Correct answer:सही उत्तर: A. When circumstances changeपरिस्थितियां बदलने पर
The direct answer is option A: When circumstances change. A programme is prepared for a real situation, but real situations do not always remain fixed. Prices, technology, rules, customer needs, available workers, or deadlines may change. Step by step, management first notices the change, then studies its effect on tasks, time, cost, and resources, and finally adjusts the programme where necessary. This is called flexibility or revision of a plan. Option A is correct because changing circumstances can make the original sequence or method unsuitable. Option B is wrong because if everything remains the same, there may be no special reason to change the programme. Option C is wrong because a programme normally needs a target; absence of a target is a planning weakness, not the usual condition for useful adjustment. Option D is wrong because if there is no work, there is no meaningful programme to adjust. Memory cue: changing conditions require flexible planning, not blind following of the old schedule.सीधा उत्तर विकल्प A है: जब परिस्थितियां बदल जाएं। कार्यक्रम वास्तविक परिस्थितियों को ध्यान में रखकर बनाया जाता है, लेकिन वास्तविक जीवन में परिस्थितियां हमेशा एक जैसी नहीं रहतीं। कीमत, तकनीक, नियम, ग्राहकों की जरूरत, कर्मचारियों की उपलब्धता या समय-सीमा बदल सकती है। क्रम से समझें: प्रबंधन पहले बदलाव को पहचानता है, फिर देखता है कि उसका कार्य, समय, लागत और संसाधनों पर क्या प्रभाव पड़ेगा, और उसके बाद आवश्यक भागों में कार्यक्रम को बदलता है। इसे लचीलापन या योजना का संशोधन कहा जाता है। विकल्प A सही है क्योंकि बदली हुई परिस्थितियों में पुराना क्रम या तरीका अनुपयुक्त हो सकता है। विकल्प B गलत है, क्योंकि सब कुछ वैसा ही रहने पर बदलाव का विशेष कारण नहीं होता। विकल्प C गलत है, क्योंकि कार्यक्रम में सामान्यतः कोई लक्ष्य होना जरूरी है; लक्ष्य का न होना योजना की कमी है। विकल्प D गलत है, क्योंकि काम ही न हो तो बदलने योग्य उपयोगी कार्यक्रम भी नहीं होगा। परीक्षा संकेत: परिस्थितियां बदलें तो योजना में लचीलापन रखें।