यदि high output के लिए high rate है लेकिन standard time outdated है क्योंकि नई मशीन लग चुकी है तो wage system में क्या करना चाहिए?
If high rate is given for high output but standard time is outdated because a new machine has been installed what should be done in the wage system?
Explanation opens after your attempt
A. Standard time और output standard को revise करना चाहिएStandard time and output standard should be revised
Concept
A new machine may change method and time. Exam tip: remember technology change means standard revision.
Why this answer is correct
The correct answer is A. Standard time और output standard को revise करना चाहिए / Standard time and output standard should be revised. A new machine may change method and time. Exam tip: remember technology change means standard revision.
Exam Tip
नई मशीन से विधि और समय बदल सकते हैं। परीक्षा में technology change means standard revision याद रखें।
Login to save your score, XP, coins and progress.
