoning is: the problem is psychological and relational, so the remedy must change attitudes. The memory cue is: silent conflict or distrust means mental revolution, not merely a new standard or measurement.विकल्प C सही है: mental revolution द्वारा दृष्टिकोण में परिवर्तन आवश्यक है। Taylor की mental revolution का अर्थ है कि श्रमिक और management दोनों अपनी मूल सोच बदलें। उन्हें एक-दूसरे को ऐसा विरोधी नहीं समझना चाहिए जो दूसरे का लाभ छीनना चाहता है; इसके बजाय दोनों को productivity और उचित लाभ के लिए सहयोग करना चाहिए। बाहर से शांति पर्याप्त नहीं है, क्योंकि अंदर का अविश्वास बताता है कि वास्तविक cooperation नहीं आया। विकल्प A, standardisation, समान methods और conditions बना सकता है, पर अकेले संदेह या स्वार्थी सोच समाप्त नहीं करता। विकल्प B, motion study, अनावश्यक movements का अध्ययन करता है और काम की विधि सुधारता है; यह आपसी अविश्वास का सीधा इलाज नहीं है। विकल्प D, time clerk, केवल एक भूमिका या measurement व्यवस्था है, attitude का समाधान नहीं। इसलिए समस्या मानसिक और संबंधों से जुड़ी है, तो समाधान भी दृष्टिकोण बदलने वाला होना चाहिए। याद रखें: छिपा हुआ अविश्वास mental revolution की कमी बताता है।
14A worker’s unnecessary hand movements have been removed, but materials still travel back and forth unnecessarily through the overall process. Which study is most relevant to address this process-flow problem?एक श्रमिक की अनावश्यक हाथ की गतियाँ हटा दी गई हैं, लेकिन पूरी प्रक्रिया में सामग्री अब भी बेवजह आगे-पीछे जाती है। इस प्रक्रिया-प्रवाह की समस्या को दूर करने के लिए कौन-सा अध्ययन सबसे उपयुक्त है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:D. Method studyविधि अध्ययन
Motion study examines workers’ movements; method study examines how the whole job or process is carried out. Since the remaining problem is unnecessary movement of materials through the process, method study is the best choice.गति-अध्ययन श्रमिकों की गतिविधियों की जाँच करता है, जबकि विधि-अध्ययन पूरे काम या प्रक्रिया के तरीके की। यहाँ शेष समस्या प्रक्रिया में सामग्री की अनावश्यक आवाजाही है, इसलिए विधि-अध्ययन सबसे उपयुक्त है।
15A worker produces 118 units when the standard output is 120 units. Under the differential piece-rate system, the lower rate is ₹6 per unit. What is the worker’s wage?एक श्रमिक 118 इकाइयाँ बनाता है, जबकि मानक उत्पादन 120 इकाइयाँ है। विभेदात्मक पीस-दर प्रणाली में निम्न दर ₹6 प्रति इकाई है। श्रमिक की मजदूरी कितनी होगी?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:A. ₹708₹708
The worker is below the 120-unit standard, so the stated lower rate applies. Wage = 118 units × ₹6 per unit = ₹708.श्रमिक 120 इकाइयों के मानक से कम उत्पादन करता है, इसलिए दी गई निम्न दर लागू होगी। मजदूरी = 118 इकाइयाँ × ₹6 प्रति इकाई = ₹708।
16When setting or reviewing a time standard, in which situation is it especially important to consider findings from a fatigue study?समय-मानक तय करते या उसकी समीक्षा करते समय किस स्थिति में थकान-अध्ययन के निष्कर्षों पर विशेष रूप से ध्यान देना चाहिए?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:A. The standard is met, but the error rate rises toward the end of the workdayमानक पूरा हो जाता है, लेकिन कार्य-दिवस के अंत में त्रुटियों की दर बढ़ जाती है
A rising error rate late in the day may indicate fatigue. A time standard should be considered alongside the rest and recovery needs identified by fatigue study, rather than judged only by whether the output target is met.दिन के अंत में त्रुटियों की बढ़ती दर थकान का संकेत हो सकती है। समय-मानक का आकलन केवल उत्पादन-लक्ष्य पूरा होने से नहीं, बल्कि थकान-अध्ययन से पहचानी गई विश्राम और पुनर्बलन की जरूरतों के साथ भी करना चाहिए।
17Tools and the work method are standardised, but raw materials differ in quality from supplier to supplier. Which standard is missing or incomplete?औज़ार और कार्य-विधि मानकीकृत हैं, लेकिन अलग-अलग आपूर्तिकर्ताओं से मिलने वाले कच्चे माल की गुणवत्ता अलग है। कौन-सा मानक अनुपस्थित या अधूरा है?
Standardisation can cover the quality of materials as well as tools and methods. Setting a material-quality standard would help ensure that incoming raw materials meet consistent requirements.मानकीकरण में औज़ारों और विधियों के साथ-साथ सामग्री की गुणवत्ता भी शामिल हो सकती है। सामग्री-गुणवत्ता मानक तय करने से यह सुनिश्चित करने में मदद मिलेगी कि आने वाला कच्चा माल एकसमान आवश्यकताओं पर खरा उतरे।
18A factory uses work study to reduce the time allowed for a task but does not explain to workers how the new target was set. What risk is most likely to increase?एक कारखाना कार्य-अध्ययन से किसी काम का निर्धारित समय घटाता है, लेकिन श्रमिकों को यह नहीं समझाता कि नया लक्ष्य कैसे तय किया गया। इससे कौन-सा जोखिम बढ़ने की सबसे अधिक संभावना है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:B. Workers’ acceptance of the target and their trust may declineलक्ष्य के प्रति श्रमिकों की स्वीकृति और उनका विश्वास घट सकता है
If workers are not told the basis for a new target, they may see it as arbitrary and be less willing to accept it. Explaining the work-study findings can support trust and cooperation.यदि श्रमिकों को नए लक्ष्य का आधार नहीं बताया जाता, तो उन्हें यह मनमाना लग सकता है और वे इसे स्वीकार करने में कम इच्छुक हो सकते हैं। कार्य-अध्ययन के निष्कर्ष समझाने से विश्वास और सहयोग बनाए रखने में मदद मिल सकती है।
19A correct method has been established, but a worker is repeatedly moved between different jobs. What difficulty can this create for Taylor’s principle of developing workers to their fullest efficiency?काम करने की सही विधि तय हो गई है, लेकिन एक श्रमिक को बार-बार अलग-अलग कामों में लगाया जाता है। इससे श्रमिकों को उनकी सर्वोच्च दक्षता तक विकसित करने के टेलर के सिद्धांत में कौन-सी कठिनाई आ सकती है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:A. The worker may not have enough consistent practice to develop efficiency in a jobकिसी एक काम में दक्षता विकसित करने के लिए श्रमिक को पर्याप्त नियमित अभ्यास नहीं मिल पाएगा
Workers need suitable training and practice to build efficiency in their assigned work. Frequent moves between unrelated jobs can interrupt that learning and make it harder to develop their abilities fully.निर्धारित काम में दक्षता विकसित करने के लिए श्रमिकों को उपयुक्त प्रशिक्षण और अभ्यास चाहिए। असंबंधित कामों के बीच बार-बार स्थानांतरण से सीखने की प्रक्रिया बाधित हो सकती है और उनकी क्षमताओं का पूरा विकास कठिन हो सकता है।
20Which option lists three specialists from the planning department in Taylor’s functional foremanship system?टेलर की कार्यात्मक फोरमैनशिप प्रणाली में योजना विभाग के तीन विशेषज्ञों की सूची कौन-सी है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:B. Route clerk, disciplinarian, time-and-cost clerkरूट क्लर्क, अनुशासन अधिकारी, समय एवं लागत क्लर्क
The planning department’s four specialists are the route clerk, instruction-card clerk, time-and-cost clerk, and disciplinarian. Option B names three of them; the other options list shop-floor specialists or a mixture.योजना विभाग के चार विशेषज्ञ रूट क्लर्क, निर्देश-पत्र क्लर्क, समय एवं लागत क्लर्क और अनुशासन अधिकारी हैं। विकल्प B में इनमें से तीन नाम हैं; अन्य विकल्पों में कार्यशाला-पक्ष के विशेषज्ञ या मिश्रित सूची है।
21A worker’s output is below the standard, and the lower piece rate is being applied. A machine breakdown occurred during the shift. What should be checked first for a fair assessment?एक श्रमिक का उत्पादन मानक से कम है और उस पर निम्न पीस-दर लागू की जा रही है। कार्य-अवधि के दौरान मशीन खराब हुई थी। निष्पक्ष आकलन के लिए सबसे पहले क्या जाँचना चाहिए?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:A. Whether the low output was caused by the worker’s performance or by the machine conditionक्या कम उत्पादन का कारण श्रमिक का प्रदर्शन था या मशीन की स्थिति
A machine breakdown can reduce output independently of a worker’s effort. Before judging the worker’s performance against the standard, identify whether the breakdown caused the shortfall.मशीन खराब होने से श्रमिक के प्रयास से अलग कारण के चलते उत्पादन घट सकता है। मानक के मुकाबले श्रमिक के प्रदर्शन का आकलन करने से पहले यह पता करना चाहिए कि कमी मशीन की खराबी के कारण हुई थी या नहीं।
22In scientific selection, an ability test is appropriate, but the worker’s interests and suitability for the job are not considered. What problem may result?वैज्ञानिक चयन में योग्यता-परीक्षण उपयुक्त है, लेकिन श्रमिक की रुचि और काम के लिए उसकी उपयुक्तता पर विचार नहीं किया जाता। इससे कौन-सी समस्या हो सकती है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:A. Efficiency and development may remain limitedदक्षता और विकास सीमित रह सकते हैं
An ability test alone may not show whether a worker is well suited to or interested in a particular job. A poor match can make it harder to develop the worker’s efficiency and abilities fully.केवल योग्यता-परीक्षण से यह पता नहीं चलता कि श्रमिक किसी विशेष काम के लिए उपयुक्त है या उसमें उसकी रुचि है। सही मेल न होने पर उसकी दक्षता और क्षमताओं का पूरा विकास कठिन हो सकता है।
23A business produces many variants of similar products. Its production speed and quality meet the required standards, but the many variants are raising costs. Which Taylor technique is most relevant to reduce unnecessary variety?एक व्यवसाय समान उत्पादों के कई प्रकार बनाता है। उत्पादन की गति और गुणवत्ता निर्धारित मानकों के अनुसार हैं, लेकिन बहुत अधिक प्रकारों के कारण लागत बढ़ रही है। अनावश्यक विविधता घटाने के लिए टेलर की कौन-सी तकनीक सबसे उपयुक्त है?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:B. Simplificationसरलीकरण
The correct answer is B, simplification. It reduces unnecessary varieties or sizes, which can lower the complexity and cost of production when many variants are driving costs up.सही उत्तर B, सरलीकरण है। यह अनावश्यक प्रकारों या आकारों को कम करता है। जब बहुत अधिक प्रकार उत्पादन की जटिलता और लागत बढ़ाते हैं, तो सरलीकरण उन्हें घटाने में मदद करता है।
24Workers meet the required production standard, but the number of units accepted as good output is too low. Which data would best help identify why?श्रमिक निर्धारित उत्पादन मानक पूरा करते हैं, लेकिन गुणवत्ता जाँच में स्वीकार की गई इकाइयों की संख्या बहुत कम है। इसका कारण जानने के लिए कौन-सा आँकड़ा सबसे उपयोगी होगा?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:C. Inspection rejection dataनिरीक्षण में अस्वीकृत इकाइयों के आँकड़े
The correct answer is C. Rejection data shows how many units fail inspection and can explain why accepted output is low even when the production target is met.सही उत्तर C है। अस्वीकृति के आँकड़े बताते हैं कि कितनी इकाइयाँ निरीक्षण में विफल रहीं। इससे समझा जा सकता है कि उत्पादन लक्ष्य पूरा होने पर भी स्वीकार की गई इकाइयाँ कम क्यों हैं।
25A worker produces 99 units against a standard of 100 units. The lower piece rate is ₹11 per unit and the higher rate is ₹13 per unit; the higher rate applies only if the standard is met or exceeded. What is the worker’s wage?एक श्रमिक 100 इकाइयों के मानक के मुकाबले 99 इकाइयाँ बनाता है। निम्न दर ₹11 प्रति इकाई और उच्च दर ₹13 प्रति इकाई है; उच्च दर तभी लागू होती है जब मानक पूरा हो या उससे अधिक उत्पादन हो। श्रमिक की मजदूरी कितनी होगी?
0 reads0 helpful★ – (0)
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर:A. ₹1,089₹1,089
The correct answer is A. Since 99 units is below the 100-unit standard, the lower rate applies: 99 × ₹11 = ₹1,089.सही उत्तर A है। 99 इकाइयों का उत्पादन 100 इकाइयों के मानक से कम है, इसलिए निम्न दर लागू होगी: 99 × ₹11 = ₹1,089।
Google Analytics helps us understand site usage. Google may send limited cookie-free signals before your choice. The Live Visitors widget operates independently of this analytics choice; see the privacy policy for its provider and fallback details. Essential site features work without analytics cookies. You can change your choice later in Privacy choices. Privacy policy