Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है
In Class 12 Business Studies, the topic “Programme” explains a detailed plan designed to achieve a specific objective. Students learn how a programme brings together related policies, procedures, rules, tasks and the sequence in which activities should be performed. They also understand how programmes guide action, allocate time and resources, coordinate efforts, and reduce uncertainty in the planning process. The topic highlights why programmes are more specific and action-oriented than broad plans such as objectives or strategies.
Hard · Level 4 · 25 questions
TOPIC PRACTICE
Quiz this set
Up to 25 questions from this page. Select your focus, then start.
25 questions
Choose questions
View options
Human capability gap
Cash surplus
Excess physical resources
Policy stability
View options
Lack of flexibility
Excess communication
Correct review
Objective clarity
View options
When a key resource is not available at expected time
When every activity is on time
When objective is clear and stable
When review finds no shortcoming
View options
Important and time sensitive activities may be left behind
All objectives will be achieved quickly
Cost will always decrease
Resources will become unlimited
View options
Adjustment in changing situations will be difficult
Responsibility will not be clear
Resources will automatically increase
Objective will end
View options
Programme can be a detailed action plan to implement a project
Programme is always unrelated to project
Project is only a rule
Programme is only employee list
View options
Take a balanced decision and protect the objective
Only reduce cost
Only look at time
Always ignore quality
View options
Effect of promotion cost and discount
Employee birthdays
Building decoration
Name of policy
View options
Lack of communication and coordination
Capital budget
Standing policy
Cash surplus
View options
Activity completed but real objective not achieved
Programme is fully successful
Review is not needed
Cost control is impossible
View options
Procedure states method and rules state clear permission or prohibition
Both only state expense
Both end the budget
Both have no relation with programme
View options
General direction will exist but method of work will remain unclear
Work will complete automatically
Expense will be zero
Responsibility will not be needed
View options
Errors in use and resistance may increase
Cost will always be zero
Customers will be immediately satisfied
Policy will form automatically
View options
Needs and support of important people may be missed
Resources will automatically be available
Objective will always be clear
Expense will end
View options
It will be difficult to measure the programme's success clearly
The programme's cost will reduce automatically
All programme activities will end immediately
The programme's objectives will become unnecessary
View options
Resources may be diverted from other important work
Programme will always fail
Expense will never occur
Deadline will end
View options
Workload and resource balance
Only date
Company colour
Number of rules
View options
Opportunity to improve programme according to real need
Only opportunity to increase expense
Opportunity to remove objective
Opportunity to keep rules secret
View options
Mismatch between objectives and activities
Adequacy of resources
Effectiveness of scheduling
Clarity of responsibilities
View options
When expenses and work begin before permission
When permission is already obtained
When there is no legal need
When programme is completed
View options
Programme may be disrupted if equipment fails
All costs will end
Training will be unnecessary
Objective will be achieved automatically
View options
Continuous review and control
Oral instruction
Standing rule
Employee list
View options
Necessary people get information and unnecessary disclosure is avoided
All information remains hidden
Everything is told to outsiders
Communication is not needed
View options
Review of compliance issue is needed along with success
Rules are not needed
If result is good everything is right
Programme will not be considered policy
View options
It integrates activity time resources responsibility risk and control for a specific objective
It only prepares expense list
It gives only standing rule
It is only general policy
Question 1HardLevel 4
Resources are available in a programme but skills are not available. What type of gap is this?कार्यक्रम में संसाधन उपलब्ध हैं लेकिन कौशल उपलब्ध नहीं है। किस प्रकार की कमी है?
Correct answer:सही उत्तर:A
The direct answer is Option A: a human capability gap. Resources can include buildings, equipment, money, and materials, but successful implementation also requires people with suitable knowledge and skills. If physical resources are available but trained or capable personnel are missing, the problem is not a shortage of equipment; it is a shortage of human capability. Option A is correct because the missing element is skill. Option B is wrong because cash surplus means extra money, which is not the stated problem. Option C is wrong because the facts do not merely show excess physical resources; they show that human ability is lacking. Option D is wrong because policy stability concerns consistency of rules or guidance, not employee competence. Memory cue: tools available but trained people missing equals capability gap.सीधा उत्तर विकल्प A है: मानवीय क्षमता की कमी। संसाधनों में भवन, उपकरण, धन और सामग्री के साथ-साथ उपयुक्त ज्ञान और कौशल वाले लोग भी शामिल होते हैं। यदि भौतिक संसाधन उपलब्ध हों, लेकिन प्रशिक्षित या सक्षम कर्मचारी न हों, तो समस्या उपकरणों की कमी नहीं बल्कि मानवीय क्षमता की कमी है। विकल्प A सही है क्योंकि अनुपस्थित तत्व कौशल है। विकल्प B गलत है, क्योंकि नकद अधिशेष का अर्थ अतिरिक्त धन होता है, जबकि यहाँ समस्या कौशल की है। विकल्प C गलत है, क्योंकि केवल भौतिक संसाधनों की अधिकता बताना पर्याप्त नहीं; मुख्य कमी मानव क्षमता में है। विकल्प D गलत है, क्योंकि नीति की स्थिरता नियमों या मार्गदर्शन की निरंतरता से जुड़ी है, कर्मचारियों की योग्यता से नहीं। याद रखें: साधन मौजूद हों, पर कुशल लोग न हों, तो यह क्षमता-अंतर है।
If external conditions change but the programme does not change which weakness will be shown?यदि कार्यक्रम में बाहरी परिस्थितियां बदल गईं लेकिन योजना नहीं बदली तो कौन सी कमी दिखाई देगी?
Correct answer:सही उत्तर:A
Adjustment of programme may be needed in changing conditions. Link flexibility with practical planning in exams.बदलती परिस्थिति में कार्यक्रम का समायोजन जरूरी हो सकता है। परीक्षा में flexibility को practical planning से जोड़ें।
In which situation will revising a programme be correct?किस स्थिति में कार्यक्रम को संशोधित करना सही होगा?
Correct answer:सही उत्तर:A
If an important resource is unavailable time and sequence may need change. Link programme revision with resource change in exams.महत्वपूर्ण संसाधन न मिलने पर समय और क्रम बदलना पड़ सकता है। परीक्षा में programme revision को resource change से जोड़ें।
Why can doing only easy activities first be wrong while setting priority in a programme?कार्यक्रम में प्राथमिकता तय करते समय केवल आसान कार्य पहले करना क्यों गलत हो सकता है?
Correct answer:सही उत्तर:A
The direct answer is Option A: important and time-sensitive activities may be left behind. Priority means deciding which activities deserve attention first. A programme should consider importance, deadlines, dependencies, risk, and available resources—not simply ease. If easy tasks are always chosen first, difficult but essential tasks may be delayed until their deadline is near. A delayed critical activity can hold up dependent activities and may cause the whole programme to miss its objective. Option A is correct because it states this real danger. Option B is wrong because completing easy work first does not guarantee that all objectives will be achieved quickly. Option C is wrong because costs do not always fall; delay can even increase them. Option D is wrong because priority decisions cannot make resources unlimited. Exam cue: urgent and important work should not be postponed merely because it is difficult.सीधा उत्तर विकल्प A है: महत्वपूर्ण और समय-संवेदी कार्य पीछे रह सकते हैं। प्राथमिकता का अर्थ है यह तय करना कि किन गतिविधियों पर पहले ध्यान दिया जाए। कार्यक्रम में केवल आसानी नहीं, बल्कि महत्व, समय-सीमा, निर्भरता, जोखिम और उपलब्ध संसाधनों को देखना चाहिए। यदि हमेशा आसान काम पहले चुने जाएँ, तो कठिन लेकिन आवश्यक काम समय-सीमा तक टल सकते हैं। किसी महत्वपूर्ण कार्य की देरी उस पर निर्भर दूसरे कार्यों को भी रोक सकती है और पूरा कार्यक्रम उद्देश्य से पीछे रह सकता है। विकल्प A सही है क्योंकि वह इसी वास्तविक खतरे को बताता है। विकल्प B गलत है, क्योंकि आसान काम पहले करने से सभी उद्देश्य जल्दी पूरे होने की गारंटी नहीं होती। विकल्प C गलत है, क्योंकि लागत हमेशा नहीं घटती; देरी से लागत बढ़ भी सकती है। विकल्प D गलत है, क्योंकि प्राथमिकता तय करने से संसाधन असीमित नहीं हो जाते। परीक्षा संकेत: जरूरी और महत्वपूर्ण काम को केवल कठिन होने के कारण टालना नहीं चाहिए।
If rules fixed in a programme are too rigid what risk may arise?कार्यक्रम में निर्धारित नियम बहुत कठोर हों तो कौन सा जोखिम बन सकता है?
Correct answer:सही उत्तर:A
Rules provide clarity but excessive rigidity reduces flexibility. Remember balance of rules and flexibility in exams.नियम स्पष्टता देते हैं पर अत्यधिक कठोरता flexibility घटाती है। परीक्षा में rules and flexibility balance याद रखें।
Which statement is more correct while explaining the relation between programme and project?कार्यक्रम और परियोजना में संबंध समझाते समय कौन सा कथन अधिक सही है?
Correct answer:सही उत्तर:A
A programme is a coordinated and detailed plan that arranges the activities, resources, responsibilities, time, and related steps needed to achieve a larger objective. A project usually refers to a specific undertaking with a defined result, while a programme can provide the broader action framework for carrying out one project or a group of related projects. The exact relationship may vary by management context, but the options make the intended relationship clear.
Option A is the best answer because a programme can serve as a detailed action plan for implementing a project. It is not necessarily unrelated to a project, a project is not merely a rule, and a programme is much more than an employee list. The wording “can be” is appropriately cautious rather than claiming that every programme has one identical form. The supplied answer A is therefore acceptable and factually consistent with the choices.कार्यक्रम एक समन्वित और विस्तृत योजना होता है, जिसमें बड़े उद्देश्य को पूरा करने के लिए गतिविधियां, संसाधन, जिम्मेदारियां, समय और संबंधित चरण व्यवस्थित किए जाते हैं। परियोजना सामान्यतः निश्चित परिणाम वाला विशिष्ट कार्य होती है, जबकि कार्यक्रम एक परियोजना या संबंधित परियोजनाओं को लागू करने के लिए व्यापक कार्य-ढांचा दे सकता है। अलग-अलग प्रबंधकीय संदर्भों में संबंध का रूप बदल सकता है, पर दिए गए विकल्पों से आशय स्पष्ट है।
विकल्प A सबसे सही है, क्योंकि कार्यक्रम किसी परियोजना को लागू करने की विस्तृत कार्य योजना हो सकता है। कार्यक्रम का परियोजना से हमेशा असंबंधित होना गलत है, परियोजना केवल नियम नहीं होती और कार्यक्रम केवल कर्मचारियों की सूची भी नहीं है। विकल्प में “हो सकता है” कहा गया है, इसलिए यह हर स्थिति के लिए कठोर दावा नहीं करता। अतः दिया गया उत्तर A स्वीकार्य और तथ्यात्मक रूप से संगत है।
If there is conflict among time cost and quality in a programme what should a manager do?यदि कार्यक्रम में समय लागत और गुणवत्ता में टकराव हो तो प्रबंधक को क्या करना चाहिए?
Correct answer:सही उत्तर:A
The direct answer is A: take a balanced decision and protect the objective. A programme must be completed within practical limits of time, cost, and quality. These three factors can sometimes conflict: finishing sooner may cost more, lowering cost may reduce quality, and improving quality may require extra time. A manager should not blindly choose one factor. The correct process is to examine the trade-off, identify the programme’s essential objective and required quality, and then select the most reasonable combination of time and cost. Option A is correct because it protects the purpose of the programme while considering all three constraints. Option B, only reducing cost, may save money but can cause poor materials, unsafe work, or failure to achieve the objective. Option C, only looking at time, may produce hurried and defective results. Option D, always ignoring quality, is especially wrong because quality is often essential for usefulness, safety, customer satisfaction, and long-term success. Balanced does not mean giving every factor exactly equal weight; it means making a reasoned decision according to the objective and circumstances. Exam cue: when time, cost, and quality clash, analyse the trade-off instead of selecting one blindly.सीधा उत्तर A है: संतुलित निर्णय लेकर उद्देश्य को सुरक्षित रखना। किसी कार्यक्रम को समय, लागत और गुणवत्ता की व्यावहारिक सीमाओं में पूरा करना होता है। कई बार ये तीनों एक-दूसरे से टकरा सकते हैं। जल्दी काम पूरा करने पर खर्च बढ़ सकता है, खर्च घटाने पर गुणवत्ता कम हो सकती है और बेहतर गुणवत्ता के लिए अधिक समय या धन चाहिए हो सकता है। इसलिए प्रबंधक को बिना सोचे केवल एक तत्व नहीं चुनना चाहिए। उसे पहले कार्यक्रम का मुख्य उद्देश्य, आवश्यक गुणवत्ता और उपलब्ध समय-धन देखना चाहिए, फिर इनके बीच उचित समझौता या trade-off तय करना चाहिए। विकल्प A सही है क्योंकि इसमें सभी पक्षों पर विचार करते हुए उद्देश्य की रक्षा की जाती है। विकल्प B, केवल लागत घटाना, सस्ता तो हो सकता है, पर खराब सामग्री, असुरक्षित कार्य या उद्देश्य की विफलता पैदा कर सकता है। विकल्प C, केवल समय देखना, जल्दबाजी और खराब परिणाम दे सकता है। विकल्प D, गुणवत्ता को हमेशा अनदेखा करना, गलत है क्योंकि गुणवत्ता उपयोगिता, सुरक्षा, ग्राहक संतोष और लंबे समय की सफलता के लिए आवश्यक हो सकती है। संतुलित निर्णय का अर्थ यह नहीं कि हर तत्व को बिल्कुल समान महत्व दिया जाए; अर्थ यह है कि परिस्थिति और उद्देश्य के अनुसार तर्कसंगत निर्णय लिया जाए। परीक्षा संकेत: समय, लागत और गुणवत्ता में टकराव हो तो किसी एक को आँख बंद करके न चुनें; trade-off का विश्लेषण करें।
If a sales promotion programme increased sales but profit decreased what should be checked?यदि बिक्री संवर्धन कार्यक्रम से बिक्री बढ़ी लेकिन लाभ घटा तो किस बात की जांच करनी चाहिए?
Correct answer:सही उत्तर:A
Increase in sales alone is not enough impact on profit should also be checked. Link programme evaluation with results in exams.केवल बिक्री बढ़ना पर्याप्त नहीं लाभ पर प्रभाव भी देखना चाहिए। परीक्षा में programme evaluation को results से जोड़ें।
If activities started in a programme but concerned departments did not get information what is the clearest defect?यदि कार्यक्रम में कार्य शुरू हो गए पर संबंधित विभागों को सूचना नहीं मिली तो सबसे स्पष्ट दोष क्या है?
Correct answer:सही उत्तर:A
Informing concerned people is necessary in a programme. Treat communication failure as coordination issue in exams.कार्यक्रम में संबंधित लोगों को सूचना देना आवश्यक है। परीक्षा में communication failure को coordination issue मानें।
If output is completed in a programme but outcome is not achieved what will be the conclusion?यदि कार्यक्रम में आउटपुट पूरा हुआ लेकिन outcome प्राप्त नहीं हुआ तो क्या निष्कर्ष होगा?
Correct answer:सही उत्तर:A
Success of programme is also measured by final objective. Remember output and outcome difference in exams.कार्यक्रम की सफलता अंतिम उद्देश्य से भी मापी जाती है। परीक्षा में output and outcome अंतर याद रखें।
Why may both procedure and rules be necessary in a programme?कार्यक्रम में कार्यविधि और नियम दोनों क्यों जरूरी हो सकते हैं?
Correct answer:सही उत्तर:A
Procedure and rules increase clarity of work in a programme. Understand the difference of supporting plans in exams.कार्यविधि और नियम कार्यक्रम में कार्य स्पष्टता बढ़ाते हैं। परीक्षा में supporting plans का अंतर समझें।
If a programme has policy but no procedure what difficulty will arise?यदि कार्यक्रम में नीति तो है लेकिन कार्यविधि नहीं है तो कौन सी कठिनाई होगी?
Correct answer:सही उत्तर:A
Policy gives direction but procedure states the order of work. Remember policy and procedure difference in exams.नीति दिशा देती है पर कार्यविधि काम का क्रम बताती है। परीक्षा में policy and procedure difference याद रखें।
If employee training is kept later and a new system is implemented first in a programme what is the risk?यदि कार्यक्रम में कर्मचारियों का प्रशिक्षण बाद में और नई प्रणाली पहले लागू कर दी गई तो क्या जोखिम है?
Correct answer:सही उत्तर:A
The direct answer is option A: Errors in use and resistance may increase. A new system often requires people to learn new steps, tools, or responsibilities. Training before implementation helps employees understand the purpose, practise the process, and ask questions. Step by step, the programme should provide training, allow practice or testing, implement the system, and then review performance. If implementation comes first and training is delayed, employees may use the system incorrectly, feel confused, lose confidence, or resist the change. Option A is therefore correct. Option B is wrong because poor sequencing never guarantees zero cost; mistakes can create extra costs. Option C is wrong because customers cannot be assumed to become immediately satisfied when employees are unprepared. Option D is wrong because a policy requires conscious formulation and approval; it does not form automatically. Exam cue: prepare and train people before major implementation whenever the programme requires new skills.सीधा उत्तर विकल्प A है: प्रयोग में त्रुटियां और प्रतिरोध बढ़ सकते हैं। नई प्रणाली में कर्मचारियों को नए चरण, उपकरण या जिम्मेदारियां सीखनी पड़ सकती हैं। लागू करने से पहले प्रशिक्षण देने पर वे उद्देश्य समझते हैं, प्रक्रिया का अभ्यास करते हैं और प्रश्न पूछ सकते हैं। सही क्रम है: पहले प्रशिक्षण, फिर अभ्यास या परीक्षण, उसके बाद प्रणाली लागू करना और अंत में परिणाम की समीक्षा करना। यदि प्रणाली पहले लागू कर दी जाए और प्रशिक्षण बाद में हो, तो कर्मचारी गलत प्रयोग कर सकते हैं, भ्रमित हो सकते हैं, आत्मविश्वास खो सकते हैं या बदलाव का विरोध कर सकते हैं। इसलिए विकल्प A सही है। विकल्प B गलत है, क्योंकि गलत क्रम से लागत शून्य होने की गारंटी नहीं होती; गलतियों से अतिरिक्त खर्च हो सकता है। विकल्प C गलत है, क्योंकि बिना तैयारी के कर्मचारियों से ग्राहक तुरंत संतुष्ट होंगे, ऐसा निश्चित नहीं है। विकल्प D गलत है, क्योंकि नीति सोच-विचार और औपचारिक निर्णय से बनती है, अपने-आप नहीं। परीक्षा संकेत: नई प्रणाली लागू करने से पहले लोगों को प्रशिक्षित करें।
What problem may occur if stakeholders are not identified in a programme?कार्यक्रम में हितधारकों की पहचान न करने से क्या समस्या हो सकती है?
Correct answer:सही उत्तर:A
The direct answer is A, the needs and support of important people may be missed. Stakeholders are people or groups that affect a programme or are affected by it, such as employees, customers, suppliers, managers, owners or the community. Identifying them helps the planner understand their interests, expectations, possible objections and required support. If they are ignored, an important need may be overlooked, resistance may appear, or useful cooperation may be lost. Option A is correct. Option B is wrong because resources do not become available automatically. Option C is wrong because stakeholder identification does not guarantee that the objective is always clear. Option D is wrong because recognising stakeholders does not end expenses. The exam cue is: stakeholder analysis prevents overlooked needs and support.सीधा उत्तर A, जरूरी लोगों की जरूरत और समर्थन छूट सकता है। हितधारक वे व्यक्ति या समूह होते हैं जो कार्यक्रम को प्रभावित करते हैं या कार्यक्रम से प्रभावित होते हैं, जैसे कर्मचारी, ग्राहक, आपूर्तिकर्ता, प्रबंधक, मालिक या समुदाय। उनकी पहचान करने से उनकी रुचियां, अपेक्षाएं, संभावित आपत्तियां और आवश्यक सहयोग समझे जा सकते हैं। यदि उन्हें पहचाना न जाए, तो कोई महत्वपूर्ण जरूरत अनदेखी रह सकती है, विरोध उत्पन्न हो सकता है या उपयोगी सहयोग खो सकता है। विकल्प A सही है। विकल्प B गलत है क्योंकि संसाधन अपने आप उपलब्ध नहीं होते। विकल्प C गलत है क्योंकि हितधारकों की पहचान करने से लक्ष्य हमेशा स्पष्ट होने की गारंटी नहीं मिलती। विकल्प D गलत है क्योंकि हितधारकों को पहचानने से खर्च समाप्त नहीं होता। परीक्षा-सूत्र: stakeholder analysis से छूटी जरूरतें और सहयोग पहचाने जाते हैं।
If success criteria are not fixed earlier in a programme what problem will arise in evaluation?यदि कार्यक्रम में सफलता मानदंड पहले तय न हों तो मूल्यांकन में क्या समस्या आएगी?
Correct answer:सही उत्तर:A
Evaluation requires pre-decided success criteria or standards. Without them, actual results cannot be compared with expected results, so the extent of the programme's success remains unclear. Reduced cost or immediate termination of activities is not a direct result of missing criteria. Exam tip: Distinguish between a programme's objectives and the criteria used to measure its success.मूल्यांकन के लिए पहले से तय सफलता मानदंड या मापदंड आवश्यक होते हैं। इनके बिना वास्तविक परिणामों की तुलना अपेक्षित परिणामों से नहीं की जा सकती, इसलिए यह स्पष्ट नहीं होगा कि कार्यक्रम कितना सफल रहा। लागत कम होना या गतिविधियों का समाप्त होना मानदंड तय न होने का प्रत्यक्ष परिणाम नहीं है। परीक्षा टिप: योजना के प्रत्येक कार्यक्रम में उद्देश्य और सफलता-मापदंड को अलग-अलग पहचानें।
Why can over allocation of resources in a programme also create a problem?कार्यक्रम में संसाधन अधिक आवंटित करने से भी समस्या क्यों हो सकती है?
Correct answer:सही उत्तर:A
Excess resources can also create opportunity cost. Remember efficient resource allocation in exams.अधिक संसाधन भी opportunity cost पैदा कर सकते हैं। परीक्षा में efficient resource allocation याद रखें।
If programme activities are on time but team fatigue is reducing quality what should be checked?यदि कार्यक्रम में समय पर कार्य पूरे हो रहे हैं पर टीम थकान से गुणवत्ता गिर रही है तो क्या जांचना चाहिए?
Correct answer:सही उत्तर:A
Direct answer: Option A, workload and resource balance. A programme is not successful merely because activities finish on time. It must also protect quality, people and available resources. Here, timely completion is happening, but fatigue is lowering quality. Step 1: identify the warning sign, which is team fatigue. Step 2: connect fatigue with excessive workload, insufficient staff, poor scheduling, inadequate breaks or unsuitable resource allocation. Step 3: review whether the amount of work and the available human and other resources are properly balanced. Step 4: adjust duties, staffing, timing, rest periods or resources so that quality can improve. Option A is correct because it examines both the cause and the practical remedy. Option B, only date, is wrong because dates show when work is planned or completed, but they do not explain tiredness or falling quality. Option C, company colour, has no meaningful connection with workload, employee fatigue or product quality. Option D, number of rules, may matter in some administrative context, but simply counting rules will not reveal whether the team is overloaded or lacks resources. The key lesson is that programme control includes time, cost, resources, people and quality together. Memory cue: on-time work plus tired workers means check workload and resources, not just the calendar.सीधा उत्तर: विकल्प A, कार्यभार और संसाधन संतुलन। किसी कार्यक्रम की सफलता केवल इस बात से तय नहीं होती कि काम समय पर पूरा हुआ या नहीं। कर्मचारियों का स्वास्थ्य, उनकी क्षमता और काम की गुणवत्ता भी देखनी होती है। यहाँ पहला संकेत टीम की थकान है। चरण 1: देखें कि गुणवत्ता क्यों गिर रही है। चरण 2: थकान को अधिक कार्यभार, कम कर्मचारियों, गलत समय-सारणी, पर्याप्त विश्राम न मिलने या संसाधनों के गलत बँटवारे से जोड़ें। चरण 3: जाँचें कि उपलब्ध मानव संसाधन और अन्य साधनों की तुलना में काम बहुत अधिक तो नहीं है। चरण 4: आवश्यकता हो तो काम बाँटें, अतिरिक्त कर्मचारी लगाएँ, समय बदलें, विश्राम दें या संसाधनों का बेहतर उपयोग करें। विकल्प A सही है क्योंकि यह समस्या के वास्तविक कारण और उसके समाधान दोनों की जाँच करता है। विकल्प B, केवल तारीख, गलत है; तारीख समय बताती है, थकान और गुणवत्ता गिरने का कारण नहीं। विकल्प C, कंपनी का रंग, इस समस्या से संबंधित नहीं है। विकल्प D, नियमों की संख्या, केवल नियम गिनती है और यह नहीं बताती कि टीम पर काम का बोझ कितना है। याद रखें: कार्यक्रम में समय के साथ गुणवत्ता और मानव क्षमता भी देखी जाती है। परीक्षा संकेत: काम समय पर हो लेकिन लोग थक रहे हों, तो workload और resources जाँचें।
If customer feedback is not taken during a programme which improvement opportunity will be lost?यदि कार्यक्रम के दौरान ग्राहक प्रतिक्रिया न ली जाए तो किस सुधार अवसर का नुकसान होगा?
Correct answer:सही उत्तर:A
Customer feedback tells the organiser what participants actually experienced, needed, liked, or found difficult during the programme. It connects planning with real conditions instead of allowing the programme to continue only according to assumptions. Feedback may reveal that the timing, content, facilities, communication, or activities need improvement. Thus, collecting it is an important part of making a programme useful and effective.
If feedback is not taken, the organiser loses the opportunity to identify practical problems and improve the programme according to genuine needs. Option A is correct because it directly describes this lost opportunity. Increasing expenses, removing objectives, or hiding rules are not natural purposes of customer feedback. Feedback supports correction, better service, and closer achievement of programme objectives.ग्राहक प्रतिक्रिया से आयोजक को पता चलता है कि प्रतिभागियों ने कार्यक्रम को वास्तव में कैसा अनुभव किया, उन्हें क्या आवश्यकता थी, क्या अच्छा लगा और कौन-सी कठिनाई हुई। इससे योजना केवल अनुमान पर निर्भर नहीं रहती, बल्कि वास्तविक परिस्थितियों के अनुसार सुधारी जा सकती है। प्रतिक्रिया से समय, सामग्री, सुविधाओं, सूचना या गतिविधियों में सुधार की आवश्यकता सामने आ सकती है। इसलिए यह कार्यक्रम को उपयोगी और प्रभावी बनाने का महत्वपूर्ण साधन है।
यदि प्रतिक्रिया न ली जाए, तो आयोजक वास्तविक समस्याओं को पहचानने और कार्यक्रम को लोगों की जरूरत के अनुसार बेहतर बनाने का अवसर खो देता है। इसलिए विकल्प A सही है। खर्च बढ़ाना, लक्ष्य हटाना या नियम छिपाना ग्राहक प्रतिक्रिया के उचित परिणाम नहीं हैं। प्रतिक्रिया सुधार, बेहतर सेवा और कार्यक्रम के उद्देश्यों की प्राप्ति में सहायता करती है।
If the objective of a programme is to increase sales but activities focus only on internal decoration what is the weakness?यदि कार्यक्रम का उद्देश्य बिक्री बढ़ाना है पर गतिविधियां केवल आंतरिक सजावट पर केंद्रित हैं तो क्या कमी है?
Correct answer:सही उत्तर:A
Activities in a programme should directly contribute to achieving its objective. To increase sales, suitable activities may include promotion, customer contact, sales training, or improving distribution; internal decoration alone is not directly connected with the sales objective. Hence, the weakness is a mismatch between objectives and activities. Resource adequacy, scheduling, and clear responsibilities may matter, but they do not identify this central defect. Exam tip: while evaluating a programme, first check whether every activity supports its stated objective.कार्यक्रम में निर्धारित गतिविधियाँ उसके उद्देश्य की प्राप्ति में सीधे सहायक होनी चाहिए। बिक्री बढ़ाने के लिए प्रचार, ग्राहक सम्पर्क, विक्रय-प्रशिक्षण या वितरण सुधार जैसी गतिविधियाँ उपयुक्त हैं; केवल आंतरिक सजावट सामान्यतः बिक्री-उद्देश्य से प्रत्यक्ष रूप से नहीं जुड़ती। इसलिए यहाँ उद्देश्य और गतिविधियों के बीच असंगति है। संसाधनों, समय या उत्तरदायित्वों की स्पष्टता उपयोगी हो सकती है, पर वे इस मूल दोष को नहीं दर्शाते। परीक्षा टिप: कार्यक्रम का मूल्यांकन करते समय पहले उद्देश्य और प्रत्येक गतिविधि का संबंध जाँचें।
When can keeping legal permission as the last step in a programme be risky?कार्यक्रम में कानूनी अनुमति को अंतिम चरण में रखना कब खतरनाक हो सकता है?
Correct answer:सही उत्तर:A
Prerequisites like legal permission must be placed in proper sequence. Remember prerequisites in exams.कानूनी अनुमति जैसे पूर्व शर्तों को सही क्रम में रखना जरूरी है। परीक्षा में prerequisites याद रखें।
If technical equipment is purchased in a programme but no maintenance plan exists what is the risk?यदि कार्यक्रम में तकनीकी उपकरण खरीदे गए पर रखरखाव योजना नहीं है तो कौन सा जोखिम है?
Correct answer:सही उत्तर:A
Buying technical equipment is only one part of using that resource successfully. Equipment may need inspection, cleaning, software updates, spare parts, calibration, repairs, and trained people to operate it safely. Without a maintenance plan, a small fault can stop an important activity, delay the programme, increase costs, or prevent the objective from being achieved. Planning for support after purchase makes the resource dependable over time.
Option A is correct because equipment failure can disrupt the programme when no maintenance arrangements exist. A purchase does not automatically remove costs, eliminate training, or guarantee success. Therefore, options B, C, and D are unreasonable. The important planning lesson is that resources require continuing support, not merely an initial purchase. Maintenance schedules, responsibility, funds, and technical assistance should be considered in advance.तकनीकी उपकरण खरीद लेना ही संसाधन का पूरा प्रबंध नहीं है। उपकरण की जाँच, सफाई, सॉफ्टवेयर अद्यतन, स्पेयर पार्ट्स, मरम्मत, सही समायोजन और सुरक्षित संचालन के लिए प्रशिक्षित लोगों की आवश्यकता हो सकती है। रखरखाव की योजना न होने पर छोटी खराबी भी महत्वपूर्ण गतिविधि रोक सकती है, कार्यक्रम में देरी कर सकती है और खर्च बढ़ा सकती है। खरीद के बाद की सहायता से संसाधन लंबे समय तक उपयोगी रहता है।
विकल्प A सही है, क्योंकि रखरखाव न होने पर उपकरण खराब होने से कार्यक्रम बाधित हो सकता है। खरीद से सभी लागत समाप्त नहीं होतीं, प्रशिक्षण अनावश्यक नहीं होता और लक्ष्य अपने आप पूरा नहीं होता। इसलिए B, C और D गलत हैं। योजना बनाते समय रखरखाव का समय, जिम्मेदारी, धन और तकनीकी सहायता पहले से तय करनी चाहिए।
If only an initial meeting is held in a programme and no follow up is fixed what is missing?यदि कार्यक्रम में केवल प्रारंभिक बैठक हुई और आगे follow up तय नहीं है तो क्या कमी है?
Correct answer:सही उत्तर:A
An initial meeting alone cannot ensure that a programme is carried out as planned. Follow-up provides continuous review and control by checking progress, identifying difficulties, and taking corrective action. An oral instruction may communicate a direction, but it does not monitor implementation. Exam tip: link follow-up in a programme with monitoring, review, and corrective action.कार्यक्रम को प्रभावी बनाने के लिए केवल प्रारंभिक बैठक पर्याप्त नहीं होती। follow up के माध्यम से कार्य की प्रगति की जाँच, समस्याओं की पहचान और आवश्यक सुधार किए जाते हैं; इसलिए निरंतर समीक्षा और नियंत्रण आवश्यक है। मौखिक आदेश केवल निर्देश देने का तरीका है, वह प्रगति की निगरानी का विकल्प नहीं है। परीक्षा टिप: कार्यक्रम में कार्यान्वयन के बाद monitoring, review और corrective action को follow up से जोड़कर याद रखें।
Why is balance between confidentiality and communication necessary in a programme?कार्यक्रम में गोपनीयता और संचार के बीच संतुलन क्यों आवश्यक है?
Correct answer:सही उत्तर:A
Information is necessary to implement a programme but sensitive information should be controlled. Remember balanced communication in exams.कार्यक्रम लागू करने के लिए सूचना जरूरी है लेकिन संवेदनशील सूचना नियंत्रित होनी चाहिए। परीक्षा में balanced communication याद रखें।
If final result of a programme is good but rules were violated in the process what conclusion is appropriate?यदि कार्यक्रम में अंतिम परिणाम अच्छा है लेकिन प्रक्रिया में नियमों का उल्लंघन हुआ है तो क्या निष्कर्ष उचित है?
Correct answer:सही उत्तर:A
Both result and process are important in a programme. Include compliance in evaluation in exams.कार्यक्रम में परिणाम और प्रक्रिया दोनों महत्वपूर्ण होते हैं। परीक्षा में compliance को evaluation में शामिल करें।
What is the deepest analytical value of a programme?कार्यक्रम का सबसे गहरा विश्लेषणात्मक मूल्य क्या है?
Correct answer:सही उत्तर:A
A programme makes planning executable and helps coordination and control. Understand programme as an integrated execution plan in exams.कार्यक्रम योजना को क्रियान्वयन योग्य बनाकर समन्वय और नियंत्रण में मदद करता है। परीक्षा में programme को integrated execution plan समझें।
Google Analytics helps us understand site usage. Google may send limited cookie-free signals before your choice. The Live Visitors widget operates independently of this analytics choice; see the privacy policy for its provider and fallback details. Essential site features work without analytics cookies. You can change your choice later in Privacy choices. Privacy policy