यदि योजना में दीर्घकालीन लक्ष्य और अल्पकालीन कदमों में संबंध नहीं है तो कौन सी कमजोरी है?

If there is no relation between long term objectives and short term steps in a plan what weakness exists?

Explanation opens after your attempt
Correct Answer

A. लक्ष्य और कार्य क्रम का असंतुलनImbalance between objective and action sequence

Step 1

Concept

Short steps in planning should connect with the larger objective. In exams check the long term and short term link.

Step 2

Why this answer is correct

The correct answer is A. लक्ष्य और कार्य क्रम का असंतुलन / Imbalance between objective and action sequence. Short steps in planning should connect with the larger objective. In exams check the long term and short term link.

Step 3

Exam Tip

योजना में छोटे कदम बड़े लक्ष्य से जुड़े होने चाहिए। परीक्षा में long term और short term link देखें।

Question me issue ya doubt hai?

Answer, explanation, typing mistake ya suggestion directly hamari team ko bhejein. 📱Helpline (Call / WhatsApp): +91 7272824365

Related Business Studies Questions

FAQs

Business Studies Answer, Explanation and Revision Hints

यदि योजना में दीर्घकालीन लक्ष्य और अल्पकालीन कदमों में संबंध नहीं है तो कौन सी कमजोरी है? / If there is no relation between long term objectives and short term steps in a plan what weakness exists?

Correct Answer: A. लक्ष्य और कार्य क्रम का असंतुलन / Imbalance between objective and action sequence. Explanation: योजना में छोटे कदम बड़े लक्ष्य से जुड़े होने चाहिए। परीक्षा में long term और short term link देखें। / Short steps in planning should connect with the larger objective. In exams check the long term and short term link.

Which concept should I revise for this Business Studies MCQ?

Short steps in planning should connect with the larger objective. In exams check the long term and short term link.

What exam hint can help solve this Business Studies question?

योजना में छोटे कदम बड़े लक्ष्य से जुड़े होने चाहिए। परीक्षा में long term और short term link देखें।