Update

Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects

Search questions

Use text search or combine filters to find exactly the questions you need.

Reset
Class 12 · Business Studies

Which option correctly matches a scientific-management technique with its expert cue?

Class 12 · Business Studies

If actual output is 170 and 13 units are on quality hold what will be accepted output?

Class 12 · Business Studies

A worker produces 156 units, of which 8 are rejected. If each accepted unit is paid at the high rate of ₹9, what wage is payable on accepted output?

Class 12 · Business Studies

Total time is 960 minutes, including 120 minutes of necessary rest. If the standard time per unit is 14 minutes, what is the standard output?

Class 12 · Business Studies

If accepted output is 128 units and the applicable high piece-rate is ₹14 per unit, what wage is payable?

Class 12 · Business Studies

Which option correctly matches a scientific-management technique with its expert cue?

Class 12 · Business Studies

If standards and variances are appropriate but a bottleneck remains in the production process, which scientific-management technique is still required?

Class 12 · Business Studies

A worker produces 142 units, of which 5 are rejected. If each accepted unit is paid at the stated high rate of ₹9, what wage is payable on accepted output?

Class 12 · Business Studies

Total available time is 780 minutes, including 90 minutes of necessary rest. If the time allowed per unit is 15 minutes, what is the correct standard output?

Class 12 · Business Studies

If workers deliberately ignore standard instructions and rejection increases, which specialist is needed along with the inspector?

Class 9 · Mathematics

A student claims that √12 is irrational because √12 = 2√3. Which statement is needed to make this argument valid?

Class 12 · Business Studies

If workers were not trained in the correct method but still produced the required high output, what gap is present?

Class 12 · Business Studies

If 48 units are produced in 720 minutes, what is the standard time allowed per unit?

Class 12 · Business Studies

If the production target is high and no rest plan is provided, what is the most practical risk?

Class 12 · Business Studies

If accepted output is 136 units and the high rate is ₹10 per unit, what will be the wage?

Class 12 · Business Studies

Which option gives the correct sequence of method study and time study?

Class 12 · Business Studies

A worker produces 150 units. The standard is 145 units and the high rate is ₹7 per unit. Six units are rejected. What will be the wage on gross output?

Class 12 · Business Studies

A worker produces 150 units. The standard is 145 units and the high rate is ₹7 per unit. Six units are rejected. What will be the wage on accepted output?

Class 12 · Business Studies

If the standard time is 9 minutes and motion study shows that the best method takes 6 minutes, which conclusion is correct?

Class 12 · Business Studies

If actual time is lower but worker fatigue is very high, which analysis is necessary before revising the target?