यदि machine ठीक है route सही है और material ready है लेकिन final product defect है तो checking role पहले किसका है?
If machine is proper route is correct and material is ready but final product is defective whose checking role comes first?
Explanation opens after your attempt
A. इंस्पेक्टरInspector
Concept
Inspector checks final product quality. Exam tip: separate checking role and correction role.
Why this answer is correct
The correct answer is A. इंस्पेक्टर / Inspector. Inspector checks final product quality. Exam tip: separate checking role and correction role.
Exam Tip
Final product quality checking inspector करता है। परीक्षा में checking role और correction role अलग रखें।
Login to save your score, XP, coins and progress.
