Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है
In Class 12 Business Studies, the topic “Programme” explains a detailed plan designed to achieve a specific objective. Students learn how a programme brings together related policies, procedures, rules, tasks and the sequence in which activities should be performed. They also understand how programmes guide action, allocate time and resources, coordinate efforts, and reduce uncertainty in the planning process. The topic highlights why programmes are more specific and action-oriented than broad plans such as objectives or strategies.
Expert · Level 4 · 25 questions
TOPIC PRACTICE
Quiz this set
Up to 25 questions from this page. Select your focus, then start.
25 questions
Choose questions
View options
Decisions may slow and plan may become complex
All work will become simple automatically
Budget will not be needed
Responsibility will end
View options
Unclear implementation
Greater flexibility in decision-making
Automatic surplus of resources
Work cost becoming zero
View options
Misalignment between objective and activity
Time control
Resource availability
Progress review
View options
Results may not remain sustainable in long run
All expenses will end
Employees will always be motivated
Resources will renew automatically
View options
Managerial trade off decision
Standing rule
Aimless expense
Resource surplus
View options
Cost saving occurred but risk was ignored
Programme is fully successful
Safety has no relation with programme
Zero expense is the only objective
View options
Cost monitoring and cause analysis
Removing objective
Stopping communication
Ending review
View options
Practical difficulties may be missed
Targets will always be more acceptable
Resources will increase automatically
Programme will be without expense
View options
Strategic direction and resource approval will be weak
All work will complete automatically
Cost will be zero
Review will be unnecessary
View options
Stress and quality decline
Complete morale increase
Automatic zero cost
End of all risks
View options
Intermediate progress and problems will not be identified on time
The programme objective will be achieved automatically
The programme cost will always decrease
Resources will become unlimited
View options
Lack of coordinated communication
Success of standing rule
Complete cost control
Resource surplus
View options
Preparation and prevention cannot be done in advance
Every risk ends automatically
There is no risk in programme
Resources are always unlimited
View options
Clear authority limits and a faster approval system
Completely removing all approval requirements from the programme
Keeping no record of approvals
Making all programme-related information public
View options
Expense and resource use may become uncontrolled
Objective will end automatically
Deadline will be removed
Quality will surely increase
View options
Legality or implementation may be obstructed
Programme will automatically speed up
Expense will surely fall
Need for rules will end
View options
Imbalance between responsibility and authority
Zero expense
Complete control
Cash surplus
View options
Implementation happened but objective impact remained incomplete
Programme was fully successful
Review is not needed
Cost is the only standard
View options
All plans should align toward the same objective
All plans should move in different directions
Budget should be removed
Responsibility should remain unclear
View options
Absence of needs analysis
Inadequate allocation of resources
Error in cost estimation
Delay in scheduling
View options
Sustainability may weaken despite short term success
Programme will always be permanently successful
Cost will never increase
Quality will surely increase
View options
Later errors and quality deterioration will not be detected
All stages of the programme will become standardised automatically
The need for resources will end
The cost of the programme will become zero
View options
It will be unclear which activity is costly or inefficient
Objective will be achieved immediately
All expenses will decrease
Deadline will be removed
View options
Final stages may remain incomplete or weak
Programme will complete automatically
Expense will always remain zero
Review will not be needed
View options
It links activity sequence resources responsibility risk communication and control for a specific objective in an execution framework
It is only a standing rule
It is only an expense list
It is a general idea without action
Question 1ExpertLevel 4
What managerial problem can arise from too much detailing in a programme?कार्यक्रम में बहुत अधिक विस्तार रखने से कौन सी प्रबंधकीय समस्या हो सकती है?
Correct answer:सही उत्तर:A
Direct answer: Option A, decisions may slow and the plan may become complex. A programme should contain enough detail to guide action, but it should not become unnecessarily overloaded with tiny instructions. Step 1: understand that more detail requires more time to prepare, explain, update and monitor. Step 2: notice that excessive detail can create paperwork and make important priorities harder to see. Step 3: recognise possible effects: slower decisions, confused communication, difficulty in changing the plan and increased administrative burden. Therefore, the manager should keep the necessary details while maintaining clarity and flexibility. Option A is correct because too much detail can reduce simplicity and speed. Option B, all work will automatically become simple, is wrong: detail does not guarantee simplicity and may actually make work harder to understand. Option C, budget will not be needed, is wrong because detailed planning still requires money and resource estimates. Option D, responsibility will end, is wrong because assigning responsibility remains necessary; detail may even make roles clearer, although excessive detail can create confusion. The correct principle is balance: a useful programme is clear, sufficiently detailed and manageable. Memory cue: detail should guide action, not bury the action in paperwork.सीधा उत्तर: विकल्प A, निर्णय धीमे हो सकते हैं और योजना जटिल बन सकती है। किसी कार्यक्रम में काम समझाने के लिए पर्याप्त विवरण होना चाहिए, लेकिन बहुत छोटी-छोटी बातों का अनावश्यक विस्तार नहीं होना चाहिए। चरण 1: समझें कि हर अतिरिक्त विवरण लिखने, समझाने, बदलने और जाँचने में समय लगता है। चरण 2: देखें कि अत्यधिक विवरण से कागजी काम बढ़ता है और मुख्य प्राथमिकताएँ छिप सकती हैं। चरण 3: इसके परिणाम पहचानें—निर्णय लेने में देरी, संचार में भ्रम, योजना बदलने में कठिनाई और प्रशासनिक बोझ। इसलिए प्रबंधक को आवश्यक विवरण रखना चाहिए, पर योजना को सरल और लचीला भी बनाए रखना चाहिए। विकल्प A सही है। विकल्प B गलत है, क्योंकि अधिक विवरण से काम अपने आप सरल नहीं होता; कई बार समझना और कठिन हो जाता है। विकल्प C गलत है, क्योंकि विस्तृत योजना में भी बजट और संसाधनों की आवश्यकता रहती है। विकल्प D गलत है, क्योंकि जिम्मेदारी समाप्त नहीं होती; सही विवरण जिम्मेदारियाँ स्पष्ट कर सकता है, पर बहुत अधिक विवरण भ्रम पैदा कर सकता है। मुख्य नियम है—विवरण इतना हो कि मार्गदर्शन मिले, बोझ न बने। परीक्षा संकेत: detail और simplicity का संतुलन याद रखें।
If a programme is too brief and does not state method of activities what problem will occur?यदि कार्यक्रम बहुत संक्षिप्त है और कार्यों का तरीका नहीं बताता तो कौन सी समस्या होगी?
Correct answer:सही उत्तर:A
A programme should give adequate clarity about the sequence, timing and method of activities. If it is too brief and does not state how work is to be done, employees may not know how to carry out the activities; therefore, implementation becomes unclear. Greater decision-making flexibility is not a direct consequence of a brief programme. Exam tip: Remember that insufficient programme details lead to unclear implementation.कार्यक्रम में कार्यों का क्रम, समय और उन्हें करने की विधि पर्याप्त स्पष्ट होनी चाहिए। यदि कार्यक्रम बहुत संक्षिप्त हो तथा कार्य-विधि न बताए, तो कर्मचारियों को यह समझने में कठिनाई होगी कि काम कैसे किया जाए; इसलिए क्रियान्वयन में अस्पष्टता उत्पन्न होगी। निर्णय लेने का लचीलापन कार्यक्रम की संक्षिप्तता का प्रत्यक्ष परिणाम नहीं है। परीक्षा टिप: कार्यक्रम की कमी लिखते समय ‘अपर्याप्त विवरण से क्रियान्वयन अस्पष्ट’ बिंदु याद रखें।
If the objective of a programme is social service but activities focus only on brand promotion what is the defect?यदि कार्यक्रम का उद्देश्य समाज सेवा है पर गतिविधियां केवल ब्रांड प्रचार पर केंद्रित हैं तो क्या दोष है?
Correct answer:सही उत्तर:A
Activities should match the stated objective. Link alignment with programme effectiveness in exams.गतिविधियां घोषित उद्देश्य से मेल खानी चाहिए। परीक्षा में alignment को programme effectiveness से जोड़ें।
If there is no maintenance plan after completion of a project in a programme what risk exists?यदि कार्यक्रम में परियोजना समाप्ति के बाद रखरखाव की योजना नहीं है तो कौन सा जोखिम है?
Correct answer:सही उत्तर:A
The direct answer is A: results may not remain sustainable in the long run. Completing a project is not always the end of its usefulness. Equipment may need servicing, staff may need support, systems may require updates, and users may need training. A maintenance plan provides the people, money, schedule, and responsibilities needed to keep the project working after completion. Without it, the project may work initially but deteriorate later, stop functioning, or fail to provide continuing benefits. Option A correctly identifies the long-term sustainability risk. Option B, all expenses will end, is not a safe conclusion: maintenance itself usually requires continuing expenditure, and absence of a plan does not make all costs disappear. Option C, employees will always be motivated, is unsupported and is unlikely to follow from missing maintenance. Option D, resources will renew automatically, is unrealistic; resources generally need planned replacement, repair, replenishment, or funding. The reasoning is: project completion creates an output; continued benefit requires support; no support plan creates deterioration risk; therefore sustainability is threatened. Exam cue: ask what happens after completion, not only whether the project was delivered.सीधा उत्तर A है: लंबे समय में परिणाम टिकाऊ नहीं रहेंगे। किसी परियोजना का पूरा हो जाना हमेशा उसके लाभ के समाप्त होने या स्थायी बने रहने की गारंटी नहीं देता। उपकरणों की मरम्मत, कर्मचारियों का सहयोग, प्रणाली का अद्यतन और उपयोगकर्ताओं का प्रशिक्षण बाद में भी आवश्यक हो सकता है। रखरखाव योजना में जिम्मेदार व्यक्ति, समय-सारणी, धन और आवश्यक कार्य तय किए जाते हैं। यदि ऐसी योजना नहीं है, तो परियोजना शुरुआत में सफल दिख सकती है, लेकिन बाद में खराब हो सकती है, बंद हो सकती है या लगातार लाभ देना बंद कर सकती है। इसलिए विकल्प A सही है और यह दीर्घकालीन sustainability का जोखिम बताता है। विकल्प B, सभी खर्च समाप्त हो जाएंगे, गलत या अधूरा है; रखरखाव के लिए आगे भी खर्च चाहिए हो सकता है और योजना का न होना खर्चों के समाप्त होने का प्रमाण नहीं है। विकल्प C, कर्मचारी हमेशा प्रेरित होंगे, प्रश्न की स्थिति से सिद्ध नहीं होता और रखरखाव की कमी से ऐसा निष्कर्ष नहीं निकलता। विकल्प D, संसाधन अपने आप नवीकृत होंगे, अवास्तविक है; संसाधनों की मरम्मत, बदली या पूर्ति के लिए योजना और धन चाहिए। तर्क है: परियोजना से परिणाम मिला, परिणाम जारी रखने के लिए समर्थन चाहिए, समर्थन योजना नहीं है, इसलिए टिकाऊपन खतरे में है। परीक्षा में केवल परियोजना पूरी होने पर नहीं, बल्कि उसके बाद की व्यवस्था पर भी ध्यान दें।
How should conflict among time cost and quality in a programme be understood?कार्यक्रम में समय लागत और गुणवत्ता के संघर्ष को किस रूप में समझना चाहिए?
Correct answer:सही उत्तर:A
A balanced decision may be needed among time cost and quality. Remember trade off analysis in exams.समय लागत और गुणवत्ता में संतुलित निर्णय लेना पड़ सकता है। परीक्षा में trade off analysis याद रखें।
If necessary safety measures are removed to keep programme cost low what will be the evaluation?यदि कार्यक्रम में लागत कम रखने के लिए आवश्यक सुरक्षा उपाय हटाए गए तो क्या मूल्यांकन होगा?
Correct answer:सही उत्तर:A
The direct answer is A: cost saving occurred, but risk was ignored. A programme is not successful merely because it spends less money. It must achieve its purpose safely and responsibly. Step by step: first identify the objective, then check the resources and activities, and finally evaluate results, safety and possible risks. Removing necessary safety measures may reduce immediate cost, but it can cause accidents, legal problems, loss of trust and failure of the programme’s real objective. Option A is correct because it recognises both the saving and the serious weakness. Option B is wrong because low cost alone cannot make a programme fully successful. Option C is wrong because safety is connected with responsible planning and implementation. Option D is wrong because zero expense is impossible and is not the only objective. Memory cue: economy is useful only when it does not destroy safety or effectiveness.सीधा उत्तर A है: लागत की बचत हुई, लेकिन जोखिम की अनदेखी की गई। कोई कार्यक्रम केवल इसलिए सफल नहीं कहलाता कि उसमें कम पैसा खर्च हुआ। उसे अपना उद्देश्य सुरक्षित और जिम्मेदारी से पूरा करना चाहिए। क्रम समझें: पहले उद्देश्य पहचानें, फिर गतिविधियों और संसाधनों की जाँच करें, और अंत में परिणाम, सुरक्षा तथा संभावित जोखिमों का मूल्यांकन करें। आवश्यक सुरक्षा उपाय हटाने से तुरंत खर्च घट सकता है, लेकिन दुर्घटना, कानूनी समस्या, लोगों का विश्वास कम होना और कार्यक्रम के वास्तविक उद्देश्य की विफलता हो सकती है। विकल्प A सही है क्योंकि वह बचत और गंभीर कमी दोनों बताता है। विकल्प B गलत है, क्योंकि कम लागत अकेले पूर्ण सफलता नहीं बनाती। विकल्प C गलत है, क्योंकि सुरक्षा जिम्मेदार योजना और क्रियान्वयन से जुड़ी है। विकल्प D गलत है, क्योंकि शून्य खर्च न तो व्यावहारिक है और न ही एकमात्र लक्ष्य। याद रखें: बचत तभी अच्छी है जब सुरक्षा और प्रभावशीलता नष्ट न हों।
If all programme activities are on time but expense is rising rapidly which control is necessary?यदि कार्यक्रम के सभी कार्य समय पर हैं पर खर्च बहुत तेजी से बढ़ रहा है तो कौन सा नियंत्रण जरूरी है?
Correct answer:सही उत्तर:A
Timely work is not enough expense must also be controlled. Remember time cost monitoring in exams.समय पर काम होना पर्याप्त नहीं खर्च भी नियंत्रित होना चाहिए। परीक्षा में time cost monitoring याद रखें।
If only senior managers make the programme and do not take information from workers what is the risk?यदि कार्यक्रम में केवल वरिष्ठ प्रबंधक योजना बनाते हैं और कार्य करने वाले लोगों से सूचना नहीं लेते तो क्या जोखिम है?
Correct answer:सही उत्तर:A
People doing the work can provide real obstacle information. Remember participation and practicality in exams.कार्य करने वाले लोग वास्तविक बाधाओं की जानकारी दे सकते हैं। परीक्षा में participation and practicality याद रखें।
If people doing the work are involved but top approval is absent in a programme what weakness will occur?यदि कार्यक्रम में कार्य करने वाले लोग शामिल हैं पर शीर्ष स्वीकृति नहीं है तो कौन सी कमी होगी?
Correct answer:सही उत्तर:A
A programme needs both practical information and top support. Remember participation plus approval in exams.कार्यक्रम को व्यवहारिक सूचना और शीर्ष समर्थन दोनों चाहिए। परीक्षा में participation plus approval याद रखें।
If deadline in a programme is much shorter than real capacity what behavioural effect is possible?यदि कार्यक्रम में समय सीमा वास्तविक क्षमता से बहुत कम है तो कौन सा व्यवहारिक प्रभाव संभव है?
Correct answer:सही उत्तर:A
A programme should set a deadline that matches the real capacity of the people, resources and process involved. A deadline that is too short may appear ambitious, but it can create pressure instead of improving performance. Continuous pressure may cause anxiety, fatigue, hurried decisions and reduced attention to detail. These effects can lower the quality of work and may also reduce cooperation within the team.
Therefore, option A is correct because an unrealistic deadline can produce stress and quality decline. The other choices are not reasonable consequences: morale does not automatically rise, costs do not automatically become zero, and risks are not removed. Good planning uses a realistic time limit, monitors progress and allows suitable time for checking and correction.किसी कार्यक्रम की समय-सीमा उसमें लगे लोगों, संसाधनों और कार्यविधि की वास्तविक क्षमता के अनुसार होनी चाहिए। यदि समय बहुत कम रखा जाए, तो यह महत्वाकांक्षी लग सकता है, पर काम करने वालों पर अनावश्यक दबाव पड़ता है। लगातार दबाव से तनाव, थकान, जल्दबाजी और छोटी बातों पर ध्यान न देने की समस्या हो सकती है। इससे काम की गुणवत्ता घट सकती है और टीम का सहयोग भी प्रभावित हो सकता है।
इसलिए विकल्प A सही है, क्योंकि अवास्तविक समय-सीमा तनाव और गुणवत्ता में गिरावट ला सकती है। अन्य विकल्प उचित परिणाम नहीं हैं: मनोबल अपने-आप नहीं बढ़ता, लागत शून्य नहीं होती और सभी जोखिम समाप्त नहीं होते। अच्छे नियोजन में वास्तविक समय, प्रगति की जाँच और सुधार के लिए पर्याप्त अवसर रखा जाता है।
If success of a programme is checked only on the final day why will the role of milestones reduce?यदि कार्यक्रम में सफलता केवल अंतिम दिन जांची जाती है तो माइलस्टोन की भूमिका क्यों कम हो जाएगी?
Correct answer:सही उत्तर:A
Milestones are key checkpoints fixed during the programme. They help identify progress, delays and problems in time so that corrective action can be taken. If success is checked only on the final day, intermediate review loses its purpose and problems may be detected too late. Options B, C and D are not functions of milestones. Exam tip: associate milestones with interim progress review and timely control.माइलस्टोन कार्यक्रम के बीच में तय किए गए प्रमुख जांच-बिंदु होते हैं। इनके माध्यम से प्रगति, देरी या समस्याओं का समय पर पता लगाकर सुधारात्मक कार्रवाई की जा सकती है। यदि सफलता केवल अंतिम दिन जांची जाए, तो मध्यवर्ती समीक्षा का उपयोग नहीं रह जाता और समस्याएँ बहुत देर से सामने आती हैं। विकल्प B, C और D माइलस्टोन के कार्य से संबंधित नहीं हैं। परीक्षा टिप: माइलस्टोन को मध्यवर्ती प्रगति-जांच और समय पर नियंत्रण से जोड़कर याद रखें।
If two departments send different messages to the same customer in a programme what weakness is shown?यदि कार्यक्रम में दो विभाग एक ही ग्राहक को अलग संदेश भेजते हैं तो कौन सी कमी दिखती है?
Correct answer:सही उत्तर:A
Inconsistent messages can reduce programme credibility. Remember communication consistency in exams.असंगत संदेश कार्यक्रम की विश्वसनीयता घटा सकता है। परीक्षा में communication consistency याद रखें।
Why is it a weak approach to consider risk only after a problem occurs in a programme?कार्यक्रम में जोखिम को केवल समस्या आने के बाद देखना क्यों कमजोर दृष्टिकोण है?
Correct answer:सही उत्तर:A
Risk management should begin before difficulties appear. A programme may face delays, shortages, accidents, technical failures, or other uncertainties. If the team waits until a problem has already happened, it loses valuable time and may have fewer choices for controlling the damage. Early attention allows the team to identify possible risks, estimate their effects, assign responsibility, and prepare preventive or alternative actions.
For example, arranging a backup supplier before materials become unavailable is stronger than searching for one after work stops. The other choices are unreasonable: risks do not disappear automatically, programmes can contain risks, and resources are not always unlimited. Therefore, option A is correct because considering risk in advance makes preparation and prevention possible and supports more reliable programme implementation.जोखिम प्रबंधन कठिनाई आने के बाद नहीं, बल्कि उससे पहले शुरू होना चाहिए। किसी कार्यक्रम में देरी, सामग्री की कमी, दुर्घटना, तकनीकी खराबी या अन्य अनिश्चितताएँ हो सकती हैं। यदि दल समस्या होने तक प्रतीक्षा करता है, तो तैयारी का समय कम हो जाता है और नुकसान को नियंत्रित करने के विकल्प भी घट सकते हैं। पहले से जोखिम पहचानने पर उसके प्रभाव का अनुमान, जिम्मेदारी का निर्धारण और बचाव या वैकल्पिक उपाय किए जा सकते हैं।
उदाहरण के लिए, सामग्री की कमी होने से पहले दूसरे आपूर्तिकर्ता की व्यवस्था करना, काम रुकने के बाद खोज शुरू करने से बेहतर है। बाकी विकल्प तर्कहीन हैं, क्योंकि जोखिम अपने-आप समाप्त नहीं होते, कार्यक्रमों में जोखिम हो सकते हैं और संसाधन हमेशा असीमित नहीं होते। इसलिए विकल्प A सही है।
If approval process in a programme is very slow which system can help?यदि कार्यक्रम में स्वीकृति प्रक्रिया बहुत धीमी है तो कौन सी प्रणाली मदद कर सकती है?
Correct answer:सही उत्तर:A
When approvals are delayed in a programme, clear authority limits identify which level of manager can approve each decision. This reduces unnecessary forwarding of files and speeds up decisions. Removing every approval, however, can weaken control and accountability. Exam tip: For approval delays, look for delegation of authority and a clearly defined approval process.कार्यक्रम में स्वीकृति में देरी होने पर स्पष्ट अधिकार-सीमाएँ तय करने से यह निश्चित होता है कि किस स्तर का अधिकारी किस निर्णय को मंजूरी देगा। इससे अनावश्यक फाइल-प्रेषण और निर्णय में विलंब कम होता है। सभी अनुमोदन हटाना नियंत्रण और जवाबदेही को कमजोर कर सकता है। परीक्षा टिप: धीमी स्वीकृति का उपयुक्त समाधान अधिकारों का प्रत्यायोजन और स्पष्ट अनुमोदन-प्रक्रिया है।
If the team knows the objective but not the resource limit in a programme what problem may occur?यदि कार्यक्रम में टीम को लक्ष्य पता है लेकिन संसाधन सीमा नहीं पता तो क्या समस्या हो सकती है?
Correct answer:सही उत्तर:A
Resource limit should be clear along with objective. Remember objective and resource boundary in exams.लक्ष्य के साथ संसाधन सीमा भी स्पष्ट होनी चाहिए। परीक्षा में objective and resource boundary याद रखें।
If activities of a programme are correct but their order does not match legal and technical dependency what will happen?यदि कार्यक्रम की गतिविधियां सही हैं पर उनका क्रम कानूनी और तकनीकी निर्भरता से मेल नहीं खाता तो क्या होगा?
Correct answer:सही उत्तर:A
Correct activities can also create problems in wrong order. Remember logical sequencing in exams.सही गतिविधियां भी गलत क्रम में समस्या पैदा कर सकती हैं। परीक्षा में logical sequencing याद रखें।
Assigning work in a programme without giving authority will create which problem?कार्यक्रम में कार्य सौंपने के बाद अधिकार न देना किस समस्या को जन्म देगा?
Correct answer:सही उत्तर:A
Adequate authority is needed along with responsibility to perform work. Remember authority responsibility balance in exams.कार्य करने के लिए जिम्मेदारी के साथ पर्याप्त अधिकार भी चाहिए। परीक्षा में authority responsibility balance याद रखें।
If final customer did not get benefit but internal activities were completed what is the best conclusion?यदि कार्यक्रम में अंतिम ग्राहक को लाभ नहीं मिला पर आंतरिक गतिविधियां पूरी हो गईं तो सबसे अच्छा निष्कर्ष क्या है?
Correct answer:सही उत्तर:A
The direct answer is A: implementation happened, but the objective impact remained incomplete. A programme is not judged only by whether managers completed internal activities such as meetings, training, records or delivery steps. Its purpose is to create the intended benefit for the final customer. The reasoning is: first, internal tasks were completed; second, the customer did not receive the expected benefit; therefore, the programme achieved process completion but failed to achieve its full outcome. Option A is correct because it distinguishes activity from actual impact. Option B is wrong because full success requires the promised customer result, not merely completed internal work. Option C is wrong because the missing customer benefit is a clear reason to review, find the gap and improve implementation. Option D is wrong because cost is only one possible measure; quality, usefulness, customer satisfaction and achievement of objectives also matter. A useful exam cue is: completed activities are outputs, while customer benefit is the outcome; never treat the two as identical.सीधा उत्तर A है: कार्यान्वयन हुआ, लेकिन उद्देश्य का प्रभाव अधूरा रहा। किसी कार्यक्रम की सफलता केवल इस बात से तय नहीं होती कि कार्यालय के अंदर बैठकें, प्रशिक्षण, रिकॉर्ड या अन्य गतिविधियां पूरी हो गईं। कार्यक्रम का वास्तविक उद्देश्य अंतिम ग्राहक को अपेक्षित लाभ देना होता है। तर्क इस प्रकार है: पहला, आंतरिक कार्य पूरे हुए; दूसरा, ग्राहक को लाभ नहीं मिला; इसलिए प्रक्रिया पूरी हुई, पर परिणाम पूरा नहीं हुआ। विकल्प A सही है क्योंकि वह गतिविधि पूरी होने और वास्तविक प्रभाव के बीच अंतर बताता है। विकल्प B गलत है, क्योंकि पूर्ण सफलता के लिए ग्राहक को मिलने वाला लाभ भी आवश्यक है। विकल्प C गलत है, क्योंकि लाभ न मिलने पर समीक्षा करके कमी का कारण जानना जरूरी है। विकल्प D गलत है, क्योंकि लागत केवल एक मापदंड है; गुणवत्ता, उपयोगिता, ग्राहक संतोष और उद्देश्य-प्राप्ति भी महत्वपूर्ण हैं। परीक्षा-स्मरण रखें: गतिविधि पूरी होना output है, जबकि ग्राहक को लाभ मिलना outcome है; दोनों को समान न मानें।
What is the most important condition while combining different plans in a programme?कार्यक्रम में विभिन्न योजनाओं को जोड़ते समय सबसे महत्वपूर्ण शर्त क्या है?
Correct answer:सही उत्तर:A
Alignment of policy procedure rule and budget is necessary in a programme. Remember integrated action in exams.कार्यक्रम में policy procedure rule and budget का alignment जरूरी है। परीक्षा में integrated action याद रखें।
If services are fixed without understanding needs of beneficiaries in a programme what is the defect?यदि कार्यक्रम में लाभार्थियों की जरूरतें समझे बिना सेवाएं तय की गईं तो कौन सा दोष है?
Correct answer:सही उत्तर:A
A programme should be designed after identifying the actual needs of its beneficiaries. If services are decided without this understanding, they may be unsuitable or less useful for the target group; this is an absence of needs analysis. Resource allocation, cost estimation, and scheduling are different planning issues. Exam tip: identifying beneficiary needs is a basic starting point for programme design.कार्यक्रम बनाते समय लाभार्थियों की वास्तविक जरूरतों का अध्ययन करना आवश्यक होता है। जरूरतों को समझे बिना सेवाएं तय करने पर कार्यक्रम लक्षित लोगों के लिए अनुपयुक्त या कम उपयोगी हो सकता है; इसे आवश्यकता विश्लेषण का अभाव कहते हैं। संसाधनों का आवंटन, लागत अनुमान और समय-निर्धारण अलग योजना-संबंधी पहलू हैं। परीक्षा टिप: लाभार्थी की जरूरत पहचानना कार्यक्रम निर्माण का प्रारम्भिक आधार है।
If immediate results are desired in a programme while long term effects are ignored what risk will arise?यदि कार्यक्रम में तुरंत परिणाम चाहते हुए दीर्घकालीन प्रभावों को अनदेखा किया गया तो क्या जोखिम होगा?
Correct answer:सही उत्तर:A
A programme should consider both immediate and long term results. Remember sustainability in exams.कार्यक्रम में तात्कालिक और दीर्घकालीन परिणाम दोनों देखने चाहिए। परीक्षा में sustainability याद रखें।
If quality check is done only at the beginning of a programme and not later what danger will exist?यदि कार्यक्रम में गुणवत्ता जांच केवल शुरुआत में हुई और बाद में नहीं हुई तो कौन सा खतरा होगा?
Correct answer:सही उत्तर:A
New errors, delays, or deterioration in quality may arise while a programme is being implemented. If quality is checked only at the beginning, problems occurring in later stages may not be detected in time, preventing corrective action. Option B is incorrect because an initial check does not automatically standardise every stage. Exam tip: Link successful programme implementation with continuous monitoring and periodic quality review.कार्यक्रम के क्रियान्वयन के दौरान नई त्रुटियां, देरी या गुणवत्ता में कमी उत्पन्न हो सकती है। यदि गुणवत्ता जांच केवल प्रारम्भ में हो, तो बाद के चरणों में होने वाली ऐसी समस्याएं समय पर पता नहीं चलेंगी और सुधारात्मक कार्रवाई नहीं हो सकेगी। विकल्प B गलत है क्योंकि केवल प्रारम्भिक जांच से सभी चरण स्वतः मानकीकृत नहीं होते। परीक्षा टिप: कार्यक्रम की सफलता के लिए निरंतर निगरानी और समय-समय पर गुणवत्ता समीक्षा आवश्यक होती है।
If costs of activities are not measured separately in a programme what decision problem will occur?यदि कार्यक्रम में कार्यों की लागत अलग अलग न मापी जाए तो कौन सी निर्णय समस्या होगी?
Correct answer:सही उत्तर:A
Separate activity cost information improves correction decisions. Remember activity cost tracking in exams.गतिविधि लागत अलग जानने से सुधार निर्णय बेहतर होते हैं। परीक्षा में activity cost tracking याद रखें।
If resources are not reserved for final stages of a programme what may happen?यदि कार्यक्रम में अंतिम चरणों के लिए संसाधन बचाकर नहीं रखे गए तो क्या हो सकता है?
Correct answer:सही उत्तर:A
The direct answer is option A: Final stages may remain incomplete or weak. Resource phasing means planning and making resources available across the entire programme period, not using everything only at the beginning. Resources may include money, workers, materials, equipment, information, and time. Step by step, management lists each stage, estimates its resource need, schedules when resources will be required, reserves enough for later stages, and monitors use. If resources are not reserved, early activities may consume the budget or materials, leaving later work delayed, incomplete, or below standard. Option A is correct. Option B is wrong because a programme does not complete automatically without resources. Option C is wrong because poor resource planning cannot make expenses zero. Option D is wrong because later shortages make review more necessary, not unnecessary. Memory cue: plan resources stage by stage until closure, not only for the launch.सीधा उत्तर विकल्प A है: अंतिम चरण अधूरे या कमजोर रह सकते हैं। Resource phasing का अर्थ है पूरे कार्यक्रम की अवधि में अलग-अलग चरणों के लिए संसाधनों की योजना बनाना और उन्हें सही समय पर उपलब्ध रखना। संसाधनों में धन, कर्मचारी, सामग्री, उपकरण, जानकारी और समय शामिल हो सकते हैं। क्रम से समझें: प्रबंधन प्रत्येक चरण की सूची बनाता है, उसकी जरूरत का अनुमान लगाता है, संसाधन मिलने का समय तय करता है, अंतिम चरणों के लिए पर्याप्त मात्रा बचाता है और उपयोग की निगरानी करता है। यदि संसाधन बचाकर नहीं रखे गए, तो शुरुआती काम बजट या सामग्री का अधिक भाग खर्च कर सकते हैं और बाद का काम देर से, अधूरा या कम गुणवत्ता वाला रह सकता है। विकल्प A सही है। विकल्प B गलत है, क्योंकि संसाधनों के बिना कार्यक्रम अपने-आप पूरा नहीं होता। विकल्प C गलत है, क्योंकि खराब संसाधन योजना खर्च को शून्य नहीं बनाती। विकल्प D गलत है, क्योंकि कमी होने पर समीक्षा की जरूरत और बढ़ जाती है। याद रखें: संसाधन शुरुआत के लिए ही नहीं, समापन तक हर चरण के लिए रखें।
Which statement gives the highest analytical meaning of a programme?कार्यक्रम का सर्वोच्च विश्लेषणात्मक अर्थ किस कथन में है?
Correct answer:सही उत्तर:A
A programme converts planning into practical execution. Understand programme as an integrated execution framework in exams.कार्यक्रम योजना को व्यावहारिक क्रियान्वयन में बदलता है। परीक्षा में programme को integrated execution framework समझें।
Google Analytics helps us understand site usage. Google may send limited cookie-free signals before your choice. The Live Visitors widget operates independently of this analytics choice; see the privacy policy for its provider and fallback details. Essential site features work without analytics cookies. You can change your choice later in Privacy choices. Privacy policy