Update

Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects

Search questions

Choose which content to search, then combine terms with AND or OR.

Search in
Match words
Reset
Class 12 · Business Studies · Expert

If a layout change reduces walking but workers have to bend more which combined analysis is needed?

→
Class 12 · Business Studies · Expert

If workers’ hand motions have reduced but material still follows a long route which study is still needed?

→
Class 12 · Business Studies · Expert

If product quality is uniform but weight differs in every batch which aspect is incomplete?

→
Class 12 · Business Studies · Expert

A company reduced variants from 30 to 6 but removed the highest demand variant. What was the main weakness in simplification?

→
Class 12 · Business Studies · Expert

If the method and tools are uniform but suppliers give different grades of material why will performance comparison be weak?

→
Class 12 · Business Studies · Hard

A worker produces 142 units, of which 5 are rejected. If each accepted unit is paid at the stated high rate of ₹9, what wage is payable on accepted output?

→
Class 12 · Business Studies · Expert

Standard is 135 units. A worker produces 138 units and high rate is ₹11. What will be the wage on gross output?

→
Class 12 · Business Studies · Medium

Total available time is 780 minutes, including 90 minutes of necessary rest. If the time allowed per unit is 15 minutes, what is the correct standard output?

→
Class 12 · Business Studies · Hard

If workers deliberately ignore standard instructions and rejection increases, which specialist is needed along with the inspector?

→
Class 12 · Business Studies · Expert

If finished goods are defective due to wrong machine calibration who will correct it after the inspector detects it?

→
Class 12 · Business Studies · Expert

If the route is correct but fixtures and material are not available before work starts the delay is most linked to which role?

→
Class 12 · Business Studies · Expert

In a factory the route sheet is new but the instruction card is based on the old layout. What lack of coordination does this show?

→
Class 12 · Business Studies · Expert

If per unit time was fixed without choosing the best work method and later unnecessary process steps were found what is the most scientific correction?

→
Class 12 · Business Studies · Hard

In a case route was updated instruction card improved material standardised motion reduced time revised rest balanced and accepted output added in wage. What does it show?

→
Class 12 · Business Studies · Hard

In which situation may method study still be needed even after standardisation and simplification?

→
Class 12 · Business Studies · Hard

If production flow improved but actual cost did not fall because rework increased which data should also be checked?

→
Class 12 · Business Studies · Medium

If workers were not trained in the correct method but still produced the required high output, what gap is present?

→
Class 12 · Business Studies · Hard

If worker skill is correct but the job changes repeatedly so speed does not become stable what practical issue exists?

→
Class 12 · Business Studies · Hard

If a worker receives orders from many foremen and there is no single priority comparison with which principle is needed?

→
Class 12 · Business Studies · Hard

If product mix changes but the old output standard remains the same what issue will occur?

→

Add Muft Shiksha to your Home Screen

In Safari, tap Share, then Add to Home Screen.