यदि योजना में दीर्घकालीन लक्ष्य और अल्पकालीन कदमों में संबंध नहीं है तो कौन सी कमजोरी है?
If there is no relation between long term objectives and short term steps in a plan what weakness exists?
Explanation opens after your attempt
A. लक्ष्य और कार्य क्रम का असंतुलनImbalance between objective and action sequence
Concept
Short steps in planning should connect with the larger objective. In exams check the long term and short term link.
Why this answer is correct
The correct answer is A. लक्ष्य और कार्य क्रम का असंतुलन / Imbalance between objective and action sequence. Short steps in planning should connect with the larger objective. In exams check the long term and short term link.
Exam Tip
योजना में छोटे कदम बड़े लक्ष्य से जुड़े होने चाहिए। परीक्षा में long term और short term link देखें।