Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है
In Class 12 Business Studies, this topic explains why planning, although essential for setting objectives and guiding business activities, cannot guarantee success. Students learn how planning may create rigidity, involve significant time and cost, delay action, and become ineffective when circumstances change rapidly. The topic also highlights that plans are based on assumptions about the future and may not work as expected in a dynamic business environment. Understanding these limitations helps students evaluate planning realistically while studying the broader chapter on Planning.
Expert · Level 4 · 25 questions
TOPIC PRACTICE
Quiz this set
Up to 25 questions from this page. Select your focus, then start.
25 questions
Choose questions
View options
Wrong estimation of customer psychology and social response
App has no relation with planning
Problem of employee salary
Success of production department
View options
A change in the exchange rate can affect cost or income
Foreign trade has no risk
Planning creates the exchange rate
Customers will always pay in dollars
View options
Lack of clarity in planning objectives
Incorrect estimation of implementation cost
Flexibility in the planning process
Decentralisation in policy implementation
View options
Wage equality
Staffing
Local adaptation being blocked by centralised rigidity
Auditing
View options
Objectives are always correct
Electricity has no relation with business
Employees are not responsible
The assumption about resource availability can be wrong
View options
Wrong assessment of price sensitivity
Employee training
Office discipline
Legal approval
View options
Planning can predict every future change completely
Rigid planning obstructs timely exploitation of opportunities
Planning eliminates organisational objectives
Planning removes the need for decision-making
View options
Targets always increase ethics
Customers are always wrong
Rigid targets can encourage unethical behaviour
Planning has no sales
View options
Stability of customer demand
Benefit of objective
Increase in coordination
Uncertainty of external industrial relations
View options
The whole project may stop or change
Cost will become zero
Demand will always increase
Employees will be automatically trained
View options
Stopping learning after planning and rigidity
Guarantee of profit
Employee salary
Market stability
View options
Even a small information error can create a large planning error
Budget has no relation with planning
Information is always correct
Planning never prepares budget
View options
Long-term strategic view may become weak
Customer loyalty will automatically increase
Competition will end
Production cost will always decrease
View options
Customer income will increase
The whole plan may be delayed due to departmental interdependence
Law will stop
Production will be free
View options
Employee training and salary
Office decoration and cleanliness
Cost and forecasting error
Benefit of objectives and coordination
View options
Objective setting
Coordination
Employee motivation
Ignoring legal environment
View options
Changing conditions can make planning assumptions invalid
Old brand popularity eliminates the impact of new competitors
Customer preference is determined only by product price
View options
Planning should be abandoned because future is uncertain
Planning is useful but it can be made effective only with flexibility, information quality, alternative planning and continuous review
Planning controls every external factor
Planning never involves cost
View options
Planning removes the need for labour
Technological changes can make a plan irrelevant
Planning always controls technology
Employees always stop new technology
View options
Planning fixes the exchange rate
Export has no risk
Customers will increase automatically
Revenue and cost estimates may be disturbed
View options
External dependence on digital platform can affect planning
Planning controls the platform
Promotion has no relation with planning
Customers never go online
View options
Clarity of objectives
Benefit of coordination
Flexibility according to local conditions
Accounting control
View options
Financial control
Division of work
Market expansion
Behavioural rigidity
View options
External political risk and supply dependence
Planning controls politics
Raw material is always available
Supply has no relation with cost
View options
Customers will always wait
Launch will succeed automatically
Time and image will be affected due to lack of alternative plan
Law has no relation with business
Question 1ExpertLevel 4
If customer privacy concern is underestimated in a plan and app downloads fall, which limitation is it?यदि योजना में ग्राहकों की गोपनीयता चिंता को कम आंका जाए और ऐप डाउनलोड घट जाएँ तो कौन सी सीमा है?
Correct answer:सही उत्तर:A
Privacy concern can change customer behaviour. In exams, treat social response as an uncertain factor.गोपनीयता चिंता ग्राहक व्यवहार बदल सकती है। परीक्षा में सामाजिक प्रतिक्रिया को अनिश्चित कारक मानें।
If foreign exchange risk is not hedged in a plan, what danger exists?यदि योजना में विदेशी मुद्रा जोखिम को बीमा से सुरक्षित नहीं किया गया तो कौन सा खतरा है?
Correct answer:सही उत्तर:A
The governing concept is exposure to an external economic variable. In an export or import plan, the expected domestic-currency value depends on the exchange rate at the relevant time. If the rate changes, an exporter may receive less domestic currency than expected, while an importer may pay more for the same foreign invoice. Hedging can reduce, though not necessarily eliminate, this uncertainty. Therefore option A is correct. Option B denies a real risk, option C incorrectly claims that a plan determines market rates, and option D makes an unjustified assumption about payment currency. The example demonstrates why financial contingencies and exchange-rate review matter in planning.मुख्य अवधारणा बाहरी आर्थिक चर के प्रति जोखिम की है। निर्यात या आयात योजना में अपेक्षित घरेलू मुद्रा-मूल्य संबंधित समय की विनिमय दर पर निर्भर करता है। दर बदलने पर निर्यातक को अनुमान से कम घरेलू मुद्रा मिल सकती है, जबकि आयातक को उसी विदेशी चालान के लिए अधिक भुगतान करना पड़ सकता है। हेजिंग इस अनिश्चितता को घटा सकती है, यद्यपि हमेशा पूरी तरह समाप्त नहीं करती। इसलिए विकल्प A सही है। विकल्प B वास्तविक जोखिम से इनकार करता है, विकल्प C गलत रूप से मानता है कि योजना बाजार-दर तय करती है और विकल्प D भुगतान-मुद्रा के बारे में अनुचित अनुमान है। यह उदाहरण वित्तीय आकस्मिकता और विनिमय-दर की समीक्षा का महत्व बताता है।
If the cost of implementing a new policy is underestimated and training expense rises, what is the problem?यदि योजना में एक नई नीति लागू करने की लागत कम आंकी गई और प्रशिक्षण खर्च बढ़ गया तो क्या समस्या है?
Correct answer:सही उत्तर:B
Implementing a new policy involves expenditure on training, resources and administrative arrangements. If these costs are underestimated and training expenses rise, the problem is incorrect estimation of implementation cost. Option A concerns unclear objectives, whereas this situation is about faulty cost estimation. Exam tip: In questions on limitations of planning, look carefully for errors in estimating cost, time and resources.नई नीति लागू करने के लिए प्रशिक्षण, संसाधन और प्रशासनिक व्यवस्थाओं पर खर्च होता है। यदि इन लागतों का अनुमान कम लगाया जाए और प्रशिक्षण व्यय बढ़ जाए, तो यह कार्यान्वयन लागत के गलत अनुमान की समस्या है। विकल्प A उद्देश्य-निर्धारण से जुड़ा है, जबकि यहाँ समस्या लागत-आकलन की है। परीक्षा टिप: नियोजन की सीमाओं में लागत, समय और संसाधनों के गलत आकलन को ध्यान से पहचानें।
If branch managers cannot increase stock according to local festival demand because of a plan, which limitation is it?यदि योजना के कारण शाखा प्रबंधक स्थानीय त्यौहार की मांग के अनुसार स्टॉक नहीं बढ़ा पाए तो कौन सी सीमा है?
Correct answer:सही उत्तर:C
Flexible decisions may be needed for local demand. In exams, connect central control and flexibility.स्थानीय मांग के लिए लचीला निर्णय जरूरी हो सकता है। परीक्षा में केंद्रीय नियंत्रण और लचीलापन को जोड़ें।
If a plan assumes all machines will run at full capacity but power cuts occur, what will be the conclusion?यदि योजना में माना गया कि सभी मशीनें पूरी क्षमता से चलेंगी लेकिन बिजली कटौती हुई तो क्या निष्कर्ष होगा?
Correct answer:सही उत्तर:D
Assuming full capacity can be risky. In exams, check both real resources and external facilities.पूरी क्षमता मानना जोखिमपूर्ण हो सकता है। परीक्षा में वास्तविक संसाधन और बाहरी सुविधा दोनों देखें।
If a plan decided to raise prices but customers proved price-sensitive, which limitation is indicated?यदि योजना में मूल्य बढ़ाने का निर्णय था लेकिन ग्राहक मूल्य संवेदनशील निकले तो किस सीमा का संकेत है?
Correct answer:सही उत्तर:A
Customer price response can be wrongly estimated. In exams, focus on demand and price relation.ग्राहक की मूल्य प्रतिक्रिया का अनुमान गलत हो सकता है। परीक्षा में मांग और मूल्य संबंध पर ध्यान दें।
If a company keeps postponing a partnership offer from a new startup due to planning and misses the opportunity, which limitation is it?यदि कंपनी नियोजन के कारण नए स्टार्टअप से साझेदारी का प्रस्ताव टालती रहे और अवसर छूट जाए तो कौन सी सीमा है?
Correct answer:सही उत्तर:B
The correct limitation is rigidity. When managers are excessively bound by an existing plan, they may fail to make a timely decision about an emerging opportunity such as a partnership with a new startup. As a result, the opportunity may be lost. Option A is incorrect because the future is uncertain; planning supports forecasting but cannot provide complete certainty. Exam tip: Link difficulty in modifying plans in changing situations with the limitation of rigidity in planning.सही उत्तर कठोरता है। जब प्रबंधक पहले से बनी योजना में अत्यधिक बंधे रहते हैं, तो वे नए स्टार्टअप के साथ साझेदारी जैसे उभरते अवसर पर समय से निर्णय नहीं ले पाते। इसलिए अवसर हाथ से निकल सकता है। विकल्प A गलत है क्योंकि भविष्य अनिश्चित होता है; नियोजन केवल पूर्वानुमान में सहायता करता है, पूर्ण निश्चितता नहीं देता। परीक्षा टिप: बदलती परिस्थितियों में योजना बदलने में कठिनाई को नियोजन की ‘कठोरता’ सीमा से जोड़ें।
If employees receive numerical targets in a plan and start making false promises to customers, what is the problem?यदि योजना में कर्मचारियों को संख्यात्मक लक्ष्य मिले और वे ग्राहक को गलत वादा करने लगें तो कौन सी समस्या है?
Correct answer:सही उत्तर:C
Targets are useful but very rigid targets can create wrong behaviour. In exams, write balance between ethics and targets.लक्ष्य उपयोगी हैं पर बहुत कठोर लक्ष्य गलत व्यवहार ला सकते हैं। परीक्षा में नैतिकता और लक्ष्य का संतुलन लिखें।
If a possible industry association strike is completely ignored while planning, what risk remains?यदि योजना बनाते समय उद्योग संघ की संभावित हड़ताल को पूरी तरह नज़रअंदाज़ किया गया तो कौन सा जोखिम रह गया?
Correct answer:सही उत्तर:D
A strike can change supply and production timelines. In exams, write industrial relations as an uncertain factor.हड़ताल योजना की आपूर्ति और उत्पादन समयसीमा बदल सकती है। परीक्षा में औद्योगिक संबंधों को अनिश्चित कारक लिखें।
If government approval is treated as a mere formality in a plan but approval is rejected, what will be the effect?यदि योजना में सरकारी अनुमति को औपचारिकता मान लिया गया लेकिन अनुमति अस्वीकार हो गई तो क्या प्रभाव होगा?
Correct answer:सही उत्तर:A
Government approval can be external and uncertain. In exams, connect approval risk with legal environment.सरकारी अनुमति बाहरी और अनिश्चित हो सकती है। परीक्षा में अनुमोदन जोखिम को कानूनी वातावरण से जोड़ें।
If alternatives were compared in planning but later new alternatives were not considered, which limitation is it?यदि योजना में विकल्पों की तुलना तो हुई लेकिन बाद में नए विकल्पों पर विचार बंद कर दिया गया तो कौन सी सीमा है?
Correct answer:सही उत्तर:A
The governing concept is that planning must remain a continuous and flexible managerial activity rather than a one-time decision. Comparing alternatives at the beginning is useful, but technology, customer preferences, costs, and competitors may change afterward. If managers stop scanning the environment because the original plan has already been approved, they may miss a cheaper, safer, or more effective alternative. Option A is correct because it combines the relevant failure to keep learning with rigidity. Option B is not guaranteed by planning, option C is an operating expense rather than the limitation described, and option D is an assumption, not an outcome. Review and adaptation are necessary.मुख्य अवधारणा यह है कि नियोजन एक बार में समाप्त होने वाला निर्णय नहीं, बल्कि निरंतर और लचीली प्रबंधकीय प्रक्रिया है। शुरुआत में विकल्पों की तुलना उपयोगी होती है, लेकिन बाद में तकनीक, ग्राहक-रुचि, लागत और प्रतिस्पर्धा बदल सकती है। यदि मूल योजना स्वीकृत होने के बाद प्रबंधक पर्यावरण का निरीक्षण बंद कर दें, तो वे सस्ता, सुरक्षित या अधिक प्रभावी नया विकल्प खो सकते हैं। इसलिए विकल्प A सही है, क्योंकि इसमें सीखना रोकने और कठोरता दोनों का संकेत है। विकल्प B नियोजन से लाभ की गारंटी का गलत दावा है, विकल्प C सामान्य परिचालन-व्यय है और विकल्प D कोई सीमा नहीं बल्कि एक मान्यता है। समीक्षा और अनुकूलन आवश्यक हैं।
If a small data error during planning creates a large difference in the entire budget, what is clear?यदि योजना बनाते समय आंकड़ों में हुई छोटी त्रुटि से पूरे बजट में बड़ा अंतर आ जाए तो क्या स्पष्ट है?
Correct answer:सही उत्तर:A
The direct answer is A: even a small information error can create a large planning error. Planning depends on data such as expected demand, costs, prices, capacity, and sales. First, an incorrect figure enters the assumptions. Next, that figure is used in calculations for departments, purchases, production, and cash requirements. Because these figures are connected, the original small error may spread through the whole budget and become a large difference. Option A is correct because it states this chain clearly. Option B is wrong: budgets are an important planning tool and are closely related to planning. Option C is false because information can be incomplete, outdated, or incorrect. Option D is false because planning commonly includes preparing budgets and estimates. The practical lesson is to verify sources, dates, units, and calculations before approving a plan, and to review the plan when reliable new information appears. Memory cue: wrong input can produce wrong output on a large scale.सीधा उत्तर A है: छोटी सूचना-त्रुटि भी बड़ी योजना-त्रुटि बना सकती है। नियोजन में अनुमानित मांग, लागत, कीमत, क्षमता, बिक्री और नकदी जैसी सूचनाओं का उपयोग होता है। पहले कोई गलत आंकड़ा योजना की धारणाओं में आ जाता है। फिर उसी आंकड़े के आधार पर खरीद, उत्पादन, विभागीय खर्च और नकदी की जरूरत की गणना की जाती है। ये सभी बातें आपस में जुड़ी होती हैं, इसलिए आरंभ की छोटी गलती पूरे बजट में बड़ा अंतर पैदा कर सकती है। A सही है क्योंकि वह इसी कारण-श्रृंखला को बताता है। B गलत है; बजट नियोजन का महत्वपूर्ण साधन है और उसका उससे घनिष्ठ संबंध है। C गलत है; सूचना अधूरी, पुरानी या गलत हो सकती है। D भी गलत है; नियोजन में प्रायः बजट और अनुमान तैयार किए जाते हैं। व्यावहारिक सीख यह है कि योजना स्वीकार करने से पहले स्रोत, तारीख, इकाई और गणना की जांच करनी चाहिए तथा नई विश्वसनीय सूचना मिलने पर समीक्षा करनी चाहिए। स्मरण-सूत्र: गलत प्रारंभिक सूचना बड़े स्तर पर गलत परिणाम दे सकती है।
If a plan considers only this month's sales instead of long-term market share, what risk exists?यदि एक योजना में दीर्घकालीन बाजार हिस्सेदारी के बजाय केवल इस माह की बिक्री देखी जाए तो क्या जोखिम है?
Correct answer:सही उत्तर:A
Focusing only on this month's sales may encourage decisions that give quick results while neglecting brand building, customer loyalty, innovation, and long-term market share. Hence, the long-term strategic view may become weak. Customer loyalty does not increase automatically; it requires consistent quality and customer-focused efforts. Exam tip: state that effective planning must balance short-term targets with long-term objectives.केवल इस माह की बिक्री पर ध्यान देने से प्रबंधक त्वरित परिणाम देने वाले निर्णय ले सकते हैं, पर वे ब्रांड निर्माण, ग्राहक निष्ठा, नवाचार और दीर्घकालीन बाजार हिस्सेदारी की उपेक्षा कर सकते हैं। इसलिए दीर्घकालीन रणनीतिक दृष्टि कमजोर होने का जोखिम रहता है। ग्राहक निष्ठा स्वतः नहीं बढ़ती; उसके लिए निरंतर गुणवत्ता और ग्राहक-केंद्रित प्रयास आवश्यक हैं। परीक्षा टिप: अल्पकालीन लक्ष्यों और दीर्घकालीन उद्देश्यों के संतुलन को नियोजन की प्रमुख आवश्यकता लिखें।
If a plan assumes that all departments will work at the same pace but one department lags behind, what problem will arise?यदि योजना में माना जाए कि सभी विभाग समान गति से काम करेंगे लेकिन एक विभाग पीछे रह जाए तो क्या समस्या बनेगी?
Correct answer:सही उत्तर:B
Delay in one department can affect the whole schedule. In exams, understand implementation interdependence.एक विभाग की देरी पूरे कार्यक्रम को प्रभावित कर सकती है। परीक्षा में क्रियान्वयन निर्भरता को समझें।
If an external expert's advice is expensive and still proves wrong, which double limitation is shown?यदि योजना में बाहरी विशेषज्ञ की सलाह महंगी हो और फिर भी गलत साबित हो जाए तो कौन सी दोहरी सीमा दिखती है?
Correct answer:सही उत्तर:C
Using external experts may increase the cost of planning. Yet their advice can still be incorrect because the future is uncertain. Thus, the situation shows two limitations of planning: costliness and forecasting error. Option D is a benefit of planning, not a limitation. Exam tip: Link costly expert advice with cost, and an uncertain future with forecasting limitations.बाहरी विशेषज्ञों की सेवाएँ लेने से योजना बनाने की लागत बढ़ सकती है। फिर भी भविष्य अनिश्चित होने के कारण उनका पूर्वानुमान गलत सिद्ध हो सकता है। इसलिए यह योजना की दो सीमाएँ—महँगी प्रक्रिया और पूर्वानुमान की त्रुटि—दिखाता है। विकल्प D योजना का लाभ है, सीमा नहीं। परीक्षा टिप: महँगी विशेषज्ञ सलाह को लागत तथा अनिश्चित भविष्य को पूर्वानुमान की सीमा से जोड़ें।
If consumer protection rules are underestimated in a plan and a penalty is imposed, which limitation is clear?यदि योजना में उपभोक्ता संरक्षण नियमों को हल्का समझा गया और जुर्माना लगा तो कौन सी सीमा स्पष्ट है?
Correct answer:सही उत्तर:D
Ignoring legal rules can make planning costly. In exams, write law as an external and compulsory factor.कानूनी नियमों की उपेक्षा योजना को महंगा बना सकती है। परीक्षा में कानून को बाहरी और अनिवार्य कारक लिखें।
If a plan relies on old brand popularity but customers begin preferring new brands, what limitation is it?यदि योजना में ब्रांड की पुरानी लोकप्रियता पर भरोसा किया गया लेकिन ग्राहक नई ब्रांड पसंद करने लगे तो क्या सीमा है?
Correct answer:सही उत्तर:A
Planning is based on certain assumptions about the future. Here, the plan treated the brand’s old popularity as stable, but customer preferences changed. This shows the limitation that assumptions may become invalid in a changing business environment. Option B is incorrect because planning cannot predict future preferences with complete accuracy. Exam tip: When a question mentions changing customer preferences or markets, look for the limitation related to changing conditions and planning assumptions.नियोजन भविष्य के बारे में कुछ धारणाओं पर आधारित होता है। यहाँ योजना ने ब्रांड की पुरानी लोकप्रियता को स्थिर मान लिया, पर ग्राहक की पसंद बदल गई। इसलिए यह नियोजन की सीमा है कि बदलते व्यावसायिक वातावरण में धारणाएँ गलत सिद्ध हो सकती हैं। विकल्प B गलत है क्योंकि नियोजन भविष्य का पूर्णतः सही अनुमान नहीं लगा सकता। परीक्षा टिप: ‘बदलती ग्राहक पसंद’ या ‘बदलता बाजार’ दिखे तो योजना की धारणाओं और गतिशील वातावरण की सीमा को पहचानें।
Which of the following is the most mature conclusion about limitations of planning?निम्न में से नियोजन की सीमाओं का सबसे परिपक्व निष्कर्ष कौन सा है?
Correct answer:सही उत्तर:B
An expert answer shows both limitations and improvement measures. In exams, write a balanced and analytical conclusion.विशेषज्ञ उत्तर में सीमाओं के साथ सुधार उपाय भी दिखते हैं। परीक्षा में संतुलित और विश्लेषणात्मक निष्कर्ष लिखें।
If a company prepares a labour-based plan by ignoring the impact of artificial intelligence, which limitation will be most clear?यदि कंपनी ने कृत्रिम बुद्धिमत्ता के प्रभाव को नज़रअंदाज़ करके मानव श्रम आधारित योजना बनाई तो कौन सी सीमा सबसे अधिक स्पष्ट होगी?
Correct answer:सही उत्तर:B
New technology can change old assumptions of a plan. In exams, write technological environment as a dynamic limitation.नई तकनीक योजना की पुरानी धारणाओं को बदल सकती है। परीक्षा में तकनीकी वातावरण को गतिशील सीमा के रूप में लिखें।
A company made an export plan on a stable dollar rate but the exchange rate fluctuated sharply. What is the main risk?एक कंपनी ने निर्यात योजना डॉलर की स्थिर दर पर बनाई लेकिन मुद्रा दर में तेज उतार चढ़ाव आया। मुख्य जोखिम क्या है?
Correct answer:सही उत्तर:D
The governing concept is that export planning depends on an external exchange rate that the company does not control. If the dollar moves sharply from the assumed rate, the domestic-currency value of export receipts can differ from the forecast. Depending on the transaction, imported inputs, finance costs, margins, and reported revenue may also change. Therefore option D is correct: income and cost estimates may be disturbed. Option A is false because planning cannot set a market rate, option B denies foreign-trade risk, and option C does not follow from currency movement. A sound plan should use sensitivity analysis, revised assumptions, and suitable risk-management measures.मुख्य अवधारणा यह है कि निर्यात-नियोजन ऐसी बाहरी विनिमय-दर पर निर्भर करता है जिसे कंपनी नियंत्रित नहीं करती। यदि डॉलर की दर अनुमानित दर से तेज़ी से बदल जाए, तो निर्यात से मिलने वाली घरेलू मुद्रा का वास्तविक मूल्य पूर्वानुमान से अलग हो सकता है। लेन-देन के अनुसार आयातित इनपुट, वित्त-लागत, लाभ-मार्जिन और दर्ज की गई आय भी बदल सकती है। इसलिए विकल्प D सही है: आय और लागत के अनुमान बिगड़ सकते हैं। विकल्प A गलत है क्योंकि योजना बाजार-दर तय नहीं कर सकती, विकल्प B विदेशी व्यापार के जोखिम से इनकार करता है और विकल्प C मुद्रा-परिवर्तन से स्वतः सिद्ध नहीं होता। अच्छी योजना में संवेदनशीलता-विश्लेषण, संशोधित मान्यताएँ और उचित जोखिम-प्रबंधन उपाय होने चाहिए।
If a plan is based only on online promotion and the platform account is suddenly suspended, which limitation is shown?यदि योजना केवल ऑनलाइन प्रचार पर आधारित हो और मंच का खाता अचानक निलंबित हो जाए तो कौन सी सीमा दिखती है?
Correct answer:सही उत्तर:A
Digital platform rules are not under the company's control. In exams, write external dependence as a limitation of planning.डिजिटल मंच के नियम कंपनी के नियंत्रण में नहीं होते। परीक्षा में बाहरी निर्भरता को योजना की सीमा लिखें।
If the same service model is fixed for all branches but it does not work in a hilly region, what is lacking?यदि योजना में सभी शाखाओं के लिए एक जैसा सेवा मॉडल तय हो लेकिन पहाड़ी क्षेत्र में वह मॉडल काम न करे तो क्या कमी है?
Correct answer:सही उत्तर:C
A uniform plan is not suitable for every area. In exams, connect local conditions with adaptability.एक समान योजना हर क्षेत्र में उपयुक्त नहीं होती। परीक्षा में स्थानीय परिस्थिति और अनुकूलनशीलता को जोड़ें।
If managers avoid changing a plan because it may reveal their earlier mistake, which limitation arises?यदि प्रबंधक योजना बदलने से बचते हैं क्योंकि इससे उनकी पिछली गलती उजागर होगी तो कौन सी सीमा बनती है?
Correct answer:सही उत्तर:D
The governing concept is that planning is affected not only by technical forecasts but also by managerial behaviour. When managers protect their reputation or fear criticism, they may continue using an unsuitable plan even after evidence shows that assumptions were wrong. This reluctance prevents timely correction, wastes resources, and can increase losses. Therefore option D is correct because the behaviour makes the planning process rigid. Option A concerns monitoring money and budgets, option B concerns assigning tasks, and option C concerns growth in markets; none explains the refusal to revise a known mistake. Effective management requires learning, honest review, accountability, and willingness to adapt plans.मुख्य अवधारणा यह है कि नियोजन केवल तकनीकी पूर्वानुमानों से नहीं, बल्कि प्रबंधकीय व्यवहार से भी प्रभावित होता है। जब प्रबंधक अपनी प्रतिष्ठा बचाने या आलोचना से डरने लगते हैं, तब वे प्रमाण मिलने के बाद भी अनुपयुक्त योजना को जारी रख सकते हैं, भले ही उसकी मान्यताएँ गलत सिद्ध हो चुकी हों। इससे समय पर सुधार रुकता है, संसाधन व्यर्थ होते हैं और हानि बढ़ सकती है। इसलिए विकल्प D सही है, क्योंकि ऐसा व्यवहार नियोजन को कठोर बना देता है। विकल्प A धन और बजट की निगरानी से, विकल्प B कार्य बाँटने से और विकल्प C बाजार-वृद्धि से संबंधित है; इनमें से कोई भी गलती छिपाने के लिए योजना न बदलने की स्थिति नहीं बताता। प्रभावी प्रबंधन में सीखना, ईमानदार समीक्षा, जवाबदेही और अनुकूलन आवश्यक हैं।
If the main raw material source in a plan is only one country and political crisis occurs there, what is the main limitation?यदि योजना में मुख्य कच्चे माल का स्रोत एक ही देश हो और उस देश में राजनीतिक संकट आ जाए तो मुख्य सीमा क्या है?
Correct answer:सही उत्तर:A
Dependence on one country increases political risk. In exams, link supply diversification with risk reduction.एक देश पर निर्भरता राजनीतिक जोखिम बढ़ाती है। परीक्षा में आपूर्ति विविधीकरण को जोखिम घटाने से जोड़ें।
If a company announces a new product without an alternative launch date and legal approval is delayed, what problem will occur?यदि कंपनी ने नया उत्पाद बिना वैकल्पिक लॉन्च तारीख के घोषित किया और कानूनी अनुमति देर से मिली तो क्या समस्या होगी?
Correct answer:सही उत्तर:C
Delay in legal approval is an external factor beyond the company’s direct control. Without an alternative launch date or contingency plan, the launch may be postponed, schedules may be disrupted, and the company’s market image may suffer. Option A is incorrect because customers may choose competing products rather than wait indefinitely. Exam tip: When writing limitations of planning, link external factors with the need for contingency planning.कानूनी अनुमति में देरी एक बाहरी बाधा है, जिसे कंपनी सीधे नियंत्रित नहीं कर सकती। वैकल्पिक लॉन्च तारीख या आकस्मिक योजना न होने पर उत्पाद का लॉन्च टलेगा, समय-सारिणी बिगड़ेगी और ग्राहकों तथा बाजार में कंपनी की छवि प्रभावित हो सकती है। विकल्प A गलत है क्योंकि ग्राहक हमेशा प्रतीक्षा नहीं करते; वे प्रतिस्पर्धी उत्पाद चुन सकते हैं। परीक्षा टिप: योजना की सीमाओं में बाहरी कारक और आकस्मिक योजना के अभाव का प्रभाव जोड़कर लिखें।
Google Analytics helps us understand site usage. Google may send limited cookie-free signals before your choice. The Live Visitors widget operates independently of this analytics choice; see the privacy policy for its provider and fallback details. Essential site features work without analytics cookies. You can change your choice later in Privacy choices. Privacy policy