Correct answer:सही उत्तर: A. Lack of performance standardप्रदर्शन मानक की कमी
The direct answer is Option A: lack of a performance standard. Activities describe what will be done, but a programme also needs a way to judge whether those activities have produced the desired result. A performance standard is a measurable expectation or indicator, such as number of units produced, percentage of customers satisfied, completion time or defect rate. Step by step, the programme lists activities, defines the expected result, measures the actual result and compares the two. Without a standard, success cannot be judged objectively. Option A is correct. Option B, excess of objectives, does not describe the stated problem. Option C, greater clarity of a rule, is unrelated to measuring results. Option D, complete procedure, is the opposite of the deficiency described and still does not necessarily provide a success measure. Exam cue: no measurement method means no performance standard or indicator.सीधा उत्तर विकल्प A है: प्रदर्शन मानक की कमी। गतिविधियाँ केवल यह बताती हैं कि क्या काम किया जाएगा, लेकिन कार्यक्रम में यह भी होना चाहिए कि परिणाम सफल है या नहीं, इसे कैसे मापा जाएगा। प्रदर्शन मानक कोई मापने योग्य अपेक्षा या संकेतक होता है, जैसे बने हुए उत्पादों की संख्या, संतुष्ट ग्राहकों का प्रतिशत, काम पूरा करने का समय या दोषों की संख्या। क्रम से समझें: गतिविधियाँ तय होती हैं, अपेक्षित परिणाम तय होता है, वास्तविक परिणाम मापा जाता है और दोनों की तुलना की जाती है। मानक न हो तो सफलता का निष्पक्ष निर्णय नहीं हो सकता। विकल्प A सही है। विकल्प B, उद्देश्यों की अधिकता, प्रश्न में बताई कमी नहीं है। विकल्प C, नियम की अधिक स्पष्टता, परिणाम मापने से संबंधित नहीं है। विकल्प D, पूर्ण कार्यविधि, बताई गई कमी का उलटा है और फिर भी माप की गारंटी नहीं देता। परीक्षा संकेत: मापने का तरीका नहीं है तो प्रदर्शन मानक या संकेतक की कमी है।