Update

Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects

Search questions

Choose which content to search, then combine terms with AND or OR.

Search in
Match words
Reset
Class 12 · Business Studies · Hard

If product size is standard but too many packaging colours are increasing storage bins which technique is still needed?

→
Class 12 · Business Studies · Hard

If 28 product variants were reduced to 9 but the market complained that a high demand variant was removed where is the mistake?

→
Class 12 · Business Studies · Hard

If standard method is applied but suppliers provide material of different density which conclusion is correct?

→
Class 12 · Business Studies · Medium

A worker produces 132 units. The standard is 125 units and the high rate is ₹6 per unit. Seven units are rejected. If payment is based on gross output, what will be the wage?

→
Class 12 · Business Studies · Hard

A worker produces 132 units. Standard is 125 and high rate is ₹6. 7 units are rejected. If payment is on accepted output what will be the wage?

→
Class 12 · Business Studies · Hard

Standard is 108 units. A worker produces 104 units and the low rate is ₹11. What will be the wage?

→
Class 12 · Business Studies · Medium

The standard is 115 units. A worker produces 119 units, and the high rate is ₹12 per unit. What will be the wage?

→
Class 12 · Business Studies · Medium

Total time is 720 minutes, including 80 minutes of necessary rest, and the time per unit is 16 minutes. What will be the standard output?

→
Class 12 · Business Studies · Hard

A task has 840 minutes available and time per unit is 14 minutes. What will be the standard output?

→
Class 12 · Business Studies · Hard

If defects are seen in finished goods but the defect report does not show time and cost impact which record is weak?

→
Class 12 · Business Studies · Hard

A worker received correct written instruction but material and jig were not available when work started. Which production specialist will be responsible?

→
Class 12 · Business Studies · Medium

If the machine is proper but workers do not reach the target because speed is too slow, which specialist, not the repair boss, will be central?

→
Class 12 · Business Studies · Hard

In a factory the production route was shortened but workers did not receive the new route in written instructions. Which coordination is weak?

→
Class 12 · Business Studies · Hard

In a case material flow improved hand movement reduced standard output changed rest plan was made and quality basis was added to wage. What does this show?

→
Class 12 · Business Studies · Hard

If work method changed and unnecessary bending reduced but time standard was not changed what is missing?

→
Class 12 · Business Studies · Hard

In which situation will roles of inspector and repair boss both be separately needed?

→
Class 12 · Business Studies · Hard

In which situation is it necessary to understand the difference between speed boss and repair boss?

→
Class 12 · Business Studies · Hard

If route speed and quality are all correct but too many variants increase storage cost which technique is best?

→
Class 12 · Business Studies · Hard

If workers are trained but the manual for the new standard tool is old what implementation gap exists?

→
Class 12 · Business Studies · Hard

If old time standard is still applied after product mix changes what problem will occur?

→

Add Muft Shiksha to your Home Screen

In Safari, tap Share, then Add to Home Screen.