यदि योजना में संभावित बाधाओं की सूची तो बनी है पर वैकल्पिक तैयारी नहीं है तो कौन सा महत्व अधूरा रहेगा?
If possible obstacles are listed in planning but no alternative preparation exists which importance will remain incomplete?
Explanation opens after your attempt
D. अनिश्चितता के जोखिम को कम करनाReducing risk of uncertainty
Concept
Only identifying obstacles is not enough preparation is also needed. In exams connect risk reduction with preparation.
Why this answer is correct
The correct answer is D. अनिश्चितता के जोखिम को कम करना / Reducing risk of uncertainty. Only identifying obstacles is not enough preparation is also needed. In exams connect risk reduction with preparation.
Exam Tip
सिर्फ बाधा पहचानना काफी नहीं है तैयारी भी जरूरी है। परीक्षा में risk reduction को तैयारी से जोड़ें।