Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects
0 reads0 ratings0 helpful

What is the purpose of systems like EVM and VVPAT?

Answer and explanation

Correct answer: To make voting and verification more transparent

Answer: A. An Electronic Voting Machine records a voter’s selected choice electronically, while VVPAT provides a paper-based visual verification of that choice for a short period before the slip is stored according to the prescribed process. Together, these systems support an organised voting process and improve the possibility of checking whether the recorded vote corresponds to the voter’s selection. This strengthens confidence and transparency, although technology must still be used under election rules and proper safeguards. Option B is wrong because voting machines do not conduct or increase campaign activity. Option C is wrong because voter identity is checked through election procedures; EVM and VVPAT do not remove that requirement. Option D is wrong because candidates are nominated through a separate legal and electoral process. The key idea is verification, not campaigning or candidate selection. Memory cue: EVM records the choice; VVPAT lets the voter verify it.

Related tags

EvmVvpatElection TransparencyWhat Makes Elections In India Free And Fair?What Makes Elections In India Free And FairElectoral PoliticsCivicsClass 9 Mcq

Was this question useful?

No ratings yetWrite a review / Rate this question

Student Reviews

No published reviews yet.

Add Muft Shiksha to your Home Screen

In Safari, tap Share, then Add to Home Screen.