यदि actual cost high है क्योंकि route में extra handling है तो किस study से root correction होगा?

If actual cost is high because the route has extra handling which study will give root correction?

Explanation opens after your attempt
Correct Answer

A. विधि अध्ययनMethod study

Step 1

Concept

Extra handling is an issue of process flow. Exam tip: connect material route with method study.

Step 2

Why this answer is correct

The correct answer is A. विधि अध्ययन / Method study. Extra handling is an issue of process flow. Exam tip: connect material route with method study.

Step 3

Exam Tip

Extra handling process flow का issue है। परीक्षा में material route को method study से जोड़ें।

Question me issue ya doubt hai?

Answer, explanation, typing mistake ya suggestion directly hamari team ko bhejein. 📱Helpline (Call / WhatsApp): +91 7272824365

Related Business Studies Questions

FAQs

Business Studies Answer, Explanation and Revision Hints

यदि actual cost high है क्योंकि route में extra handling है तो किस study से root correction होगा? / If actual cost is high because the route has extra handling which study will give root correction?

Correct Answer: A. विधि अध्ययन / Method study. Explanation: Extra handling process flow का issue है। परीक्षा में material route को method study से जोड़ें। / Extra handling is an issue of process flow. Exam tip: connect material route with method study.

Which concept should I revise for this Business Studies MCQ?

Extra handling is an issue of process flow. Exam tip: connect material route with method study.

What exam hint can help solve this Business Studies question?

Extra handling process flow का issue है। परीक्षा में material route को method study से जोड़ें।