यदि machine route और material सही हैं पर final product defect है तो checking role पहले किसका है?
If machine route and material are correct but final product is defective whose checking role comes first?
Explanation opens after your attempt
A. Inspector
Concept
Inspector checks final product quality. Exam tip: separate checking role from correction role.
Why this answer is correct
The correct answer is A. Inspector. Inspector checks final product quality. Exam tip: separate checking role from correction role.
Exam Tip
Final product quality checking inspector करता है। परीक्षा में checking role और correction role अलग रखें।
Login to save your score, XP, coins and progress.
