Update

Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects

Search questions

Choose which content to search, then combine terms with AND or OR.

Search in
Match words
Reset
Class 12 · Business Studies · Hard

If speed boss and inspector both give different quality instructions what problem of functional foremanship appears?

Class 12 · Business Studies · Hard

If route speed and machine are all correct but workers break rules and create quality defects which role is also needed?

Class 12 · Business Studies · Hard

Which option correctly matches a technique and cue?

Class 12 · Business Studies · Hard

Which option has an incorrect match between technique and cue?

Class 12 · Business Studies · Medium

Which option gives the correct sequence of method study and time study?

Class 12 · Business Studies · Hard

If actual time is low but fatigue and pain are very high what should be checked before revising target?

Class 12 · Business Studies · Hard

If time standard is made only on the basis of the slowest worker what problem may occur?

Class 12 · Business Studies · Hard

If per unit time changed from 13 minutes to 9 minutes because unnecessary motions were removed which standard should be reviewed?

Class 12 · Business Studies · Hard

If tools are placed nearby but wrist twisting of the worker still remains what will be the next step?

Class 12 · Business Studies · Hard

If method study shortened material flow but the worker has to bend more which combined analysis is needed?

Class 12 · Business Studies · Hard

If variants were reduced without demand analysis and a fast selling variant was removed what was missing in simplification?

Class 12 · Business Studies · Hard

If quality is uniform but 32 small product variants are increasing storage cost which technique is needed?

Class 12 · Business Studies · Hard

If product variants are few but suppliers send different grades of steel which standard is weak?

Class 12 · Business Studies · Medium

A worker produces 150 units. The standard is 145 units and the high rate is ₹7 per unit. Six units are rejected. What will be the wage on gross output?

Class 12 · Business Studies · Hard

A worker produces 150 units. The standard is 145 units and the high rate is ₹7 per unit. Six units are rejected. What will be the wage on accepted output?

Class 12 · Business Studies · Hard

Standard is 125 units. A worker produces 121 units and the low rate is ₹9. What will be the wage?

Class 12 · Business Studies · Hard

Standard is 130 units. A worker produces 134 units and the high rate is ₹8. What will be the wage?

Class 12 · Business Studies · Hard

Total time is 840 minutes including 120 minutes necessary rest and time per unit is 12 minutes. What will be the correct standard output?

Class 12 · Business Studies · Hard

A task has 900 minutes available and takes 15 minutes per unit. What will be the standard output?

Class 12 · Business Studies · Hard

If machine calibration is wrong and defects are occurring the inspector will detect defects but who will correct it?