यदि विद्यार्थी अपनी क्षमता से बहुत अधिक कार्य एक दिन में तय करता है तो स्व-प्रबंधन की कौन-सी त्रुटि है?
If a student schedules far more work than can be handled in one day, what self-management error is present?
Explanation opens after your attempt
B. अवास्तविक योजनाUnrealistic planning
Concept
Scheduling more work than time and ability allow is unrealistic planning. Check the match between resources and workload in the exam.
Why this answer is correct
The correct answer is B. अवास्तविक योजना / Unrealistic planning. Scheduling more work than time and ability allow is unrealistic planning. Check the match between resources and workload in the exam.
Exam Tip
क्षमता और समय से अधिक कार्य तय करना अवास्तविक योजना है। परीक्षा में संसाधन और कार्यभार का मेल जांचें।