Update

Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects

Search questions

Choose which content to search, then combine terms with AND or OR.

Search in
Match words
Reset
Class 12 · Business Studies · Hard

If output is fast but final rejection is increasing whose role is needed along with speed boss?

→
Class 12 · Business Studies · Hard

If material is on time and the route is correct but the worker does not get the machine fixture ready whose role is weak?

→
Class 12 · Business Studies · Hard

In a factory the route sheet is updated but the instruction card follows the old process. What is the most correct conclusion?

→
Class 12 · Business Studies · Hard

In a case route improved instructions updated material standardised motion reduced time revised and rest balanced. What does this show?

→
Class 12 · Business Studies · Hard

If new standard output is announced but workers are not told how time study was done what practical risk exists?

→
Class 12 · Business Studies · Hard

If supplier material standard is fixed and product variants are few but a process bottleneck exists which study is needed?

→
Class 12 · Business Studies · Hard

If rest intervals are correct but unnecessary arm movement is increasing fatigue which study is also needed?

→
Class 12 · Business Studies · Hard

If a work method is faster but increases safety risk what should be included while choosing the best method?

→
Class 12 · Business Studies · Hard

If workers receive orders from many foremen and there is no priority list what is the most practical improvement?

→
Class 12 · Business Studies · Hard

If route was wrong and material moved extra distance but workers’ body motions were proper which study is more relevant?

→
Class 12 · Business Studies · Hard

If output is high but actual cost is also high whose record will explain real productivity?

→
Class 12 · Business Studies · Hard

If worker speed alone is increased to reduce actual cost but unnecessary process steps are not removed what weakness remains?

→
Class 12 · Business Studies · Hard

If output is 140 and 8 units are on quality hold what will be accepted output?

→
Class 12 · Business Studies · Hard

If 50 units are produced in 600 minutes what is per unit standard time?

→
Class 12 · Business Studies · Hard

If reducing product variety lowers cost but training material is still based on old variants what is the next logical step?

→
Class 12 · Business Studies · Hard

If the standard time is 9 minutes and motion study shows that the best method takes 6 minutes, which conclusion is correct?

→
Class 12 · Business Studies · Hard

If high rate is given for high output but quality standard is not written what is the main risk?

→
Class 12 · Business Studies · Hard

If final product is defective and checking shows machine calibration was wrong whose correction role applies?

→
Class 12 · Business Studies · Hard

If route is correct material is ready and speed is proper but final product is defective whose checking role comes first?

→
Class 12 · Business Studies · Hard

In which situation do standardisation and fatigue study both appear together?

→

Add Muft Shiksha to your Home Screen

In Safari, tap Share, then Add to Home Screen.