If repeated delay appears in follow-up, what should the manager do instead of only extending the deadline?यदि follow-up में repeated delay दिखे तो manager को केवल deadline बढ़ाने के बजाय क्या करना चाहिए?
Answer and explanationउत्तर और व्याख्या
Correct answer:सही उत्तर: Root cause analysis and corrective actionroot cause analysis और corrective action
Repeated deviation shows a deeper cause. In exams, connect follow-up with root cause correction.repeated deviation deeper cause दिखाता है। परीक्षा में follow-up को root cause correction से जोड़ें।