Update

Muft Shiksha™ एक 100% Free Education Portal है 🇮🇳, जिसका उद्देश्य Class 9–12 के हर विद्यार्थी तक High-Quality Education को पूरी तरह मुफ्त पहुँचाना है। 🇮🇳 हम मानते हैं कि अच्छी शिक्षा किसी student की आर्थिक स्थिति पर निर्भर नहीं होनी चाहिए। 🇮🇳 हर विद्यार्थी को वही Quality Study Material, MCQs, Quizzes, Exam Preparation, Concept-Based Learning और Bilingual Support मिलना चाहिए, जो आमतौर पर महंगी Coaching या Premium Platforms में मिलता है। Muft Shiksha™ 🇮🇳 इसी सोच के साथ बनाया गया है

Subjects

RELATED QUESTIONS

Class 12 Mcq

Class 12 Business Studies के इस tag से जुड़े questions। हर question के साथ chapter, topic, level और difficulty दी गई है।

Business StudiesIf standards and variances are appropriate but a bottleneck remains in the production process, which scientific-management technique is still required?Class 12Principles of ManagementTechniques of scientific managementLevel 43HardBusiness StudiesA worker produces 142 units, of which 5 are rejected. If each accepted unit is paid at the stated high rate of ₹9, what wage is payable on accepted output?Class 12Principles of ManagementTechniques of scientific managementLevel 43HardBusiness StudiesTotal available time is 780 minutes, including 90 minutes of necessary rest. If the time allowed per unit is 15 minutes, what is the correct standard output?Class 12Principles of ManagementTechniques of scientific managementLevel 43MediumBusiness StudiesIf workers deliberately ignore standard instructions and rejection increases, which specialist is needed along with the inspector?Class 12Principles of ManagementTechniques of scientific managementLevel 43HardBusiness StudiesIf workers were not trained in the correct method but still produced the required high output, what gap is present?Class 12Principles of ManagementTechniques of scientific managementLevel 45MediumBusiness StudiesIf 48 units are produced in 720 minutes, what is the standard time allowed per unit?Class 12Principles of ManagementTechniques of scientific managementLevel 45EasyBusiness StudiesIf the production target is high and no rest plan is provided, what is the most practical risk?Class 12Principles of ManagementTechniques of scientific managementLevel 45MediumBusiness StudiesIf accepted output is 136 units and the high rate is ₹10 per unit, what will be the wage?Class 12Principles of ManagementTechniques of scientific managementLevel 45EasyBusiness StudiesWhich option gives the correct sequence of method study and time study?Class 12Principles of ManagementTechniques of scientific managementLevel 45MediumBusiness StudiesA worker produces 150 units. The standard is 145 units and the high rate is ₹7 per unit. Six units are rejected. What will be the wage on gross output?Class 12Principles of ManagementTechniques of scientific managementLevel 45MediumBusiness StudiesA worker produces 150 units. The standard is 145 units and the high rate is ₹7 per unit. Six units are rejected. What will be the wage on accepted output?Class 12Principles of ManagementTechniques of scientific managementLevel 45HardBusiness StudiesIf the standard time is 9 minutes and motion study shows that the best method takes 6 minutes, which conclusion is correct?Class 12Principles of ManagementTechniques of scientific managementLevel 44HardBusiness StudiesIf actual time is lower but worker fatigue is very high, which analysis is necessary before revising the target?Class 12Principles of ManagementTechniques of scientific managementLevel 44HardBusiness StudiesIf the output standard is 80 units and the worker produces exactly 80, but the policy does not state which rate applies in an equal case, what should be done?Class 12Principles of ManagementTechniques of scientific managementLevel 44HardBusiness StudiesA worker produces 132 units. The standard is 125 units and the high rate is ₹6 per unit. Seven units are rejected. If payment is based on gross output, what will be the wage?Class 12Principles of ManagementTechniques of scientific managementLevel 44MediumBusiness StudiesThe standard is 115 units. A worker produces 119 units, and the high rate is ₹12 per unit. What will be the wage?Class 12Principles of ManagementTechniques of scientific managementLevel 44MediumBusiness StudiesTotal time is 720 minutes, including 80 minutes of necessary rest, and the time per unit is 16 minutes. What will be the standard output?Class 12Principles of ManagementTechniques of scientific managementLevel 44MediumBusiness StudiesIf the machine is proper but workers do not reach the target because speed is too slow, which specialist, not the repair boss, will be central?Class 12Principles of ManagementTechniques of scientific managementLevel 44MediumBusiness StudiesIn a factory the production route was shortened but workers did not receive the new route in written instructions. Which coordination is weak?Class 12Principles of ManagementTechniques of scientific managementLevel 44HardBusiness StudiesIf walking distance is reduced and then the daily target is changed, what interaction is shown?Class 12Principles of ManagementTechniques of scientific managementLevel 43Medium

Add Muft Shiksha to your Home Screen

In Safari, tap Share, then Add to Home Screen.