यदि supplier material standard तय है और product variants भी कम हैं पर process में bottleneck है तो कौन सा study चाहिए?

If supplier material standard is fixed and product variants are few but a process bottleneck exists which study is needed?

Explanation opens after your attempt
Correct Answer

A. विधि अध्ययनMethod study

Step 1

Concept

A bottleneck is an issue of the whole process. Exam tip: connect process bottleneck with method study.

Step 2

Why this answer is correct

The correct answer is A. विधि अध्ययन / Method study. A bottleneck is an issue of the whole process. Exam tip: connect process bottleneck with method study.

Step 3

Exam Tip

bottleneck पूरी process का मुद्दा है। परीक्षा में process bottleneck को method study से जोड़ें।

Question me issue ya doubt hai?

Answer, explanation, typing mistake ya suggestion directly hamari team ko bhejein. 📱Helpline (Call / WhatsApp): +91 7272824365

Related Business Studies Questions

FAQs

Business Studies Answer, Explanation and Revision Hints

यदि supplier material standard तय है और product variants भी कम हैं पर process में bottleneck है तो कौन सा study चाहिए? / If supplier material standard is fixed and product variants are few but a process bottleneck exists which study is needed?

Correct Answer: A. विधि अध्ययन / Method study. Explanation: bottleneck पूरी process का मुद्दा है। परीक्षा में process bottleneck को method study से जोड़ें। / A bottleneck is an issue of the whole process. Exam tip: connect process bottleneck with method study.

Which concept should I revise for this Business Studies MCQ?

A bottleneck is an issue of the whole process. Exam tip: connect process bottleneck with method study.

What exam hint can help solve this Business Studies question?

bottleneck पूरी process का मुद्दा है। परीक्षा में process bottleneck को method study से जोड़ें।