यदि target में quality score को 70 से 82 करना है लेकिन time period नहीं है तो सबसे बड़ी कमी क्या है?

If a target says quality score should rise from 70 to 82 but has no time period what is the biggest weakness?

Explanation opens after your attempt
Correct Answer

A. समयबद्धता की कमीLack of time-bound nature

Step 1

Concept

Score is measurable but deadline is absent. In exams look for time limit also for a strong objective.

Step 2

Why this answer is correct

The correct answer is A. समयबद्धता की कमी / Lack of time-bound nature. Score is measurable but deadline is absent. In exams look for time limit also for a strong objective.

Step 3

Exam Tip

score measurable है पर deadline नहीं है। परीक्षा में strong objective के लिए time limit भी देखें।

Question me issue ya doubt hai?

Answer, explanation, typing mistake ya suggestion directly hamari team ko bhejein. 📱Helpline (Call / WhatsApp): +91 7272824365

Related Business Studies Questions

FAQs

Business Studies Answer, Explanation and Revision Hints

यदि target में quality score को 70 से 82 करना है लेकिन time period नहीं है तो सबसे बड़ी कमी क्या है? / If a target says quality score should rise from 70 to 82 but has no time period what is the biggest weakness?

Correct Answer: A. समयबद्धता की कमी / Lack of time-bound nature. Explanation: score measurable है पर deadline नहीं है। परीक्षा में strong objective के लिए time limit भी देखें। / Score is measurable but deadline is absent. In exams look for time limit also for a strong objective.

Which concept should I revise for this Business Studies MCQ?

Score is measurable but deadline is absent. In exams look for time limit also for a strong objective.

What exam hint can help solve this Business Studies question?

score measurable है पर deadline नहीं है। परीक्षा में strong objective के लिए time limit भी देखें।