Class 12 Business Studies Expert Quiz

Level 45 • 50/50 questions • 25 seconds per question.

Level readiness 50/50 Questions
Time Left 20:50 25 sec/question
RewardsCoins + XP
ModeClassic Quiz
Share
Question 1 / 50 0 score
Answered 0/50 Correct 0 Time 20:50

यदि नई स्वचालित मशीन आने के बाद भी पुराने हाथ से काम करने वाले समय मानक से लक्ष्य तय किए जा रहे हैं तो कौन सा कदम सबसे वैज्ञानिक है?

If a new automated machine is installed but targets are still fixed using the old manual time standard what is the most scientific step?

Explanation opens after your attempt
Correct Answer

B. विधि और समय मानक की पुनर्समीक्षा करनाReview method and time standard

Step 1

Concept

A new machine may change both method and time. Exam tip: remember standard review after technology change.

Step 2

Why this answer is correct

The correct answer is B. विधि और समय मानक की पुनर्समीक्षा करना / Review method and time standard. A new machine may change both method and time. Exam tip: remember standard review after technology change.

Step 3

Exam Tip

नई मशीन से विधि और समय दोनों बदल सकते हैं। परीक्षा में तकनीक बदलने पर standard review याद रखें।

Open Question Page
Ask Friends

एक कारखाने में सही मार्ग तय है पर लिखित निर्देश में पुराने औजारों की सूची है। कौन सा समन्वय कमजोर है?

In a factory the correct route is fixed but written instructions list old tools. Which coordination is weak?

Explanation opens after your attempt
Correct Answer

C. रूट क्लर्क और इंस्ट्रक्शन कार्ड क्लर्कRoute clerk and instruction card clerk

Step 1

Concept

Route and written instructions both belong to the planning side. Exam tip: read route and instruction clues together.

Step 2

Why this answer is correct

The correct answer is C. रूट क्लर्क और इंस्ट्रक्शन कार्ड क्लर्क / Route clerk and instruction card clerk. Route and written instructions both belong to the planning side. Exam tip: read route and instruction clues together.

Step 3

Exam Tip

मार्ग और लिखित निर्देश दोनों योजना पक्ष से जुड़े हैं। परीक्षा में route और instruction clues को साथ पढ़ें।

Open Question Page
Ask Friends

यदि सामग्री समय पर है पर विशेष माप वाला क्लैंप उपलब्ध नहीं है और काम शुरू नहीं हो पाता तो मुख्य कमी किसमें है?

If material is on time but a special sized clamp is unavailable and work cannot start where is the main weakness?

Explanation opens after your attempt
Correct Answer

A. गैंग बॉस की तैयारीPreparation by gang boss

Step 1

Concept

Arranging resources to start work is linked with gang boss. Exam tip: separate material readiness from tool setup.

Step 2

Why this answer is correct

The correct answer is A. गैंग बॉस की तैयारी / Preparation by gang boss. Arranging resources to start work is linked with gang boss. Exam tip: separate material readiness from tool setup.

Step 3

Exam Tip

काम शुरू कराने के साधन जुटाना गैंग बॉस से जुड़ा है। परीक्षा में material ready और tool setup अलग पहचानें।

Open Question Page
Ask Friends

यदि उत्पादन गति बढ़ाने पर दोष भी बढ़ते हैं तो speed boss के निर्णय को किसके साथ संतुलित करना चाहिए?

If defects rise after increasing production speed the speed boss decision should be balanced with what?

Explanation opens after your attempt
Correct Answer

C. गुणवत्ता निरीक्षण मानकQuality inspection standards

Step 1

Concept

Quality control is also needed when speed increases. Exam tip: check speed and quality balance.

Step 2

Why this answer is correct

The correct answer is C. गुणवत्ता निरीक्षण मानक / Quality inspection standards. Quality control is also needed when speed increases. Exam tip: check speed and quality balance.

Step 3

Exam Tip

गति बढ़ाने पर गुणवत्ता नियंत्रण भी जरूरी है। परीक्षा में speed और quality balance देखें।

Open Question Page
Ask Friends

यदि मशीन ठीक है पर श्रमिक निर्देश का जानबूझकर पालन नहीं करते और दोष बढ़ते हैं तो कौन सा विशेषज्ञ मुख्य होगा?

If the machine is proper but workers deliberately ignore instructions and defects rise which specialist will be central?

Explanation opens after your attempt
Correct Answer

D. डिसिप्लिनेरियनDisciplinarian

Step 1

Concept

Deliberate non compliance is a discipline issue. Exam tip: choose the specialist after reading the defect cause.

Step 2

Why this answer is correct

The correct answer is D. डिसिप्लिनेरियन / Disciplinarian. Deliberate non compliance is a discipline issue. Exam tip: choose the specialist after reading the defect cause.

Step 3

Exam Tip

जानबूझकर नियम न मानना अनुशासन का विषय है। परीक्षा में defect cause पढ़कर specialist चुनें।

Open Question Page
Ask Friends

कुल 1000 मिनट में 160 मिनट आवश्यक विश्राम है और प्रति इकाई समय 12 मिनट है। मानक उत्पादन कितना होगा?

Total time is 1000 minutes including 160 minutes necessary rest and time per unit is 12 minutes. What will be the standard output?

Explanation opens after your attempt
Correct Answer

B. 70 इकाई70 units

Step 1

Concept

Working time is (1000 - 160 = 840) minutes and output is \(840 \div 12 = 70\) units. Exam tip: deduct rest first.

Step 2

Why this answer is correct

The correct answer is B. 70 इकाई / 70 units. Working time is (1000 - 160 = 840) minutes and output is \(840 \div 12 = 70\) units. Exam tip: deduct rest first.

Step 3

Exam Tip

कार्य समय 840 मिनट होगा और उत्पादन 70 इकाई होगा। परीक्षा में पहले rest घटाएं।

Open Question Page
Ask Friends

एक श्रमिक 168 इकाई बनाता है। मानक 160 है और उच्च दर ₹11 है। कुल उत्पादन पर मजदूरी कितनी होगी?

A worker produces 168 units. Standard is 160 and high rate is ₹11. What will be wage on gross output?

Explanation opens after your attempt
Correct Answer

C. ₹1848

Step 1

Concept

Output above standard gets high rate on all units. Exam tip: calculate \(168 \times 11 = 1848\).

Step 2

Why this answer is correct

The correct answer is C. ₹1848. Output above standard gets high rate on all units. Exam tip: calculate \(168 \times 11 = 1848\).

Step 3

Exam Tip

मानक से अधिक उत्पादन पर उच्च दर पूरी इकाइयों पर लगती है। परीक्षा में \(168 \times 11 = 1848\) करें।

Open Question Page
Ask Friends

एक श्रमिक 168 इकाई बनाता है। मानक 160 है और उच्च दर ₹11 है। 10 इकाई अस्वीकृत हैं। स्वीकृत उत्पादन पर मजदूरी कितनी होगी?

A worker produces 168 units. Standard is 160 and high rate is ₹11. 10 units are rejected. What will be wage on accepted output?

Explanation opens after your attempt
Correct Answer

A. ₹1738

Step 1

Concept

Accepted output is (168 - 10 = 158) units so wage is ₹1738. Exam tip: deduct rejected units.

Step 2

Why this answer is correct

The correct answer is A. ₹1738. Accepted output is (168 - 10 = 158) units so wage is ₹1738. Exam tip: deduct rejected units.

Step 3

Exam Tip

स्वीकृत उत्पादन 158 इकाई है इसलिए मजदूरी 1738 रुपये होगी। परीक्षा में अस्वीकृत इकाइयां घटाएं।

Open Question Page
Ask Friends

मानक 150 इकाई है। श्रमिक 147 इकाई बनाता है और निम्न दर ₹13 है। मजदूरी कितनी होगी?

Standard is 150 units. A worker produces 147 units and low rate is ₹13. What will be the wage?

Explanation opens after your attempt
Correct Answer

C. ₹1911

Step 1

Concept

Output below standard gets the low rate. Exam tip: calculate \(147 \times 13 = 1911\).

Step 2

Why this answer is correct

The correct answer is C. ₹1911. Output below standard gets the low rate. Exam tip: calculate \(147 \times 13 = 1911\).

Step 3

Exam Tip

मानक से कम उत्पादन पर निम्न दर लगती है। परीक्षा में \(147 \times 13 = 1911\) करें।

Open Question Page
Ask Friends

यदि समान औजार और समान विधि हैं पर कच्चे माल की शुद्धता अलग अलग है तो निष्पक्ष तुलना क्यों कमजोर होगी?

If tools and method are uniform but raw material purity differs why will fair comparison be weak?

Explanation opens after your attempt
Correct Answer

A. क्योंकि इनपुट दशाएं समान नहीं हैंBecause input conditions are not equal

Step 1

Concept

Input quality should also be standard for performance comparison. Exam tip: connect material standard with fairness.

Step 2

Why this answer is correct

The correct answer is A. क्योंकि इनपुट दशाएं समान नहीं हैं / Because input conditions are not equal. Input quality should also be standard for performance comparison. Exam tip: connect material standard with fairness.

Step 3

Exam Tip

प्रदर्शन तुलना के लिए input quality भी standard होनी चाहिए। परीक्षा में material standard को fairness से जोड़ें।

Open Question Page
Ask Friends

कंपनी ने 42 डिजाइनों को 12 में घटाया पर सबसे अधिक बिकने वाले दो डिजाइन हट गए। मुख्य गलती क्या है?

A company reduced 42 designs to 12 but removed the two best selling designs. What is the main mistake?

Explanation opens after your attempt
Correct Answer

A. मांग आधारित सरलीकरण नहीं हुआDemand based simplification was not done

Step 1

Concept

Simplification reduces unnecessary variety not essential demand. Exam tip: connect demand analysis with simplification.

Step 2

Why this answer is correct

The correct answer is A. मांग आधारित सरलीकरण नहीं हुआ / Demand based simplification was not done. Simplification reduces unnecessary variety not essential demand. Exam tip: connect demand analysis with simplification.

Step 3

Exam Tip

सरलीकरण जरूरी मांग नहीं बल्कि अनावश्यक विविधता घटाता है। परीक्षा में demand analysis को simplification से जोड़ें।

Open Question Page
Ask Friends

यदि उत्पाद किस्में कम हैं लेकिन हर बॉक्स का आयतन अलग है तो कौन सा मानक अधूरा है?

If product varieties are few but volume of every box differs which standard is incomplete?

Explanation opens after your attempt
Correct Answer

C. आयतन और माप मानकVolume and measurement standard

Step 1

Concept

Uniform measurement and volume are linked with standardisation. Exam tip: do not treat low variety as complete standardisation.

Step 2

Why this answer is correct

The correct answer is C. आयतन और माप मानक / Volume and measurement standard. Uniform measurement and volume are linked with standardisation. Exam tip: do not treat low variety as complete standardisation.

Step 3

Exam Tip

समान माप और आयतन मानकीकरण से जुड़े हैं। परीक्षा में low variety को complete standardisation न मानें।

Open Question Page
Ask Friends

यदि हाथ की छोटी गतियां कम हो गईं लेकिन सामग्री अभी भी गलत विभाग में घूमती है तो कौन सा अध्ययन बाकी है?

If small hand movements are reduced but material still circulates through the wrong department which study remains?

Explanation opens after your attempt
Correct Answer

C. विधि अध्ययनMethod study

Step 1

Concept

Hand movement is motion study but material flow is method study. Exam tip: separate body motion from process flow.

Step 2

Why this answer is correct

The correct answer is C. विधि अध्ययन / Method study. Hand movement is motion study but material flow is method study. Exam tip: separate body motion from process flow.

Step 3

Exam Tip

हाथ की गति motion study है पर material flow method study है। परीक्षा में body motion और process flow अलग करें।

Open Question Page
Ask Friends

नई layout से चलना घटा पर काम में बार बार कंधा घुमाना पड़ता है। किस संयुक्त review की जरूरत है?

A new layout reduces walking but the job requires repeated shoulder rotation. Which combined review is needed?

Explanation opens after your attempt
Correct Answer

B. गति अध्ययन और थकान अध्ययनMotion study and fatigue study

Step 1

Concept

Reducing walking is motion improvement but shoulder strain is a fatigue issue. Exam tip: check both efficiency and strain.

Step 2

Why this answer is correct

The correct answer is B. गति अध्ययन और थकान अध्ययन / Motion study and fatigue study. Reducing walking is motion improvement but shoulder strain is a fatigue issue. Exam tip: check both efficiency and strain.

Step 3

Exam Tip

चलना घटाना motion improvement है पर कंधे की strain fatigue issue है। परीक्षा में efficiency और strain दोनों देखें।

Open Question Page
Ask Friends

यदि process route छोटा हुआ लेकिन भारी उठाने से चोटें बढ़ीं तो expert conclusion क्या है?

If process route becomes shorter but injuries increase due to heavy lifting what is the expert conclusion?

Explanation opens after your attempt
Correct Answer

A. Method study result को fatigue और safety से validate करेंValidate method study result with fatigue and safety

Step 1

Concept

The best method should be safe as well as fast. Exam tip: see method efficiency and human safety together.

Step 2

Why this answer is correct

The correct answer is A. Method study result को fatigue और safety से validate करें / Validate method study result with fatigue and safety. The best method should be safe as well as fast. Exam tip: see method efficiency and human safety together.

Step 3

Exam Tip

सर्वोत्तम विधि तेज होने के साथ सुरक्षित भी होनी चाहिए। परीक्षा में method efficiency और human safety साथ देखें।

Open Question Page
Ask Friends

यदि समय अध्ययन केवल सबसे तेज श्रमिक पर आधारित है और सामान्य श्रमिक लक्ष्य पूरा नहीं कर पाते तो मूल कमजोरी क्या है?

If time study is based only on the fastest worker and normal workers cannot meet the target what is the root weakness?

Explanation opens after your attempt
Correct Answer

A. सामान्य प्रतिनिधि श्रमिक का चयन गलत हैNormal representative worker selection is wrong

Step 1

Concept

The fastest worker is not a normal representative. Exam tip: treat representative worker as a condition of time study.

Step 2

Why this answer is correct

The correct answer is A. सामान्य प्रतिनिधि श्रमिक का चयन गलत है / Normal representative worker selection is wrong. The fastest worker is not a normal representative. Exam tip: treat representative worker as a condition of time study.

Step 3

Exam Tip

सबसे तेज श्रमिक सामान्य प्रतिनिधि नहीं होता। परीक्षा में representative worker time study की शर्त मानें।

Open Question Page
Ask Friends

यदि समय अध्ययन केवल अत्यधिक धीमे श्रमिक पर हुआ तो मानक में कौन सी विकृति आ सकती है?

If time study is done only on an extremely slow worker what distortion may arise in the standard?

Explanation opens after your attempt
Correct Answer

A. मानक बहुत ढीला हो सकता हैStandard may become too loose

Step 1

Concept

An extremely slow worker is also not a proper representative. Exam tip: remember average capable worker.

Step 2

Why this answer is correct

The correct answer is A. मानक बहुत ढीला हो सकता है / Standard may become too loose. An extremely slow worker is also not a proper representative. Exam tip: remember average capable worker.

Step 3

Exam Tip

बहुत धीमा श्रमिक भी सही प्रतिनिधि नहीं है। परीक्षा में average capable worker याद रखें।

Open Question Page
Ask Friends

यदि उत्पादन अधिक है पर पुनःकार्य लागत भी बढ़ रही है तो productivity analysis में क्या जोड़ना जरूरी है?

If output is high but rework cost is also rising what must be added in productivity analysis?

Explanation opens after your attempt
Correct Answer

C. पुनःकार्य और अस्वीकृति लागत dataRework and rejection cost data

Step 1

Concept

High output alone is not enough when rework cost rises. Exam tip: add quality cost in productivity.

Step 2

Why this answer is correct

The correct answer is C. पुनःकार्य और अस्वीकृति लागत data / Rework and rejection cost data. High output alone is not enough when rework cost rises. Exam tip: add quality cost in productivity.

Step 3

Exam Tip

High output alone enough नहीं है जब rework cost बढ़ती है। परीक्षा में quality cost को productivity में जोड़ें।

Open Question Page
Ask Friends

यदि wrist motion घटने से प्रति इकाई समय 20 मिनट से 14 मिनट हो गया तो क्या review होना चाहिए?

If reducing wrist motion changes per unit time from 20 minutes to 14 minutes what should be reviewed?

Explanation opens after your attempt
Correct Answer

B. समय मानकTime standard

Step 1

Concept

Motion improvement can change time standard. Exam tip: remember interaction between motion and time study.

Step 2

Why this answer is correct

The correct answer is B. समय मानक / Time standard. Motion improvement can change time standard. Exam tip: remember interaction between motion and time study.

Step 3

Exam Tip

Motion improvement से time standard बदल सकता है। परीक्षा में motion और time study interaction याद रखें।

Open Question Page
Ask Friends

कार्यात्मक फोरमैनशिप में route clerk और speed boss की priority clash कर रही है। सबसे व्यावहारिक समाधान क्या है?

In functional foremanship the priorities of route clerk and speed boss are clashing. What is the most practical solution?

Explanation opens after your attempt
Correct Answer

B. स्पष्ट coordination और priority system बनानाCreate a clear coordination and priority system

Step 1

Concept

Coordination is necessary with specialisation. Exam tip: connect multi specialist limitation with unity of command.

Step 2

Why this answer is correct

The correct answer is B. स्पष्ट coordination और priority system बनाना / Create a clear coordination and priority system. Coordination is necessary with specialisation. Exam tip: connect multi specialist limitation with unity of command.

Step 3

Exam Tip

विशेषज्ञता के साथ समन्वय जरूरी है। परीक्षा में multi specialist limitation को unity of command से जोड़ें।

Open Question Page
Ask Friends

यदि speed boss accepted quality तय करे और inspector speed target तय करे तो कौन सी समस्या है?

If speed boss decides accepted quality and inspector fixes speed target what is the problem?

Explanation opens after your attempt
Correct Answer

C. specialist role overlap

Step 1

Concept

Confusion occurs when specialist roles are not clear. Exam tip: treat role clarity as key to functional foremanship.

Step 2

Why this answer is correct

The correct answer is C. specialist role overlap. Confusion occurs when specialist roles are not clear. Exam tip: treat role clarity as key to functional foremanship.

Step 3

Exam Tip

विशेषज्ञ roles clear न हों तो confusion होता है। परीक्षा में role clarity को functional foremanship का key मानें।

Open Question Page
Ask Friends

यदि standards और product variety ठीक हैं पर loading point पर queue बनती है तो कौन सी technique सबसे relevant है?

If standards and product variety are proper but a queue forms at the loading point which technique is most relevant?

Explanation opens after your attempt
Correct Answer

D. विधि अध्ययनMethod study

Step 1

Concept

A queue is a process bottleneck so method study is relevant. Exam tip: distinguish standards from process flow.

Step 2

Why this answer is correct

The correct answer is D. विधि अध्ययन / Method study. A queue is a process bottleneck so method study is relevant. Exam tip: distinguish standards from process flow.

Step 3

Exam Tip

Queue process bottleneck है इसलिए method study relevant है। परीक्षा में standards और process flow अलग पहचानें।

Open Question Page
Ask Friends

यदि कंपनी अंदरूनी standards रखती है पर supplier audit नहीं करती और input बदलता रहता है तो सबसे बड़ा risk क्या है?

If a company has internal standards but does not audit suppliers and input keeps changing what is the biggest risk?

Explanation opens after your attempt
Correct Answer

A. supply side variation standards को कमजोर करेगाSupply side variation will weaken standards

Step 1

Concept

Input quality is part of practical standardisation. Exam tip: do not ignore supplier standards.

Step 2

Why this answer is correct

The correct answer is A. supply side variation standards को कमजोर करेगा / Supply side variation will weaken standards. Input quality is part of practical standardisation. Exam tip: do not ignore supplier standards.

Step 3

Exam Tip

Input quality practical standardisation का हिस्सा है। परीक्षा में supplier standards को ignore न करें।

Open Question Page
Ask Friends

यदि new standard tool लागू है लेकिन manual old tool के लिए है तो सबसे सही gap क्या है?

If a new standard tool is applied but the manual is for the old tool what is the most correct gap?

Explanation opens after your attempt
Correct Answer

A. मानकीकरण और training alignment gapStandardisation and training alignment gap

Step 1

Concept

Manual and training should be updated when tool changes. Exam tip: check implementation follow up.

Step 2

Why this answer is correct

The correct answer is A. मानकीकरण और training alignment gap / Standardisation and training alignment gap. Manual and training should be updated when tool changes. Exam tip: check implementation follow up.

Step 3

Exam Tip

Tool बदलने पर manual और training update होनी चाहिए। परीक्षा में implementation follow up देखें।

Open Question Page
Ask Friends

वास्तविक उत्पादन 190 इकाई है और 16 इकाई गुणवत्ता रोक में हैं। स्वीकृत उत्पादन कितना होगा?

Actual output is 190 units and 16 units are on quality hold. What will be accepted output?

Explanation opens after your attempt
Correct Answer

A. 174 इकाई174 units

Step 1

Concept

Quality hold units are deducted from accepted output. Exam tip: calculate (190 - 16 = 174).

Step 2

Why this answer is correct

The correct answer is A. 174 इकाई / 174 units. Quality hold units are deducted from accepted output. Exam tip: calculate (190 - 16 = 174).

Step 3

Exam Tip

स्वीकृत उत्पादन में गुणवत्ता रोक वाली इकाइयां घटती हैं। परीक्षा में (190 - 16 = 174) करें।

Open Question Page
Ask Friends

यदि wage policy में rejected units की treatment नहीं है तो कौन सा विवाद सबसे संभव है?

If wage policy does not mention treatment of rejected units what dispute is most likely?

Explanation opens after your attempt
Correct Answer

C. अस्वीकृत units wage में count होंगी या नहींWhether rejected units count in wage

Step 1

Concept

The wage basis of quality rejection should be clear. Exam tip: read gross and accepted output separately.

Step 2

Why this answer is correct

The correct answer is C. अस्वीकृत units wage में count होंगी या नहीं / Whether rejected units count in wage. The wage basis of quality rejection should be clear. Exam tip: read gross and accepted output separately.

Step 3

Exam Tip

Quality rejection का wage basis clear होना चाहिए। परीक्षा में gross और accepted output अलग पढ़ें।

Open Question Page
Ask Friends

यदि rest plan ठीक है लेकिन useless elbow movement से fatigue बनी है तो कौन सा अतिरिक्त अध्ययन चाहिए?

If rest plan is proper but useless elbow movement still causes fatigue which additional study is needed?

Explanation opens after your attempt
Correct Answer

B. गति अध्ययनMotion study

Step 1

Concept

Even proper rest cannot remove fatigue from useless movement. Exam tip: understand motion and fatigue interaction.

Step 2

Why this answer is correct

The correct answer is B. गति अध्ययन / Motion study. Even proper rest cannot remove fatigue from useless movement. Exam tip: understand motion and fatigue interaction.

Step 3

Exam Tip

Rest सही होने पर भी useless movement fatigue दे सकती है। परीक्षा में motion और fatigue interaction समझें।

Open Question Page
Ask Friends

यदि high target से दर्द और अनुपस्थिति बढ़ती है तो target बढ़ाने से पहले क्या जरूरी है?

If a high target increases pain and absenteeism what is necessary before increasing the target?

Explanation opens after your attempt
Correct Answer

C. fatigue sustainability check

Step 1

Concept

The target should be sustainable and consider human limits. Exam tip: check output and fatigue balance.

Step 2

Why this answer is correct

The correct answer is C. fatigue sustainability check. The target should be sustainable and consider human limits. Exam tip: check output and fatigue balance.

Step 3

Exam Tip

Target टिकाऊ होना चाहिए और human limits ध्यान में होनी चाहिए। परीक्षा में output और fatigue balance देखें।

Open Question Page
Ask Friends

यदि actual time कम है लेकिन quality खराब है तो performance decision में क्या जोड़ना चाहिए?

If actual time is low but quality is poor what should be added to the performance decision?

Explanation opens after your attempt
Correct Answer

A. गुणवत्ता standards और inspection dataQuality standards and inspection data

Step 1

Concept

Low time is useful only when quality is acceptable. Exam tip: check speed and quality together.

Step 2

Why this answer is correct

The correct answer is A. गुणवत्ता standards और inspection data / Quality standards and inspection data. Low time is useful only when quality is acceptable. Exam tip: check speed and quality together.

Step 3

Exam Tip

कम time तभी उपयोगी है जब quality acceptable हो। परीक्षा में speed और quality साथ देखें।

Open Question Page
Ask Friends

यदि product mix बदल गया और पुराने output standard से appraisal हो रहा है तो expert action क्या होगा?

If product mix changes and appraisal is still based on old output standard what is the expert action?

Explanation opens after your attempt
Correct Answer

A. output standard review

Step 1

Concept

Product mix changes may change method and time. Exam tip: remember major change means standard review.

Step 2

Why this answer is correct

The correct answer is A. output standard review. Product mix changes may change method and time. Exam tip: remember major change means standard review.

Step 3

Exam Tip

Product mix बदलने से method और time बदल सकते हैं। परीक्षा में major change means standard review याद रखें।

Open Question Page
Ask Friends

यदि worker को multiple foremen से conflicting orders मिलते हैं तो Fayol के किस principle से comparison होगा?

If a worker gets conflicting orders from multiple foremen comparison will be with which Fayol principle?

Explanation opens after your attempt
Correct Answer

A. Unity of command

Step 1

Concept

Functional foremanship gives multiple orders that can contrast with unity of command. Exam tip: remember Taylor Fayol contrast.

Step 2

Why this answer is correct

The correct answer is A. Unity of command. Functional foremanship gives multiple orders that can contrast with unity of command. Exam tip: remember Taylor Fayol contrast.

Step 3

Exam Tip

Functional foremanship multiple orders देता है जो unity of command से contrast कर सकता है। परीक्षा में Taylor Fayol contrast याद रखें।

Open Question Page
Ask Friends

यदि common measuring gauge तय हुआ और scientific rest pause भी तय हुआ तो कौन सा combined application है?

If common measuring gauge is fixed and scientific rest pause is also fixed what combined application is shown?

Explanation opens after your attempt
Correct Answer

A. Standardisation और fatigue studyStandardisation and fatigue study

Step 1

Concept

Common gauge is standardisation and rest pause is fatigue study. Exam tip: catch combined clues.

Step 2

Why this answer is correct

The correct answer is A. Standardisation और fatigue study / Standardisation and fatigue study. Common gauge is standardisation and rest pause is fatigue study. Exam tip: catch combined clues.

Step 3

Exam Tip

Common gauge standardisation है और rest pause fatigue study है। परीक्षा में combined clues पकड़ें।

Open Question Page
Ask Friends

यदि variants घटाए गए और remaining variants के लिए common rejection criteria बने तो कौन सा combined use है?

If variants are reduced and common rejection criteria are made for remaining variants what combined use is shown?

Explanation opens after your attempt
Correct Answer

A. Simplification और standardisationSimplification and standardisation

Step 1

Concept

Reducing variants is simplification and rejection criteria is standardisation. Exam tip: identify two clue cases.

Step 2

Why this answer is correct

The correct answer is A. Simplification और standardisation / Simplification and standardisation. Reducing variants is simplification and rejection criteria is standardisation. Exam tip: identify two clue cases.

Step 3

Exam Tip

Variants घटाना simplification है और rejection criteria standardisation है। परीक्षा में two clue case पहचानें।

Open Question Page
Ask Friends

यदि process map सुधर गया लेकिन worker training old route पर है तो कौन सा implementation gap है?

If process map improves but worker training is based on the old route what implementation gap exists?

Explanation opens after your attempt
Correct Answer

A. method study output और training alignment gapMethod study output and training alignment gap

Step 1

Concept

The new process works only when training is updated. Exam tip: check follow up after a technique.

Step 2

Why this answer is correct

The correct answer is A. method study output और training alignment gap / Method study output and training alignment gap. The new process works only when training is updated. Exam tip: check follow up after a technique.

Step 3

Exam Tip

नई process तभी लागू होगी जब training update हो। परीक्षा में technique के बाद follow up देखें।

Open Question Page
Ask Friends

यदि workers trained हैं लेकिन rotation इतनी तेज है कि learning stable नहीं होती तो practical issue क्या है?

If workers are trained but rotation is so frequent that learning does not stabilise what is the practical issue?

Explanation opens after your attempt
Correct Answer

A. Practice stability और job fit की कमीLack of practice stability and job fit

Step 1

Concept

Training is supported by stable practice and suitable job. Exam tip: see training and job stability together.

Step 2

Why this answer is correct

The correct answer is A. Practice stability और job fit की कमी / Lack of practice stability and job fit. Training is supported by stable practice and suitable job. Exam tip: see training and job stability together.

Step 3

Exam Tip

Training को stable practice और suitable job support करते हैं। परीक्षा में training और job stability साथ देखें।

Open Question Page
Ask Friends

यदि high output standard दिया गया लेकिन method training नहीं हुई तो सबसे गंभीर gap क्या है?

If high output standard is given but method training is not done what is the most serious gap?

Explanation opens after your attempt
Correct Answer

A. Target capability mismatch

Step 1

Concept

A target is proper when workers know the correct method. Exam tip: check training with standard output.

Step 2

Why this answer is correct

The correct answer is A. Target capability mismatch. A target is proper when workers know the correct method. Exam tip: check training with standard output.

Step 3

Exam Tip

Target तभी उचित है जब workers correct method जानते हों। परीक्षा में standard output के साथ training देखें।

Open Question Page
Ask Friends

यदि accepted output 152 है और high rate ₹15 है तो wage कितनी होगी?

If accepted output is 152 and high rate is ₹15 what will be the wage?

Explanation opens after your attempt
Correct Answer

C. ₹2280

Step 1

Concept

Calculation is based on 152 accepted units. Exam tip: calculate \(152 \times 15 = 2280\).

Step 2

Why this answer is correct

The correct answer is C. ₹2280. Calculation is based on 152 accepted units. Exam tip: calculate \(152 \times 15 = 2280\).

Step 3

Exam Tip

Accepted output पर 152 units की calculation होगी। परीक्षा में \(152 \times 15 = 2280\) करें।

Open Question Page
Ask Friends

यदि 1170 मिनट में 78 units बनती हैं तो प्रति इकाई standard time कितना होगा?

If 78 units are produced in 1170 minutes what will be per unit standard time?

Explanation opens after your attempt
Correct Answer

B. 15 मिनट15 minutes

Step 1

Concept

Per unit standard time will be \(1170 \div 78 = 15\) minutes. Exam tip: divide total time by units.

Step 2

Why this answer is correct

The correct answer is B. 15 मिनट / 15 minutes. Per unit standard time will be \(1170 \div 78 = 15\) minutes. Exam tip: divide total time by units.

Step 3

Exam Tip

प्रति इकाई standard time 15 मिनट होगा। परीक्षा में कुल समय को units से divide करें।

Open Question Page
Ask Friends

यदि सही route बन गया पर पुराना route board workers को extra walking कराता है तो root issue क्या है?

If the correct route is made but an old route board makes workers walk extra distance what is the root issue?

Explanation opens after your attempt
Correct Answer

A. Route communication update issue

Step 1

Concept

Failure to update route information is a planning communication problem. Exam tip: identify route clerk’s information role.

Step 2

Why this answer is correct

The correct answer is A. Route communication update issue. Failure to update route information is a planning communication problem. Exam tip: identify route clerk’s information role.

Step 3

Exam Tip

Route information update न होना planning communication problem है। परीक्षा में route clerk की सूचना भूमिका पहचानें।

Open Question Page
Ask Friends

यदि actual cost high है क्योंकि material बार बार duplicate handling से गुजरता है तो root correction किस study से होगा?

If actual cost is high because material goes through duplicate handling which study will give root correction?

Explanation opens after your attempt
Correct Answer

A. विधि अध्ययनMethod study

Step 1

Concept

Duplicate handling is a whole process issue. Exam tip: connect material flow with method study.

Step 2

Why this answer is correct

The correct answer is A. विधि अध्ययन / Method study. Duplicate handling is a whole process issue. Exam tip: connect material flow with method study.

Step 3

Exam Tip

Duplicate handling पूरी process का issue है। परीक्षा में material flow को method study से जोड़ें।

Open Question Page
Ask Friends

यदि product varieties कम हैं और input standard है लेकिन workstation bottleneck है तो कौन सा study चाहिए?

If product varieties are few and input is standard but a workstation bottleneck exists which study is needed?

Explanation opens after your attempt
Correct Answer

A. Method study

Step 1

Concept

A workstation bottleneck is a process design issue. Exam tip: consider method study even after simplification and standardisation.

Step 2

Why this answer is correct

The correct answer is A. Method study. A workstation bottleneck is a process design issue. Exam tip: consider method study even after simplification and standardisation.

Step 3

Exam Tip

Workstation bottleneck process design issue है। परीक्षा में simplification और standardisation के बाद भी method study देखें।

Open Question Page
Ask Friends

यदि output 240 है और 22 units rejected हैं तो accepted output कितना होगा?

If output is 240 and 22 units are rejected what will be accepted output?

Explanation opens after your attempt
Correct Answer

C. 218 इकाई218 units

Step 1

Concept

Rejected units are deducted from accepted output. Exam tip: calculate (240 - 22 = 218).

Step 2

Why this answer is correct

The correct answer is C. 218 इकाई / 218 units. Rejected units are deducted from accepted output. Exam tip: calculate (240 - 22 = 218).

Step 3

Exam Tip

Accepted output में rejected units घटती हैं। परीक्षा में (240 - 22 = 218) करें।

Open Question Page
Ask Friends

यदि machine route material सब सही हैं पर final product defect है तो सबसे पहले checking role किसका है?

If machine route and material are all correct but the final product is defective whose checking role comes first?

Explanation opens after your attempt
Correct Answer

A. Inspector

Step 1

Concept

Inspector checks final product quality. Exam tip: separate checking role from correction role.

Step 2

Why this answer is correct

The correct answer is A. Inspector. Inspector checks final product quality. Exam tip: separate checking role from correction role.

Step 3

Exam Tip

Final product quality checking inspector करता है। परीक्षा में checking role और correction role अलग रखें।

Open Question Page
Ask Friends

यदि defects wrong digital gauge से हैं तो कमजोर technique और correction role का सही जोड़ा कौन सा है?

If defects are caused by a wrong digital gauge which pair of weak technique and correction role is correct?

Explanation opens after your attempt
Correct Answer

A. Standardisation और repair bossStandardisation and repair boss

Step 1

Concept

Gauge standard is standardisation and tool correction may link with repair boss. Exam tip: check both standard and correction.

Step 2

Why this answer is correct

The correct answer is A. Standardisation और repair boss / Standardisation and repair boss. Gauge standard is standardisation and tool correction may link with repair boss. Exam tip: check both standard and correction.

Step 3

Exam Tip

Gauge standard मानकीकरण है और tool correction repair boss से जुड़ सकता है। परीक्षा में standard और correction दोनों देखें।

Open Question Page
Ask Friends

यदि higher output के बाद rest plan review नहीं हुआ और errors बढ़े तो integrated action क्या है?

If rest plan is not reviewed after higher output and errors rise what is the integrated action?

Explanation opens after your attempt
Correct Answer

A. Time target और fatigue rest दोनों review करेंReview both time target and fatigue rest

Step 1

Concept

Rest balance is necessary with a higher target. Exam tip: see target revision and fatigue study together.

Step 2

Why this answer is correct

The correct answer is A. Time target और fatigue rest दोनों review करें / Review both time target and fatigue rest. Rest balance is necessary with a higher target. Exam tip: see target revision and fatigue study together.

Step 3

Exam Tip

Higher target के साथ rest balance जरूरी है। परीक्षा में target revision और fatigue study को साथ देखें।

Open Question Page
Ask Friends

यदि दो निरीक्षक समान वस्तु को अलग अलग गुणवत्ता सीमा से पास कर रहे हैं तो किस तकनीक को पहले मजबूत करना चाहिए?

If two inspectors are passing the same item using different quality limits which technique should be strengthened first?

Explanation opens after your attempt
Correct Answer

A. निरीक्षण मापदंडों का मानकीकरणStandardisation of inspection criteria

Step 1

Concept

The same item should have the same quality limit. Exam tip: connect uniformity in quality decisions with standardisation.

Step 2

Why this answer is correct

The correct answer is A. निरीक्षण मापदंडों का मानकीकरण / Standardisation of inspection criteria. The same item should have the same quality limit. Exam tip: connect uniformity in quality decisions with standardisation.

Step 3

Exam Tip

समान वस्तु के लिए समान गुणवत्ता सीमा होनी चाहिए। परीक्षा में quality decision uniformity को standardisation से जोड़ें।

Open Question Page
Ask Friends

यदि स्वीकृत उत्पादन 166 इकाई है और उच्च दर ₹12 है तो मजदूरी कितनी होगी?

If accepted output is 166 units and the high rate is ₹12 what will be the wage?

Explanation opens after your attempt
Correct Answer

C. ₹1992

Step 1

Concept

Wage will be calculated on accepted output. Exam tip: calculate \(166 \times 12 = 1992\).

Step 2

Why this answer is correct

The correct answer is C. ₹1992. Wage will be calculated on accepted output. Exam tip: calculate \(166 \times 12 = 1992\).

Step 3

Exam Tip

मजदूरी स्वीकृत उत्पादन पर निकलेगी। परीक्षा में \(166 \times 12 = 1992\) करें।

Open Question Page
Ask Friends

यदि रात की पाली में समान कार्य विधि होने के बाद भी कम रोशनी से गलतियां बढ़ती हैं तो कौन सा अध्ययन जरूरी है?

If errors increase in the night shift due to poor lighting even when the work method is the same which study is needed?

Explanation opens after your attempt
Correct Answer

C. थकान अध्ययनFatigue study

Step 1

Concept

Poor lighting is a working condition that can increase fatigue and errors. Exam tip: connect working condition with fatigue study.

Step 2

Why this answer is correct

The correct answer is C. थकान अध्ययन / Fatigue study. Poor lighting is a working condition that can increase fatigue and errors. Exam tip: connect working condition with fatigue study.

Step 3

Exam Tip

कम रोशनी कार्य दशा है जो थकान और गलती बढ़ा सकती है। परीक्षा में working condition को fatigue study से जोड़ें।

Open Question Page
Ask Friends

यदि वास्तविक समय मानक समय से कम है पर वास्तविक लागत अधिक है तो किस अभिलेख से गहरी जांच होगी?

If actual time is less than standard time but actual cost is higher which record will help deeper analysis?

Explanation opens after your attempt
Correct Answer

C. टाइम एंड कॉस्ट क्लर्क का अभिलेखTime and cost clerk record

Step 1

Concept

Cost may be higher even when time is lower so cost records are necessary. Exam tip: see time saving and cost control separately.

Step 2

Why this answer is correct

The correct answer is C. टाइम एंड कॉस्ट क्लर्क का अभिलेख / Time and cost clerk record. Cost may be higher even when time is lower so cost records are necessary. Exam tip: see time saving and cost control separately.

Step 3

Exam Tip

समय कम होने पर भी लागत अधिक हो सकती है इसलिए लागत अभिलेख जरूरी है। परीक्षा में time saving और cost control अलग देखें।

Open Question Page
Ask Friends

यदि spare parts की बहुत अधिक छोटी किस्में भंडार में पड़ी हैं और उपयोग कम है तो कौन सी तकनीक सबसे उपयोगी होगी?

If too many small varieties of spare parts remain in inventory with low use which technique will be most useful?

Explanation opens after your attempt
Correct Answer

B. सरलीकरणSimplification

Step 1

Concept

Reducing low use unnecessary varieties is simplification. Exam tip: connect slow moving varieties with simplification.

Step 2

Why this answer is correct

The correct answer is B. सरलीकरण / Simplification. Reducing low use unnecessary varieties is simplification. Exam tip: connect slow moving varieties with simplification.

Step 3

Exam Tip

कम उपयोग वाली अनावश्यक किस्में घटाना सरलीकरण है। परीक्षा में slow moving varieties को simplification से जोड़ें।

Open Question Page
Ask Friends
FAQs

Class 12 Business Studies Quiz FAQs

How many questions are in this quiz?

This level is designed for 50 active questions. Currently 50 questions are available for the selected class and difficulty.

Is there a timer in this quiz?

Yes, the timer uses 25 seconds per question for Expert difficulty and shows the total remaining time on the page.

Can I open each question separately?

Yes, every question has its own SEO-friendly page with answer, explanation and related practice links.